← Back
BuildNYC
Condo, commercial tower (mixed-use) [derived]
15 WEST 34TH STREET
MANHATTAN · BIN 1015874
💬 Discuss this project
1907Year Built
8Stories
RCBuilding Class
C5-3Zoning
47,963 sfGross Floor Area
8Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only 3 likely answered 3 old, status unconfirmed ▸FISP: SAFE
Condo, commercial tower (mixed-use) [derived] · 6,325 sf lot · 7.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects15 West 34th Street Condominium3 filings
RoofReplacement of two roof mounted air cooled condensers1p · 1 filing · 4 docs
Floor 2Home Basic2p · 3 filings · 9 docs
Floor 1Installation of Heavy Duty Sidewalk Shed/ Temporary Pipe Sca1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
15 West 34th St4403/21/2026
VHF 34th1407/08/2026
Wharton Properties1303/21/2026
Hampton Industries1203/21/2026
15 West 34th Street Condominium607/08/2026
West 34th Street Holdings203/21/2026
Tyfun Contracting103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SC Engineering109/01/2026
Mje Professional Services212/18/2025
Paper Plane Architecture111/17/2025
A&B World Consulting105/10/2023
Spencer212/22/2021
Goldman Copeland Associates206/17/2021
Levin Engineering104/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR Expediting Design403/21/2026
Codegreen403/21/2026
Levin Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Noah Office RenovationGeneral Contractor407/08/2026
FirequestFire Protection307/08/2026
Hundertmark RichardElectrical203/21/2026
JascoScaffold204/09/2026
Millennium Maintenance & ElectricalElectrical203/21/2026
Plumbing P & HPlumbing107/08/2026
Power-Tech Installation ElectricElectrical103/21/2026
Pomalee Electric CoElectrical103/21/2026
RPJ ElectricElectrical103/21/2026
AC Universal SupplyGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B World Consulting5704105/10/2023
Goldman Copeland Associates2826312/22/2021
Levin Engineering1267104/08/2021
Building Lifecycle
All (130)Filed (10)Permit Issued (11)Signed Off (5)Facade (FISP) (13)Violation (60)Inspection (2)Objection (10)Special Inspection (19)
09/24/2026
Objection raised — Fire_Protection
09/24/2026
Objection raised — Cost
09/24/2026
Objection raised — Scope
09/24/2026
Objection raised — Structural
09/01/2026
Filed — Alteration
Make modifications to the existing sprinkler system as needed and as identified on the drawings. Provide new fire pump design.
M01435282-I1
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/23/2026
Special inspection requirement — Sprinkler Systems
06/17/2026
Cycle 10 facade report signed — SAFE
06/09/2026
Cycle 10 facade report submitted
04/30/2026
Cycle 10 facade inspection completed
04/16/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01314285-I1
12/18/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01314285-P1
12/08/2025
Permit issued — Supported Scaffold
M01314285-I1-SH
12/08/2025
Permit issued — Sidewalk Shed
M01314285-I1-SF
11/17/2025
Filed — Alteration
FISP-related facade restoration including masonry and parapet repairs, repointing, and sealant replacement. No change in use, egress, or occupancy.
M01307433-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/05/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01314285-I1
10/23/2025
Special inspection requirement — Final
04/15/2024
Signed off — Alteration
REPLACEMENT OF TWO (2) ROOF MOUNTED AIR COOLED CONDENSERS
M00855696-I1
04/05/2024
Permit issued — Mechanical Systems
M00855696-I1-MS
05/10/2023
Filed — Alteration
REPLACEMENT OF TWO (2) ROOF MOUNTED AIR COOLED CONDENSERS
M00855696-I1
05/08/2023
Permit issued — Sprinklers
M00426747-I1-EW-SP
04/05/2023
Special inspection requirement — Mechanical Systems
Alexander Bomstein
04/05/2023
Special inspection requirement — Final
Alexander Bomstein
06/02/2022
Permit issued — Sprinklers
M00426747-I1-EW-SP
05/02/2022
Signed off — Alteration
Installation of new plumbing fixtures: (1) dishwasher, (1) chiller, (1) HWH, (2) pantry sinks, (2) drain pumps, (1) funnel drain and associated Cold Water/Sanitary Piping on the 2nd Floor as per plans (Home Basic.) No change to use, egress or occupancy.
M00535528-I1
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/04/2022
Signed off — Alteration
Modifications to the existing HVAC System; Installation of new sheet metal ductwork and VAV's as per plans (Home Basic.) No change to use, egress or occupancy.
M00535246-I1
02/02/2022
Signed off — Alteration
Minor interior demolition, removal of partitions and finishes. Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 2nd floor as per plans (Home Basic.) No change to use, egress or occupancy.
M00535105-I1
01/05/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/04/2022
Special inspection requirement — Final
DANIEL COLOMBINI
01/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL COLOMBINI
12/22/2021
Filed — Alteration
Minor interior demolition, removal of partitions and finishes. Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 2nd floor as per plans (Home Basic.) No change to use, egress or occupancy.
