Prison, jail, house of detention
1500 HAZEN STREET
BRONX · BIN 2116652
💬 Discuss this project
1933Year Built
6Stories
Y3Building Class
C8-2Zoning
5,519,372 sfGross Floor Area
1Units
LL97 Covered11 Active Violations 0 unresolved · 11 paperwork only 1 old, status unconfirmed ▸FISP: No Report Filed
Prison, jail, house of detention · Owner of record: NYC Department of Corrections · 17,825,000 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNYC Department of CorrectionUnder Construction123p · 2 filings · 20 docs
Floor 6NYC Department of Correction1 filing · 4 docs
Floor 5
Floor 4
Floor 3
Floor 2New York Department of Correction1 filing · 3 docs
Floor 1NYC Department of Correction, New York Department of CorrectUnder Construction141p · 4 filings · 20 docs
CellarNYC Department of Correction, New York Department of Correct64p · 4 filings · 20 docs
Filed — no permit issuedNew York Department of Correction15p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Correction4709/16/2026
Rutherford103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Urbahn Architects406/23/2026
Consulting Engineers Collaborative208/17/2022
Lakhani & Jordan408/16/2022
Iaq Systems408/13/2021
Jeffrey Bravstein108/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tarek M. Zeid, P.E503/21/2026
Archetype Consultants1803/21/2026
Tarek M Zeid P E503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Padilla Construction ServicesGeneral Contractor809/16/2026
Infinity Contracting ServiceGeneral Contractor403/21/2026
FirequestFire Protection307/08/2026
Tru-Val ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons1061006/23/2026
Building Lifecycle
All (66)Filed (15)Permit Issued (12)Facade (FISP) (3)Violation (3)Inspection (3)Special Inspection (30)
09/15/2026
Permit issued — General Construction
X00764819-I1-GC
06/23/2026
Filed — Alteration
General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764819-P4
05/04/2026
Permit issued — General Construction
X00764819-I1-GC
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Lighting controls
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
10/16/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
10/16/2025
Special inspection requirement — Lighting controls
GEORGE GHEBRYAL
10/16/2025
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/15/2025
Filed — Alteration
General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764819-P1
03/29/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2024
Permit issued — Plumbing
X00764829-S3-EW-SP
03/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/06/2024
Permit issued — Sprinklers
X00764819-S3-EW-SP
10/17/2023
Permit issued — Structural
X00764829-S1-ST
04/28/2023
Permit issued — Mechanical Systems
X00764819-S2-MS
04/28/2023
Permit issued — Mechanical Systems
X00764829-S2-MS
04/26/2023
Permit issued — General Construction
X00764819-I1-GC
03/06/2023
Permit issued — Sprinklers
X00764829-S3-EW-SP
11/09/2022
Permit issued — General Construction
X00764829-I1-GC
11/08/2022
Permit issued — Structural
X00764819-S1-ST
11/08/2022
Permit issued — Structural
X00764829-S1-ST
08/17/2022
Filed — Alteration
Structural alterations at the 1st floor & roof level for proposed locker room upgrades; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764829-S1
08/17/2022
Filed — Alteration
General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764819-S1
08/16/2022
Filed — Alteration
Structural alterations at the 1st floor & roof level for proposed locker room upgrades; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764829-S3
08/16/2022
Filed — Alteration
General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764819-S3
08/16/2022
Special inspection requirement — Structural Cold-Formed Steel
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Cold-Formed Steel
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/11/2022
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
08/04/2022
Filed — Alteration
General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764819-S2
08/04/2022
Filed — Alteration
Structural alterations at the 1st floor & roof level for proposed locker room upgrades; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764829-S2
08/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
06/30/2022
Filed — Alteration
Structural alterations at the 1st floor & roof level for proposed locker room upgrades; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764829-I1
06/30/2022
Filed — Alteration
General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764819-I1
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/13/2021
Filed — Alteration
Catwalks for Surge Tanks are supported from floor/ground independent of any building and equipment support structure.
