| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01231431 ↗ | 671 LINCOLN AVENUE BROOKLYN | Alteration | Permit Issued | 09/15/2025 | 09/28/2026 | Design AME SERVICES INC Owner LP PRESERVATION LLC Filer AME SERVICES INC. | Pipe scaffold installation |
| B01193526 ↗ | 378 SUMPTER STREET BROOKLYN | Alteration | Permit Issued | 05/05/2025 | 09/15/2026 | Design SLM ARCHITECTURE, P.C. Filer JM ZONING, LLC. | REPLACEMENT OF EXISTING BOILERS AND BURNERS. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS IS PROPOSED UNDER THIS APPLICATION |
| Q01451780 | 31-35 31 STREET QUEENS | — | Permit Issued | — | 09/01/2026 | — | INSTALLATION OF PIPE SCAFFOLD AT 31-25 31 STREET QUEENS NY 11106 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUP… |
| M00883128 ↗ | 151 WEST 143 STREET MANHATTAN | Alteration | Permit Issued | 03/22/2024 | 08/21/2026 | Design GACE DPC Filer JM ZONING, LLC. | NEW SANITARY PIPING FOR RPZ DRAINAGE, NEW VENT PIPING FOR RPZ DRAIN TRAP, NEW NATURAL GAS PIPING FOR BOILER AND DOMESTIC HOT WATER HEATERS, … |
| M00883137 ↗ | 159 WEST 143 STREET MANHATTAN | Alteration | Permit Issued | 03/21/2024 | 08/21/2026 | Design EMTG CONSULTANTS INC Filer JM ZONING, LLC. | NEW SANITARY PIPING FOR RPZ DRAINAGE, NEW VENT PIPING FOR RPZ DRAIN TRAP, NEW NATURAL GAS PIPING FOR BOILER AND DOMESTIC HOT WATER HEATERS, … |
| M01271833 ↗ | 159-04 HARLEM RIVER DRIVE MANHATTAN | Alteration | Permit Issued | 09/16/2025 | 08/21/2026 | Filer JM ZONING, LLC. | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STON… |
| Name | Projects together | Most recent |
|---|---|---|
| AME SERVICES INC | 9 | 04/28/2026 |
| EMTG CONSULTANTS INC | 6 | 08/20/2026 |
| GACE DPC | 6 | 08/20/2026 |
| URBAN ARCHITECTURAL INITIATIVES | 4 | 08/20/2026 |
| SLM ARCHITECTURE, P.C. | 3 | 08/05/2026 |
| DESIGN BUILD ENGINEERING PLLC | 2 | 04/21/2023 |
| INGLESE ARCHITECTURE AND ENGINEERIN | 2 | 07/07/2026 |
| LOTHROP ASSOCIATES | 2 | 03/10/2023 |
| M. HAMDI GUNAL, PE, P. C. | 2 | 07/07/2026 |
| R CLADDING CONSULTING & ENGINEERING | 2 | 07/07/2026 |
| SHERWOOD DESIGN ENGINEERS | 2 | 07/07/2026 |
| THORNTON TOMASETTI | 2 | 09/16/2022 |
| ASHRAF CORP | 1 | 02/12/2023 |
| AZ PROFESSIONAL ENGINEERING PC | 1 | 08/20/2021 |
| BITOPI CONSULTANTS LLC | 1 | 05/08/2025 |
| DARIUS TORABY ARCHITECTS, P.C. | 1 | 06/21/2022 |
| DIRTWORKS LANDSCAPE ARCHITECTURE | 1 | 08/20/2026 |
| MCLAREN ENGINEERING GROUP | 1 | 08/20/2026 |
| RAND ENGINEERING & ARCHITECTURE | 1 | 10/27/2025 |
| RDS ASSOCIATES CONSULTING ENGINEERS | 1 | 06/11/2024 |
| SUPERSTRUCTURES ENG. + ARCH. | 1 | 02/12/2026 |
| TRIMBLE ARCHITECTURE PC | 1 | 04/01/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| DUAL FUEL PLUBING & HTING | 4 | 08/05/2026 |
| MONADNOCK CONSTRUCTION IN | 4 | 08/20/2026 |
| BELL CONSTRUCTION SVCS | 2 | 08/05/2026 |
| CEGF & G PLUMBING CORP | 2 | 08/05/2026 |
| DUAL FUEL COMPANY LLC | 2 | 08/05/2026 |
| MONADNOCK GEN'L CONT INC | 2 | 08/05/2026 |
| PREMIER CONSTRUCTION INC | 2 | 08/05/2026 |
| PYRAMID ETC COMPANIES, LL | 2 | 07/07/2026 |
