150 EAST 80 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1047486
💬 Discuss this project
1932Year Built
4Stories
M1Building Class
C1-8XZoning
23,713 sfGross Floor Area
2Units
2 Open Violations ▸
Church, synagogue, chapel · Owner of record: FIRST CONG CHURCH · 12,464 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction65p · 6 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 7 docs
PenthouseUnder Construction47p · 3 filings · 20 docs
Floor 4Under Construction53p · 5 filings · 20 docs
Floor 3Under Construction30p · 4 filings · 20 docs
Floor 2Under Construction29p · 3 filings · 20 docs
Floor 1Under Construction30p · 2 filings · 20 docs
CellarUnder Construction44p · 9 filings · 20 docs
Basement23p · 5 filings · 20 docs
Sub-BasementUnder Construction18p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITARIAN CHURCH OF ALL SOULS9809/13/2026
EARTH LINK GENERAL CONSTRUCTION,INC903/22/2026
FIRST CONG CHURCH ALL SOU103/22/2026
FIRST CONG CHURCH403/22/2026
JC CONSULTING & MANAGEMEN103/22/2026
THEUNITARIANCHURCHOFALLSOULS103/22/2026
HKS CONSTRUCTION303/21/2026
B H B CONSTRUCTION503/21/2026
ALL SOULS CHURCH403/21/2026
ALL SOULS UNITARIAN CHURCH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOHLER ENGINEERING603/21/2026
EMPIRE CITY CONSULTANTS, INC.603/21/2026
SPRING SCAFFOLDING LLC2203/21/2026
A1 EXPEDITING SERVICE CORP.1203/21/2026
UNITARIAN CHURCH OF ALL SOULS203/21/2026
MUNICIPAL EXPEDITING2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor3308/26/2026
SPK/LEWIS CONSTRUCTION LLGeneral Contractor1007/08/2026
JM&A CONSTRUCTION CORPGeneral Contractor907/08/2026
CONSIGLI CONSTRUCTION COGeneral Contractor708/05/2026
EARTH LINK GENERAL CONSTRGeneral Contractor603/21/2026
HARLAND MECHANICAL INCGeneral Contractor207/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
MAGIC MECHANICAL INCPlumbing107/08/2026
JOSEPH SORTINOElectrical103/21/2026
PSI PARTNERS, LLCFire Protection107/08/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
DAVID KLEEMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843606/10/2026
ALAN MARGOLIN & ASSOC4231108/29/2023
CFS ENGINEERING, PC615304/05/2022
Building Lifecycle
All (300)Filed (52)Permit Issued (52)Signed Off (18)Violation (51)Inspection (19)Objection (78)Special Inspection (30)
08/12/2026
Permit issued — Sidewalk Shed
M01053179-S2-SH
08/04/2026
Permit issued — Mechanical Systems
M01370015-S1-MS
07/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Permit issued — General Construction
M01370015-I1-GC
07/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/08/2026
Permit issued — Sidewalk Shed
M01053179-I1-SH
07/08/2026
Permit issued — Supported Scaffold
M01053179-S1-SF
06/16/2026
Permit issued — Mechanical Systems
M01300598-S2-MS
06/16/2026
Permit issued — Structural
M01300598-S1-ST
06/10/2026
Filed — Alteration
Removal and replacement of existing roofing assemblies down to the structural deck at Penthouse-1, Stair D and Bulkhead
M01370015-S1
06/04/2026
Permit issued — Plumbing
M01300598-S3-PL
06/01/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
06/01/2026
Special inspection requirement — Final
JOHN MCMONAGLE
06/01/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
05/29/2026
Permit issued — Sidewalk Shed
M01053179-S2-SH
05/15/2026
Permit issued — Structural
M01300570-S3-ST
05/15/2026
Permit issued — General Construction
M01300598-I1-GC
05/15/2026
Permit issued — General Construction
M01300570-I1-GC
04/28/2026
Objection resolved — Addressed
04/26/2026
Objection raised — Other
04/26/2026
Objection raised — Scope
04/21/2026
Objection resolved — Addressed
04/21/2026
Objection resolved — Addressed
04/17/2026
Objection raised — Scope
04/10/2026
Filed — Alteration
Removal and replacement of existing roofing assemblies down to the structural deck at Penthouse-1, Stair D and Bulkhead
M01370015-I1
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
03/17/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE EAST NEIGHBOR'S (162 E 80TH ST) SIDE YARD PROPERTY LINE.
