| Owner | Filings | Most Recent |
|---|---|---|
| KINGS GROUP NY | 8 | 06/28/2026 |
| ZAPCO 1500 INVESTMENTS | 404 | 03/22/2026 |
| SIGNEXPO | 3 | 03/22/2026 |
| NEW ROC CONTRACTING | 1 | 03/22/2026 |
| EVEREST SCAFFOLDING INC | 1 | 03/22/2026 |
| ZAP CO 1500 INVESTMENT,LP | 1 | 03/22/2026 |
| ZAPO 1500 INVESTMENT | 1 | 03/22/2026 |
| ZAP CO 150 INVESTMENT | 1 | 03/22/2026 |
| KOLL THE REAL ESTATE S | 2 | 03/22/2026 |
| KOLL MANAGEMENT SERVIC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TOHFAZ UDDIN PE PC | 10 | 08/21/2026 |
| STARK CONSULTING, LLC | 3 | 08/03/2026 |
| BRANDON M. SOCHA, ARCHITECT | 1 | 08/03/2026 |
| CFS ENGINEERING, DPC | 3 | 07/17/2026 |
| JGARCHITECTS PLLC | 1 | 07/16/2026 |
| ASDA ARCHITECTURE + DESIGN | 2 | 06/01/2026 |
| TPG ARCHITECTURE, LLP | 10 | 05/13/2026 |
| LEON SKVIRSKY PE | 2 | 05/13/2026 |
| JACK GREEN ASSOCIATES | 44 | 05/12/2026 |
| AMA CONSULTING ENGINEERS, PC | 22 | 05/01/2026 |
| KAHN ARCHITECTURE & DESIGN PC | 2 | 05/01/2026 |
| GENSLER | 6 | 04/28/2026 |
| R SCOTT LEWIS PE PC | 18 | 04/23/2026 |
| GILSANZ MURRAY STEFICEK LLP | 2 | 04/21/2026 |
| CATAPANO ENGINEERING PC | 4 | 02/25/2026 |
| SCHERER DESIGN GROUP | 1 | 09/11/2025 |
| HOFFMANN ARCHITECTS, INC. | 2 | 07/14/2025 |
| GEORGE J. XERAKIAS, PE | 3 | 06/06/2025 |
| RIMKUS | 2 | 06/06/2025 |
| ROBERT PROFFITT | 3 | 01/08/2025 |
| SHALAT ARCHITECTS P.C. | 1 | 05/03/2024 |
| MCLAREN ENGINEERING GROUP | 2 | 12/28/2023 |
| NICHOLAS TSAPATSARIS | 5 | 12/12/2023 |
| MOHAMMAD AHEAD, PE | 1 | 09/07/2023 |
| EMTG CONSULTANTS INC | 1 | 07/24/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 94 | 03/21/2026 |
| RPO | 12 | 03/21/2026 |
| BUILDING BROTHERS | 4 | 03/21/2026 |
| HS DESIGN STUDIO | 6 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 2 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 4 | 03/21/2026 |
| CATAPANO ENG ARCH P C | 8 | 03/21/2026 |
| SME PROFESSIONAL DESIGN & CONSULTAN | 2 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ACCORD CONTR AND MGMT COR | General Contractor | 57 | 07/08/2026 |
| NORTH SHORE NEON SIGN | Scaffold | 18 | 07/08/2026 |
| R.J.C. MECHANICAL CORP | Plumbing | 13 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 13 | 07/08/2026 |
| CAULDWELL WINGATE CO LLC | General Contractor | 12 | 07/08/2026 |
| CONSOLIDATED SCAFFOLDING | General Contractor | 11 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 7 | 08/13/2026 |
| REPUBLIC SCAFFOLD&HOIST C | General Contractor | 6 | 03/21/2026 |
| GANNON CONTRACTING LLC | General Contractor | 4 | 07/08/2026 |
| WESBUILT CONSTRUCTION MAN | General Contractor | 4 | 08/06/2026 |
| NORTH SHORE NEON SIGN LLC | General Contractor | 4 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 4 | 07/08/2026 |
| RELATED SERVICES LLC | General Contractor | 4 | 03/21/2026 |
| SKEAHAN, MICHAEL | Electrical | 4 | 03/21/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 3 | 07/08/2026 |
| KINGS GROUP NY CORP | General Contractor | 3 | 06/28/2026 |
| BALATON CONSULTING LLC | Scaffold | 3 | 07/08/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 3 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 2 | 07/08/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 2 | 07/08/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 2 | 08/11/2026 |
| R.J.C. MECHANICAL CORP | Fire Protection | 2 | 07/28/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 2 | 07/08/2026 |
| BRENNAN OPERATING INC | General Contractor | 2 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CATALPA SPECIAL INSPECTIO | 2004 | 3 | 08/03/2026 |
| MEP INSPECTIONS, INC | 1102 | 2 | 08/03/2026 |
| AK ENGINEERING PC | 678 | 70 | 07/17/2026 |
| CODEGREEN | 510 | 6 | 05/01/2026 |