M00535105-P1
12/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL COLOMBINI
12/15/2021
Special inspection requirement — Final
DANIEL COLOMBINI
08/25/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2021
Permit issued — General Construction
M00535105-I1-GC
08/06/2021
Permit issued — Mechanical Systems
M00535246-I1-MS
07/21/2021
Permit issued — Plumbing
M00535528-I1-PL
06/23/2021
Permit issued — General Construction
M00535105-I1-GC
06/23/2021
Permit issued — Mechanical Systems
M00535246-I1-MS
06/17/2021
Filed — Alteration
Installation of new plumbing fixtures: (1) dishwasher, (1) chiller, (1) HWH, (2) pantry sinks, (2) drain pumps, (1) funnel drain and associated Cold Water/Sanitary Piping on the 2nd Floor as per plans (Home Basic.) No change to use, egress or occupancy.
M00535528-I1
06/17/2021
Filed — Alteration
Modifications to the existing HVAC System; Installation of new sheet metal ductwork and VAV's as per plans (Home Basic.) No change to use, egress or occupancy.
M00535246-I1
06/17/2021
Filed — Alteration
Minor interior demolition, removal of partitions and finishes. Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 2nd floor as per plans (Home Basic.) No change to use, egress or occupancy.
M00535105-I1
06/11/2021
Special inspection requirement — Electrical motors and elevators
DANIEL COLOMBINI
06/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL COLOMBINI
06/11/2021
Special inspection requirement — Energy Code Compliance Inspections
DANIEL COLOMBINI
06/11/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL COLOMBINI
06/11/2021
Special inspection requirement — Maintenance information
DANIEL COLOMBINI
06/07/2021
Special inspection requirement — Final
DANIEL COLOMBINI
06/07/2021
Special inspection requirement — Mechanical Systems
DANIEL COLOMBINI
05/10/2021
Permit issued — Sprinklers
M00426747-I1-EW-SP
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2021
Objection raised — Inspections
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Scope
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Inspections
04/16/2021
Objection resolved — Addressed
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offJasco12/08/2025
DOB NOWSidewalk ShedSigned-offJasco12/08/2025
DOB NOWMechanical SystemsSigned-offAC Universal Supply04/05/2024
DOB NOWSprinklersPermit IssuedFirequest05/08/2023
DOB NOWSprinklersPermit IssuedFirequest06/02/2022
DOB NOWGeneral ConstructionSigned-offNoah Office Renovation08/11/2021
DOB NOWMechanical SystemsSigned-offNoah Office Renovation08/06/2021
DOB NOWPlumbingSigned-offPlumbing P & H07/21/2021
DOB NOWGeneral ConstructionSigned-offNoah Office Renovation06/23/2021
DOB NOWMechanical SystemsSigned-offNoah Office Renovation06/23/2021
DOB NOWSprinklersPermit IssuedFirequest05/10/2021
BISOTISSUEDEner-Con Technical Services02/01/2019
BISOTISSUEDOZ Bosph Construction04/17/2018
BISMHISSUEDAir Stream Air Conditioning03/13/2017
BISMHISSUEDPrecision-Aire03/11/2015
BIS—ISSUEDNational Maintenance06/11/2014
BIS—ISSUEDNational Maintenance06/11/2014
BISSPISSUEDUnited Plumbing Mechanical05/09/2014
BISPLISSUEDSchmelz Brothers03/26/2014
BISOTISSUEDJames M. Barb Construction03/24/2014
BISEQISSUEDColgate Enterprise03/10/2014
BISEQISSUEDColgate Enterprise03/10/2014
BISEQISSUEDColgate Enterprise03/10/2014
BISOTISSUEDJames M. Barb Construction03/07/2014
BISMHISSUEDMW Citi Wide Construction02/04/2014
BISOTISSUEDAllied Contracting II05/30/2013
BISEQISSUEDCSC of NY05/10/2013
BISOTISSUEDTom Rectenwald Construction12/01/2010
BISOTISSUEDTom Rectenwald Construction12/01/2010
BISOTISSUEDPaul M Maintenance04/26/2010
BIS—ISSUEDBerger Signs11/19/2009
BISEQISSUEDEverest Scaffolding10/22/2009
BISSPISSUEDVip Fire Sprinkler10/08/2009
BISEQISSUEDRidge Construction09/23/2009
BISOTISSUEDRidge Construction09/16/2009
BISOTISSUEDPaul M Maintenance08/10/2009
BISOTISSUEDBid Interior Contracting10/10/2006
BISMHISSUEDBid Interior Contracting10/10/2006
BISPLISSUEDPlumbing & Heating Doctor10/29/2004
BISOTISSUEDNoah Interior Consulting10/21/2004
+ 21 more permits on file
2 projects · most recent 09/01/2026
FiledStatusContractorScope
09/01/2026——465 heads
04/08/2021Permit IssuedFirequest—
4 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteEnercharge Electric Cont—
11/10/2025Permit IssuedRichard Neu—
08/10/2021CompletePower Electrical ContsGeneral Wiring
03/18/2019Permit IssuedAccurate ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/30/2026Energy Code Compliance Inspections—progress
07/30/2026Fire-Resistant Penetrations and Joints—special
07/23/2026Sprinkler Systems—special
10/23/2025Final—progress
04/05/2023Mechanical SystemsAlexander Bomsteinspecial
04/05/2023FinalAlexander Bomsteinprogress
01/04/2022FinalDANIEL COLOMBINIprogress
01/04/2022Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
12/15/2021Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
12/15/2021FinalDANIEL COLOMBINIprogress
06/11/2021Electrical motors and elevatorsDANIEL COLOMBINIenergy_progress
06/11/2021Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
06/11/2021Energy Code Compliance InspectionsDANIEL COLOMBINIprogress
06/11/2021HVAC-R and service water piping design and insulationDANIEL COLOMBINIenergy_progress
06/11/2021Maintenance informationDANIEL COLOMBINIenergy_progress