| ESG INC | 1 | 04/28/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NEW YORK CITY HOUSING AUTHORITY | 6 | 08/20/2026 |
| KALEL COMPANIES | 5 | 07/07/2026 |
| LP PRESERVATION LLC | 3 | 04/28/2026 |
| CONVENT 332 BETTERMENT CORP. | 2 | 03/29/2023 |
| 260 FIFTH AVENUE LLC | 1 | 03/19/2026 |
| FIT | 1 | 06/21/2022 |
| PIONEER WORKS ART FOUNDATION | 1 | 04/01/2021 |
| The Unitarian Church of All Souls | 1 | 03/10/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| JM ZONING, LLC. | 8 | 08/20/2026 |
| AME SERVICES INC. | 7 | 04/28/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 03/10/2023 |
| BLANCO DESIGN, INC. | 1 | 09/15/2022 |
| CONVENT 332 BETTERMENT CORP. | 1 | 03/29/2023 |
| MUNICIPAL EXPEDITING INC | 1 | 06/21/2022 |
| RENNON CONSTRUCTION | 1 | 02/12/2023 |
| WILLIAM VITACCO ASSOCIATES | 1 | 04/01/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01231431 ↗ | 671 LINCOLN AVENUE BROOKLYN | Alteration | Permit Issued | 09/15/2025 | 09/28/2026 | Design AME SERVICES INC Owner LP PRESERVATION LLC Filer AME SERVICES INC. | Pipe scaffold installation |
| B01193526 ↗ | 378 SUMPTER STREET BROOKLYN | Alteration | Permit Issued | 05/05/2025 | 09/15/2026 | Design SLM ARCHITECTURE, P.C. Filer JM ZONING, LLC. | REPLACEMENT OF EXISTING BOILERS AND BURNERS. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS IS PROPOSED UNDER THIS APPLICATION |
| Q01451780 | 31-35 31 STREET QUEENS | — | Permit Issued | — | 09/01/2026 | — | INSTALLATION OF PIPE SCAFFOLD AT 31-25 31 STREET QUEENS NY 11106 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUP… |
| M00883128 ↗ | 151 WEST 143 STREET MANHATTAN | Alteration | Permit Issued | 03/22/2024 | 08/21/2026 | Design GACE DPC Filer JM ZONING, LLC. | NEW SANITARY PIPING FOR RPZ DRAINAGE, NEW VENT PIPING FOR RPZ DRAIN TRAP, NEW NATURAL GAS PIPING FOR BOILER AND DOMESTIC HOT WATER HEATERS, … |
| M00883137 ↗ | 159 WEST 143 STREET MANHATTAN | Alteration | Permit Issued | 03/21/2024 | 08/21/2026 | Design EMTG CONSULTANTS INC Filer JM ZONING, LLC. | NEW SANITARY PIPING FOR RPZ DRAINAGE, NEW VENT PIPING FOR RPZ DRAIN TRAP, NEW NATURAL GAS PIPING FOR BOILER AND DOMESTIC HOT WATER HEATERS, … |
| M01271833 ↗ | 159-04 HARLEM RIVER DRIVE MANHATTAN | Alteration | Permit Issued | 09/16/2025 | 08/21/2026 | Filer JM ZONING, LLC. | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STON… |
| M01272000 ↗ | 159-04 HARLEM RIVER DRIVE MANHATTAN | Alteration | Permit Issued | 09/16/2025 | 08/21/2026 | Filer JM ZONING, LLC. | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STON… |
| M01272100 ↗ | 159-04 HARLEM RIVER DRIVE MANHATTAN | Alteration | Permit Issued | 09/16/2025 | 08/21/2026 | Filer JM ZONING, LLC. | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STON… |
| M01272654 ↗ | 159-04 HARLEM RIVER DRIVE MANHATTAN | Alteration | Permit Issued | 09/16/2025 | 08/21/2026 | Filer JM ZONING, LLC. | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STON… |
| B01193826 ↗ | 23 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 05/05/2025 | 08/12/2026 | Design SLM ARCHITECTURE, P.C. Filer JM ZONING, LLC. | LANDSCAPING AND SITE IMPROVEMENT INCLUDING REMOVAL AND REPLACEMENT OF PAVING, PLAY EQUIPMENT, SITE FURNISHINGS, LIGHTING, AND PLANTINGS. NO … |