| CATAPANO ENGINEERING & AR | 3235 | 4 | 02/25/2026 |
| GEORGE J. XERAKIAS, PE | 1658 | 3 | 06/06/2025 |
| SOCOTEC ENGINEERING | 4983 | 1 | 12/28/2023 |
| RYAN SPECIAL ENGINEERING | 2018 | 4 | 10/05/2022 |
| GRANT ENGINEERING | 2627 | 5 | 06/02/2022 |
| GROUP-S LLC | 5216 | 1 | 05/27/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | TFP10, INC | 09/24/2026 |
| DOB NOW | Plumbing | Permit Issued | SHAW MECHANICAL INC | 08/27/2026 |
| DOB NOW | Plumbing | Permit Issued | ADVANCED PLUMBING MECH | 08/14/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 08/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | CAPITOL FIRE SPRINKLER CO | 08/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WESBUILT CONSTRUCTION MAN | 08/05/2026 |
| DOB NOW | General Construction | Permit Issued | WESBUILT CONSTRUCTION MAN | 08/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | R.J.C. MECHANICAL CORP | 07/27/2026 |
| DOB NOW | General Construction | Permit Issued | WESBUILT CONSTRUCTION MAN | 07/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WESBUILT CONSTRUCTION MAN | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 07/06/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | KINGS GROUP NY CORP | 06/22/2026 |
| DOB NOW | General Construction | Permit Issued | CAULDWELL WINGATE CO LLC | 06/18/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 06/09/2026 |
| DOB NOW | Sign | Signed-off | SERVICE SIGN ERECTORS CO | 06/03/2026 |
| DOB NOW | Sign | Signed-off | SERVICE SIGN ERECTORS CO | 06/02/2026 |
| DOB NOW | General Construction | Permit Issued | W.J. REGAN & COMPANY LLC | 05/20/2026 |
| DOB NOW | Structural | Permit Issued | NORTH SHORE NEON SIGN LLC | 05/18/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SPRING SCAFFOLDING LLC | 05/12/2026 |
| DOB NOW | Construction Fence | Permit Issued | SPRING SCAFFOLDING LLC | 05/12/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | SPRING SCAFFOLDING LLC | 05/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SPRING SCAFFOLDING LLC | 05/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | W.J. REGAN & COMPANY LLC | 05/06/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/24/2026 |
| DOB NOW | Structural | Permit Issued | NORTH SHORE NEON SIGN LLC | 04/24/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/24/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/24/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/24/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/24/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/24/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/23/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/23/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/23/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/23/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/23/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/23/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/22/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/22/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/22/2026 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 04/22/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/01/2026 | Permit Issued | W.J. REGAN & COMPANY LLC | Air Conditioning Systems | Cooling Mitsubishi Electric PUY-AK36NL 36,000 BTU · Split System ×1 |
| 10/05/2022 | Permit Issued | ACCORD CONTR AND MGMT COR | Air Conditioning Systems | Cooling __Junk__ TBD 61,100 BTU · Ahu ×6 |
| 06/06/2022 | Permit Issued | ACCORD CONTR AND MGMT COR | Associated Ducts and Piping | — |
| 06/30/2021 | Permit Issued | ACCORD CONTR AND MGMT COR | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Ventilation |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | TFP10, INC | — |