M01053179-P6
03/17/2026
Permit issued — Protection and Mechanical Methods
M01053179-S7-PMM
03/17/2026
Permit issued — Protection and Mechanical Methods
M01053179-S5-PMM
03/17/2026
Permit issued — Protection and Mechanical Methods
M01053179-S4-PMM
03/17/2026
Permit issued — Protection and Mechanical Methods
M01053179-S8-PMM
03/17/2026
Permit issued — Protection and Mechanical Methods
M01053179-S6-PMM
03/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE EAST NEIGHBOR'S (162 E 80TH ST) SIDE YARD PROPERTY LINE.
M01053179-S4
03/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE EAST NEIGHBOR'S (162 E 80TH ST) SIDE YARD PROPERTY LINE.
M01053179-S6
03/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE EAST NEIGHBOR'S (162 E 80TH ST) SIDE YARD PROPERTY LINE.
M01053179-S7
03/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE EAST NEIGHBOR'S (162 E 80TH ST) SIDE YARD PROPERTY LINE.
M01053179-P5
03/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE EAST NEIGHBOR'S (162 E 80TH ST) SIDE YARD PROPERTY LINE.
M01053179-S8
03/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE EAST NEIGHBOR'S (162 E 80TH ST) SIDE YARD PROPERTY LINE.
M01053179-S5
03/09/2026
Permit issued — Sidewalk Shed
M01053179-I1-SH
03/06/2026
Permit issued — Sidewalk Shed
M01053179-S2-SH
01/12/2026
Objection raised — Scope
01/09/2026
Objection raised — Scope
01/09/2026
Objection raised — Scope
01/09/2026
Objection raised — Scope
01/09/2026
Objection raised — Scope
01/09/2026
Objection raised — Scope
01/09/2026
Objection raised — Scope
01/09/2026
Objection raised — Scope
01/07/2026
Objection resolved — Addressed
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC08/12/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO08/04/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO07/29/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC07/08/2026
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC07/08/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO06/16/2026
DOB NOWStructuralPermit IssuedCONSIGLI CONSTRUCTION CO06/16/2026
DOB NOWPlumbingPermit IssuedMAGIC MECHANICAL INC06/04/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC05/29/2026
DOB NOWStructuralPermit IssuedCONSIGLI CONSTRUCTION CO05/15/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO05/15/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO05/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC03/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC03/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC03/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC03/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC03/17/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/09/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC12/15/2025
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC07/08/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC07/08/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC01/24/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC07/08/2024
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC07/08/2024
DOB NOWSuspended ScaffoldPermit IssuedJEPOL CONSTRUCTION INC03/14/2024
DOB NOWGeneral ConstructionSigned-offJM&A CONSTRUCTION CORP09/05/2023
DOB NOWConstruction FencePermit IssuedJM&A CONSTRUCTION CORP04/21/2023
DOB NOWSupported ScaffoldPermit IssuedJM&A CONSTRUCTION CORP04/21/2023
DOB NOWConstruction FencePermit IssuedJM&A CONSTRUCTION CORP04/21/2023
DOB NOWSidewalk ShedSigned-offEARTH LINK GENERAL CONSTR04/20/2023
DOB NOWSupported ScaffoldSigned-offEARTH LINK GENERAL CONSTR04/20/2023
DOB NOWGeneral ConstructionSigned-offJM&A CONSTRUCTION CORP04/14/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY03/27/2023
DOB NOWMechanical SystemsSigned-offSPK/LEWIS CONSTRUCTION LL12/19/2022
DOB NOWGeneral ConstructionPermit IssuedSPK/LEWIS CONSTRUCTION LL10/06/2022
DOB NOWGeneral ConstructionSigned-offSPK/LEWIS CONSTRUCTION LL09/21/2022
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP08/18/2022
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC08/12/2022
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP07/12/2022
+ 49 more permits on file
1 project · most recent 06/10/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2026Permit IssuedCONSIGLI CONSTRUCTION COVentilation Systems
Ventilation
Greenheck USF-15-B7 1,600 CFM · Exhaust Fan ×1
14 projects · most recent 04/08/2026
General Wiring Lighting
FiledStatusContractorScope
04/08/2026Permit IssuedINTER CONNECTION ELETRIC—
05/16/2024Permit IssuedTOP SHELF ELECTRIC CORP—