| B01364020 ↗ | 760 ELDERT LANE BROOKLYN | Alteration | Permit Issued | 03/30/2026 | 07/10/2026 | Design AME SERVICES INC Owner LP PRESERVATION LLC Filer AME SERVICES INC. | Installation of suspended scaffolding |
| B01231425 ↗ | 671 LINCOLN AVENUE BROOKLYN | Alteration | Permit Issued | 06/12/2025 | 04/23/2026 | Design AME SERVICES INC Owner LP PRESERVATION LLC Filer AME SERVICES INC. | Installation of Hanging Scaffold |
| B01372985 ↗ | 23 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 03/26/2026 | 03/27/2026 | Design AME SERVICES INC Owner KALEL COMPANIES Filer AME SERVICES INC. | Installation of suspended scaffold |
| B01373014 ↗ | 378 SUMPTER STREET BROOKLYN | Alteration | Permit Issued | 03/26/2026 | 03/27/2026 | Design AME SERVICES INC Owner KALEL COMPANIES Filer AME SERVICES INC. | Installation of suspended scaffold |
| B01373031 ↗ | 23 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 03/25/2026 | 03/25/2026 | Design AME SERVICES INC Owner KALEL COMPANIES Filer AME SERVICES INC. | Installation of suspended scaffold |
| M01370749 ↗ | 258 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/19/2026 | 03/20/2026 | Design AME SERVICES INC Owner 260 FIFTH AVENUE LLC Filer AME SERVICES INC. | Installation of suspended scaffold |
| B01220184 ↗ | 398 LENOX ROAD BROOKLYN | Alteration | Permit Issued | 05/08/2025 | 03/06/2026 | Design BITOPI CONSULTANTS LLC | INSTALLATION OF NEW SIDEWALK SHED AT 394 LENOX ROAD , BROOKLYN, NY 11203 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, … |
| M01293944 ↗ | 258 5 AVENUE MANHATTAN | Alteration | Permit Issued | 10/27/2025 | 03/04/2026 | 10th Cycle FISP Repair including, but not limited to, brick replacement, lintel replacement, terra cotta repair/replacement, limestone repai… | |
| B01344940 ↗ | 300 JAY STREET BROOKLYN | Alteration | Permit Issued | 02/26/2026 | 02/27/2026 | Design AME SERVICES INC | Roofing hoist installation |
| B01057832 ↗ | 300 JAY STREET BROOKLYN | Alteration | Permit Issued | 06/11/2024 | 02/12/2026 | Relocation of existing DAIKIN ACCU unit. Extension of all vent pipes, new insulation on all refrigerant piping, cleaning & restoration of sm… | |
| B01026108 ↗ | 300 JAY STREET BROOKLYN | Alteration | Permit Issued | 04/23/2024 | 02/11/2026 | Design SUPERSTRUCTURES ENG. + ARCH. | NYCT Namm Hall facade repairs & complex plaza upgrade: Repair, Removal & Replacement of existing plaza roof membrane, railing, expansion joi… |
| B01276690 ↗ | 671 LINCOLN AVENUE BROOKLYN | Alteration | Permit Issued | 08/28/2025 | 11/05/2025 | Design AME SERVICES INC | Sidewalk Shed Installation |
| M08019635 ↗ | 150 EAST 80 STREET MANHATTAN | Alteration | Signed-off | 10/19/2022 | 09/05/2023 | Design LOTHROP ASSOCIATES | Replacement of Chapel roof including gutters and internal drains. Restoration of exterior masonry. Interior finish repairs required to repla… |