| 07/17/2026 | Permit Issued | CAPITOL FIRE SPRINKLER CO | Sprinkler System |
| 05/12/2026 | Permit Issued | R.J.C. MECHANICAL CORP | 15 heads |
| 04/07/2026 | Permit Issued | CAPITOL FIRE SPRINKLER CO | — |
| 11/03/2025 | Permit Issued | BEDROCK MECHANICAL INC | 10 heads |
| 10/30/2025 | Permit Issued | BEDROCK MECHANICAL INC | 47 heads |
| 05/02/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 8 heads |
| 10/24/2023 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 07/24/2023 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 22 heads |
| 10/07/2022 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 06/06/2022 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 06/06/2022 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 06/02/2022 | Signed-off | FULL CAPACITY FIRE CORP | 52 heads |
| 12/14/2020 | Signed-off | SIRINA FIRE PROT CORP | 35 heads |
| 04/07/2020 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | SHAW MECHANICAL INC | Water/Sanitary |
| 07/17/2026 | Permit Issued | ADVANCED PLUMBING MECH | Water/Sanitary |
| 11/03/2025 | Permit Issued | BEDROCK PLBG. & HTG., INC | Water/Sanitary |
| 11/03/2025 | — | — | — |
| 10/30/2025 | Permit Issued | BEDROCK PLBG. & HTG., INC | — |
| 10/30/2025 | Permit Issued | BEDROCK PLBG. & HTG., INC | Water/Sanitary |
| 12/13/2023 | Permit Issued | R.J.C. MECHANICAL CORP | Gas |
| 12/12/2023 | Permit Issued | R.J.C. MECHANICAL CORP | Gas, Water/Sanitary |
| 10/24/2023 | — | — | Water/Sanitary |
| 07/24/2023 | — | — | — |
| 10/07/2022 | Permit Issued | R.J.C. MECHANICAL CORP | Water/Sanitary |
| 10/05/2022 | Permit Issued | R.J.C. MECHANICAL CORP | Gas, Water/Sanitary |
| 06/03/2022 | Permit Issued | R.J.C. MECHANICAL CORP | Gas, Water/Sanitary |
| 06/02/2022 | Permit Issued | R.J.C. MECHANICAL CORP | Gas, Water/Sanitary |
| 01/22/2020 | Signed-off | R.J.C. MECHANICAL CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 04/21/2026 | Permit Issued | CITY ELEC'L SIGN ERECTORS | — |
| 03/06/2026 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 11/05/2025 | Permit Issued | PREMIER ELECTRIC, INC | General Wiring |
| 06/06/2025 | Complete | PREMIER ELECTRIC, INC | General Wiring |
| 04/17/2025 | Complete | JANON ELECTRIC CORP | General Wiring |
| 03/10/2025 | Permit Issued | HIGH QUALITY ELECTRIC OF | — |
| 10/24/2023 | Complete | PROFF ELECTRICAL LLC | — |
| 09/08/2023 | Permit Issued | PREMIER ELECTRIC, INC | General Wiring |
| 05/25/2023 | Complete | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 11/30/2022 | Complete | SOLAS ELECTRICAL CORP | — |
| 04/27/2022 | Complete | PREMIER ELECTRIC, INC | General Wiring |
| 01/27/2022 | Complete | CITY ELEC'L SIGN ERECTORS | — |
| 06/14/2021 | Complete | TUXEDO ELEC'L CONTR'G INC | — |
| 04/21/2021 | Complete | PREMIER ELECTRIC, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2026 | Permit Issued | NORTH SHORE NEON SIGN LLC | 1 scope_items |
| 04/21/2026 | Permit Issued | NORTH SHORE NEON SIGN LLC | 1 scope_items |
| 03/05/2026 | Permit Issued | NORTH SHORE NEON SIGN LLC | 2 scope_items |
| 02/17/2026 | Permit Issued | CAULDWELL WINGATE CO LLC | Steel |
| 07/09/2020 | — | — | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2026 | Permit Issued | SPRING SCAFFOLDING LLC | Fence, Sidewalk Shed |
| 06/17/2026 | Permit Issued | SPRING SCAFFOLDING LLC | Scaffold |
| 06/06/2025 | Signed-off | KINGS GROUP NY CORP | Sidewalk Shed |
| 11/18/2020 | Permit Issued | ACCORD CONTR AND MGMT COR | Fence |
| 11/18/2020 | Permit Issued | ACCORD CONTR AND MGMT COR | Fence |
| 11/12/2020 | Permit Issued | RELATED SERVICES LLC | Sidewalk Shed |