08/30/2023CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
07/06/2023CompletePROSTO ELECTRIC CORPLighting
04/20/2023CompleteRICHARD NEU—
04/18/2023CompletePROJECT ONE ELECTRIC INCGeneral Wiring
11/02/2022CompleteMHO'S ELECTRIC CORPGeneral Wiring
07/08/2022CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
06/13/2022CompleteA.S.K. ELECTRICAL CORP—
03/15/2021Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
11/09/2019CompleteLMEC ELECTRIC INCLighting
06/17/2019CompleteLMEC ELECTRIC INC—
03/27/2019CompleteWARREN ELEVATOR SVC COGeneral Wiring
02/21/2019CompleteTOP SHELF ELECTRIC CORP—
2 projects · most recent 12/09/2025
Steel Masonry Concrete
FiledStatusContractorScope
12/09/2025Permit IssuedCONSIGLI CONSTRUCTION COSteel, Masonry
12/09/2025Permit IssuedCONSIGLI CONSTRUCTION COSteel, Concrete, Masonry
1 project · most recent 03/17/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/17/2026Permit IssuedSPRING SCAFFOLDING LLCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
07/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/12/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/17/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/24/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
06/01/2026Maintenance informationJOHN MCMONAGLEenergy_progress
06/01/2026FinalJOHN MCMONAGLEprogress
06/01/2026Mechanical SystemsJOHN MCMONAGLEspecial
12/30/2025MasonryJOHN MCMONAGLEspecial
12/22/2025Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
11/17/2025MasonryJOHN MCMONAGLEspecial
11/17/2025Structural Steel - WeldingJOHN MCMONAGLEspecial
11/17/2025Structural Steel - High Strength BoltingJOHN MCMONAGLEspecial
11/17/2025Structural Steel - DetailsJOHN MCMONAGLEspecial
11/17/2025Post-installed AnchorsJOHN MCMONAGLEspecial
11/17/2025Maintenance informationJOHN MCMONAGLEenergy_progress
11/17/2025Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
11/17/2025Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
11/17/2025Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
11/17/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
11/17/2025Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
11/17/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/22/2025Mechanical SystemsJOHN MCMONAGLEspecial
10/22/2025FinalJOHN MCMONAGLEprogress
10/21/2025FinalJOHN MCMONAGLEprogress
09/07/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
09/07/2023Fire-Resistance Rated ConstructionYoung Suhprogress
09/07/2023Energy Code Compliance InspectionsYoung Suhprogress
09/07/2023Interior lighting powerYoung Suhenergy_progress
09/07/2023Lighting controlsYoung Suhenergy_progress
Latest 25 of 69.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Unitarian Church of All SoulsOtherFloors 1, 4–7, Penthouse, Roof
Project M01300570 Alteration · Permit Entire · 12/09/2025
Project M01300598 Alteration · Permit Entire · 12/09/2025
All Souls SchoolEducationCellar, Sub-basement, Basement, Floors 1–4
Project M00742015 Alteration · LOC Issued · 12/15/2022
Project M00764032 Alteration · LOC Issued · 07/29/2022
Project M00738319 Alteration · LOC Issued · 06/29/2022
Project M00738325 Alteration · LOC Issued · 06/29/2022
Project M00733950 Alteration CO · Permit Entire · 06/24/2022
Project M00738323 Alteration · LOC Issued · 06/21/2022
Project M00750925 Alteration · LOC Issued · 06/06/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 515 on file (BIS + DOB NOW)
▸Plans & Drawings52
▸DOB NOWPlans/Sketch49
09/03/2026M00573775-I1Request digital key ↗
09/03/2026M00564550-P3Request digital key ↗
09/03/2026M00564550-I1Request digital key ↗
Showing 3 of 49 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00134624-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00131535-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00131555-I1Request digital key ↗
▸Applications & Permits63
▸BISPLAN / WORK APPROVAL APPLICATION40
12/03/2020123492942Open ↗
08/27/2020122815114Open ↗
08/19/2020123492924Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION19
10/02/2019123492924Open ↗
10/02/2019123492915Open ↗
10/02/2019123492915Open ↗
Showing 3 of 19 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications168
▸DOB NOWDPL-1: Design Professional Seal & Signature51
09/05/2026M00131535-I1Open ↗
09/05/2026M00134624-I1Open ↗
09/03/2026M00573775-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/19/2026M08019635-I1Open ↗
09/02/2026M00806790-I1Open ↗
09/01/2026M00733950-P2Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
05/24/2019123492924Open ↗
05/24/2019123492924Open ↗