| M00857339 ↗ | 150 EAST 80 STREET MANHATTAN | Alteration | Permit Issued | 04/21/2023 | 04/21/2023 | INSTALLATION OF CONSTRUCTION FENCE, SIDEWALK SHED AND SCAFFOLDING ON TOP OF SIDEWALK SHED FOR THE PROPOSED ROOF REPLACEMENT AND FACADE RESTO… | |
| M00806790 ↗ | 150 EAST 80 STREET MANHATTAN | Alteration | Signed-off | 01/06/2023 | 04/14/2023 | Design LOTHROP ASSOCIATES | Work to include interior finish repairs to accommodate replaced drains. No change to use, egress, or occupancy. |
| M00821348 ↗ | 67 VESTRY STREET MANHATTAN | Alteration | Permit Issued | 02/12/2023 | 02/13/2023 | Design ASHRAF CORP Owner JM&A CONSTRUCTION CORP Filer RENNON CONSTRUCTION | Installation of supported scaffold |
| Q00570567 ↗ | 107-64 114 STREET QUEENS | Alteration | Permit Issued | 08/20/2021 | 01/31/2023 | LEGALIZE EXTENSION FOR LAUNDRY. NO CHANGE IN USE EGRESS OR OCCUPANCY | |
| M08001522 ↗ | 451 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/15/2022 | 11/11/2022 | Design THORNTON TOMASETTI Filer BLANCO DESIGN, INC. | Partial stabilization of the building and partial demolition of the structure. There is no change in egress, occupancy or use under this app… |
| M08016870 ↗ | 451 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 10/12/2022 | 10/12/2022 | Construct a construction fence along the perimeter of the sidewalk shed posts and the dot plastic barriers in the roadway as indicated by th… | |
| M08001125 ↗ | 451 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/16/2022 | 09/16/2022 | Design THORNTON TOMASETTI | Installation of temporary supported/system scaffold filed in conjunction DOB now # M00780372 with per plan submitted. Work shall comply with… |
| M00726244 ↗ | 220 WEST 27 STREET MANHATTAN | Alteration | Signed-off | 05/23/2022 | 06/23/2022 | Owner FIT Filer MUNICIPAL EXPEDITING INC | NAGLER BLDG.: FACADE AND ROOF REPAIRS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00472980 ↗ | 149 PIONEER STREET BROOKLYN | Alteration | Permit Issued | 04/01/2021 | 08/27/2021 | Design TRIMBLE ARCHITECTURE PC | New Curb Cut Installation as shown on plans filed herewith. No change in use, egress or occupancy. |
| 440659404BIS | 85-55 LITTLE NECK PARKWAY QUEENS | — | ISSUED | 01/13/2021 | 01/13/2021 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 671 LINCOLN AVENUE ↗ | 8 | 09/29/2026 |
| 31-35 31 STREET ↗ | 1 | 09/02/2026 |
| 159-04 HARLEM RIVER DRIVE ↗ | 1 | 08/22/2026 |
| 159-04 HARLEM RIVER DRIVE ↗ | 1 | 08/22/2026 |
| 159-04 HARLEM RIVER DRIVE ↗ | 1 | 08/22/2026 |
| 159-04 HARLEM RIVER DRIVE ↗ | 1 | 08/22/2026 |
| 378 SUMPTER STREET ↗ | 2 | 07/08/2026 |
| 23 MOTHER GASTON BLVD ↗ | 2 | 07/08/2026 |
| 150 EAST 80 STREET ↗ | 9 | 07/08/2026 |
| 451 CONVENT AVENUE ↗ | 7 | 07/08/2026 |
| 300 JAY STREET ↗ | 11 | 07/08/2026 |
| 760 ELDERT LANE ↗ | 1 | 04/09/2026 |
| 23 MOTHER GASTON BLVD ↗ | 1 | 04/09/2026 |
| 258 5 AVENUE ↗ | 3 | 04/09/2026 |
| 398 LENOX ROAD ↗ | 3 | 04/09/2026 |
| 149 PIONEER STREET ↗ | 3 | 03/21/2026 |
| 107-64 114 STREET ↗ | 3 | 03/21/2026 |
| 67 VESTRY STREET ↗ | 3 | 03/21/2026 |
| 220 WEST 27 STREET ↗ | 3 | 03/21/2026 |
| 159 WEST 143 STREET ↗ | 3 | 03/21/2026 |
| 151 WEST 143 STREET ↗ | 3 | 03/21/2026 |