| 02/14/2020 | Permit Issued | REPUBLIC SCAFFOLD&HOIST C | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/06/2025 | Permit Issued | NEW ROC CONTRACTING CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/28/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/21/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 06/30/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 05/13/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 03/27/2026 | Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish | Certified | View ↗ |
| 03/24/2026 | Certified Sprinkler (PL)-Sprinkler-Hydro | Certified | View ↗ |
| 03/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/23/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 01/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/15/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 12/30/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/20/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/27/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/27/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/22/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/07/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/01/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/29/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/29/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 06/16/2026 | Fire-Resistance Rated Construction | ERIC BERLENT | progress |
| 06/16/2026 | Final | ERIC BERLENT | progress |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 06/16/2026 | Sprinkler Systems | Nicolas Crosetto | special |
| 05/29/2026 | Final | Alfonso DElia | progress |
| 05/15/2026 | Final | Ari Kamo | progress |
| 05/15/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 05/15/2026 | Post-installed Anchors | Ari Kamo | special |
| 05/13/2026 | Final | Ambrose Aliaga Kelly | progress |
| 04/28/2026 | Final | Ambrose Aliaga Kelly | progress |
| 04/21/2026 | Final | LEON SKVIRSKY | progress |
| 04/16/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 04/15/2026 | Final | Ari Kamo | progress |
| 04/15/2026 | Final | JAMES DOHERTY | progress |
| 04/15/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 04/15/2026 | Mechanical Systems | Ari Kamo | special |
| 04/13/2026 | Final | RENEE RAJAPPA | progress |
| 04/13/2026 | Final | RENEE RAJAPPA | progress |
| 04/13/2026 | Final | RENEE RAJAPPA | progress |
| 04/13/2026 | Final | RENEE RAJAPPA | progress |
| 04/13/2026 | Final | RENEE RAJAPPA | progress |
| 04/13/2026 | Final | RENEE RAJAPPA | progress |
| 04/13/2026 | Final | RENEE RAJAPPA | progress |
| 04/13/2026 | Final | RENEE RAJAPPA | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Ubiquant | Office | Floor 31 | Project M01415264 |
| SNA Displays | Office | Floor 20 | Project M01380758 |
| SCG America | Office | Floor 33 | Project M01201257 Project M01201293 |
| Good Morning America | Office | Floor 2 | Project M01044559 |
| Sitrick | Office | Floor 19 | Project M01037517 |
| Mariner Wealth | Office | Floor 28 | Project M00943818 Project M00943820 Project M00943822 |
| Tamashii Nations Store | Retail | — | Project M00915164 |
| Bandai Namco Tamashii Nations Store | Retail | Floor 1 | Project M00893882 |
| Bandainamco | Retail | Cellar, Floor 1 | Project M00892598 |
| Carlo's Bakery | Restaurant / Food Service | Floor 1 | Project M00879112 |
| Gordon Ramsay Fish & Chips | Restaurant / Food Service | Floor 1 | Project M00700557 Project M00700589 Project M00700543 |
| Jollibee | Restaurant / Food Service | Cellar, Floor 1 | Project M00577946 Project M00428925 |
| Honeybee Food Corps | Restaurant / Food Service | Cellar, Floor 1 | Project M00428817 Project M00471469 |
| Ice Miller Bds | Office | Floor 18 | Project M00275561 Project M00275565 Project M00275567 |