04/24/2019123492915Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026M00564550-I1Open ↗
09/01/2026M00738325-I1Open ↗
09/01/2026M00733950-P2Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
08/01/2019140862797Open ↗
02/21/2019140833677Open ↗
01/24/2019123492942Open ↗
Showing 3 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
08/01/2019140862797Open ↗
02/21/2019140833677Open ↗
05/04/2016140491572Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
08/01/2019140862797Open ↗
02/21/2019140833677Open ↗
05/04/2016140491572Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/24/2019123492942Open ↗
06/17/2016122736227Open ↗
08/12/2015122473803Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment12
▸BISEQUIPMENT USE PERMITS5
07/20/2021123492924Open ↗
07/20/2021123492924Open ↗
07/20/2021123492924Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
08/19/2020123492924Open ↗
07/17/2020123492924Open ↗
07/13/2020123492924Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/08/2021123492924Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/29/2022122815114Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/24/2019123492924Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/14/2026M00733950-I1Open ↗
08/14/2026M00733950-P1Open ↗
08/13/2026M00733950-P2Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/24/2019123492924Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/03/2026M00573775-I1Open ↗
09/02/2026M00693403-I1Open ↗
09/02/2026M00738325-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/02/2026M00764032-I1Open ↗
08/31/2026M00806790-I1Open ↗
08/14/2026M08015994-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/12/2015122473803Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0601MN191
12/01/2025123492915Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
05/24/2019123492924Open ↗
04/24/2019123492915Open ↗
01/25/2019123492942Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
08/15/2026M00738323-I1Open ↗
08/13/2026M00733950-I1Open ↗
09/03/2026M00573775-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/04/2017122736227Open ↗
04/11/2016122473803Open ↗
05/04/2015122061598Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/01/2025123492915Open ↗
07/08/2021123492924Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/01/2025123492915Open ↗
07/08/2021123492924Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/19/2016140472646Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY11
12/01/2025123492915Open ↗
03/08/2021123492915Open ↗
02/01/2021140833677Open ↗
Showing 3 of 11 on file for this type
▸BISMECHANICAL SYSTEMS1
07/08/2021123492924Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/08/2021123492924Open ↗
▸Approvals, Objections & Sign-offs99
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST41
12/01/2025123492915Open ↗
07/06/2022122815114Open ↗
07/13/2021123492924Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter36
09/02/2026M00693403-I1Open ↗
09/02/2026M00738325-I1Open ↗
08/28/2026M00991677-I1Open ↗
Showing 3 of 36 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
10/22/2015110319637Open ↗
09/24/2015110319637Open ↗
09/10/2015110319637Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/01/2025123492915Open ↗
12/01/2025123492915Open ↗
Showing 2 of 4 on file for this type
▸BISSUPERSEDING LETTER4
10/02/2019123492924Open ↗
10/02/2019123492915Open ↗
10/02/2019123492915Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
07/08/2021123492924Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00806790-I1Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT13
03/08/2019123492924Open ↗
03/08/2019123492915Open ↗
01/24/2019122815114Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/01/2025123492915Open ↗
06/30/2022122815114Open ↗
07/08/2021123492924Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
04/24/2019123492915Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET11
01/24/2019123492915Open ↗
01/24/2019123492915Open ↗
01/24/2019123492924Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION9
03/08/2021123492915Open ↗
07/24/2020123492924Open ↗
07/22/2020123492915Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
08/01/2019140862797Open ↗
02/21/2019140833677Open ↗
05/04/2016140491572Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM2
03/23/2020122815114Open ↗
08/02/2019123492924Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
08/14/2026M00733950-I1Open ↗
08/14/2026M00733950-P1Open ↗
Showing 2 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01011137-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026M01370015-I1Open ↗