06/07/2021FinalDANIEL COLOMBINIprogress
06/07/2021Mechanical SystemsDANIEL COLOMBINIspecial
11/11/2020Fire-Resistant Penetrations and JointsDmitry Levinspecial
11/11/2020Sprinkler SystemsDmitry Levinspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Home BasicOfficeFloor 2
Project M00535105 Alteration · LOC Issued · 06/17/2021
Project M00535246 Alteration · LOC Issued · 06/17/2021
Project M00535528 Alteration · LOC Issued · 06/17/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 380 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
10/04/2026M01435282-I1Request digital key ↗
09/03/2026M00535246-I1Request digital key ↗
09/03/2026M00535528-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026M00426747-I1Request digital key ↗
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION36
12/17/2025123428433Open ↗
04/19/2018123428433Open ↗
03/17/2017123036543Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION29
02/04/2019123428433Open ↗
04/17/2018123428433Open ↗
03/17/2017123036543Open ↗
Showing 3 of 29 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/20/2015121917881Open ↗
▸Seals & Professional Certifications114
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
04/19/2018123428433Open ↗
03/17/2017123036543Open ↗
01/06/2016140170446Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST19
04/19/2018123428433Open ↗
03/17/2017123036543Open ↗
06/29/2015121992683Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
05/14/2013121616386Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
04/19/2018123428433Open ↗
03/17/2017123036543Open ↗
05/09/2014121992683Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
10/04/2026M01435282-I1Open ↗
09/03/2026M00535246-I1Open ↗
09/03/2026M00535105-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026M00535105-I1Open ↗
08/26/2026M00535246-I1Open ↗
08/26/2026M00535246-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026M00535105-I1Open ↗
08/27/2026M00426747-I1Open ↗
08/27/2026M00426747-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
03/07/2014140170446Open ↗
03/07/2014140170437Open ↗
03/07/2014140170428Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
03/07/2014140170446Open ↗
03/07/2014140170437Open ↗
03/07/2014140170428Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment21
▸BISEQUIPMENT USE PERMITS7
07/17/2015121992683Open ↗
06/05/2014140132005Open ↗
06/05/2014140132005Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
05/28/2014121917881Open ↗
04/17/2014121917881Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
07/21/2015121992683Open ↗
07/17/2015121992683Open ↗
06/19/2014140132005Open ↗
Showing 3 of 4 on file for this type
▸BISSIGN HANGER CERTIFICATE2
06/14/2014121966104Open ↗
06/14/2014121966113Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/03/2016121980080Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/04/2014121965276Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
04/19/2018123428433Open ↗
▸Environmental & Asbestos37
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
04/19/2018123428433Open ↗
03/17/2017123036543Open ↗
06/14/2014121966104Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/04/2026M01435282-I1Open ↗
09/03/2026M00535246-I1Open ↗
09/03/2026M00535105-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/19/2018123428433Open ↗
03/17/2017123036543Open ↗
07/21/2015121992683Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/21/2015121992683Open ↗
02/20/2015121917881Open ↗
04/18/2014140164051Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/27/2014140164051Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/07/2014140170446Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/27/2014140164051Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/17/2025123428433Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/21/2014121605664Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00535246-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/07/2014140170446Open ↗
03/07/2014140170437Open ↗
03/07/2014140170428Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/17/2025123428433Open ↗
▸Approvals, Objections & Sign-offs38
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
01/29/2016121966113Open ↗
01/29/2016121966104Open ↗
01/06/2016140170446Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
05/14/2013121616386Open ↗
05/07/2013121605664Open ↗
Showing 2 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
02/04/2019123428433Open ↗
01/06/2016140170446Open ↗
12/03/2015140170437Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/20/2026M01314285-I1Open ↗
08/20/2026M01314285-P1Open ↗
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT35
04/19/2018123428433Open ↗
03/17/2017123036543Open ↗
01/29/2016121966113Open ↗
Showing 3 of 35 on file for this type
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET23
04/19/2018123428433Open ↗
03/17/2017123036543Open ↗
05/09/2014121992683Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
03/07/2014140170446Open ↗
03/07/2014140170437Open ↗
03/07/2014140170428Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
07/17/2015121992683Open ↗
04/08/2014121917881Open ↗
03/17/2014140170446Open ↗
Showing 3 of 5 on file for this type