Q00572254-I1
08/13/2021
Filed — Alteration
Q00507299-I1
06/16/2021
Filed — Alteration
Rikers Island Steam Tunnel Rehabilitation work. All as per plans filed herewith.
Q00500406-I1
05/27/2021
Filed — Alteration
NICC- REPAIR AND UPGRADE OF METHANE MITIGATION AND DETECTION SYSTEM. ALL AS PER PLANS FILED HEREWITH.
Q00485333-I1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPadilla Construction Services09/15/2026
DOB NOWGeneral ConstructionPermit IssuedPadilla Construction Services05/04/2026
DOB NOWSprinklersSigned-offFirequest03/26/2024
DOB NOWSprinklersPermit IssuedFirequest02/06/2024
DOB NOWStructuralPermit IssuedPadilla Construction Services10/17/2023
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service04/28/2023
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service04/28/2023
DOB NOWGeneral ConstructionPermit IssuedPadilla Construction Services04/26/2023
DOB NOWSprinklersSigned-offFirequest03/06/2023
DOB NOWGeneral ConstructionPermit IssuedPadilla Construction Services11/09/2022
DOB NOWStructuralPermit IssuedPadilla Construction Services11/08/2022
DOB NOWStructuralPermit IssuedPadilla Construction Services11/08/2022
BISFSISSUEDJack Piccini06/06/2022
BISMHISSUEDSea Breeze General Construction10/20/2021
BISOTISSUEDSea Breeze General Construction10/20/2021
BISPLISSUEDEagle 1 Mechanical11/04/2020
BISOTISSUEDSea Breeze General Construction07/31/2020
BISOTISSUEDDynamic Energy Group06/18/2018
BISFSISSUEDDynamic Energy Group06/15/2018
BISOTISSUEDDynamic Energy Group06/15/2018
BISPLISSUEDDynamic Contracting08/31/2016
BISPLISSUEDDynamic Contracting08/31/2016
BISSPISSUEDGrinnell01/25/2016
BISOTISSUEDLanmark Group10/21/2015
BISOTISSUEDDynamic Energy Group09/15/2015
BISOTISSUEDDynamic Energy Group09/15/2015
BISOTISSUEDDynamic Energy Group09/14/2015
BISPLISSUEDDynamic Contracting06/11/2015
BISPLISSUEDDynamic Contracting06/11/2015
BISSPISSUEDGrinnell01/29/2015
BISOTISSUEDLanmark Group11/21/2014
BISMHISSUEDDynamic Energy Group10/01/2014
BISOTISSUEDDynamic Energy Group09/30/2014
BISOTISSUEDDynamic Energy Group09/30/2014
BISOTISSUEDDynamic Energy Group09/30/2014
BISFSISSUEDDynamic Energy Group09/29/2014
BISOTISSUEDLanmark Group09/26/2014
BISSDISSUEDGrinnell08/27/2014
BISPLISSUEDDynamic Contracting06/13/2014
BISPLISSUEDDynamic Contracting06/13/2014
+ 7 more permits on file
3 projects · most recent 06/23/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2026Permit IssuedPadilla Construction ServiceAir Conditioning Systems
Cooling
Aaon RN-015-3-0-E60E-12A 160,000 BTU · Rooftop Unit ×2
08/17/2022Permit IssuedPadilla Construction ServiceAir Conditioning Systems
Cooling
Aaon RQ-004-3-H-K60E-12A 68,000 BTU · Rooftop Unit ×1
RQ-006-3-H-K60E-13A 71,500 BTU · Rooftop Unit ×1
RQ-006-8-0-E60E-11A 61,000 BTU · Rooftop Unit ×1
RQ-006-8-H-EB09-14A 71,500 BTU · Rooftop Unit ×1
06/16/2021——Ventilation Systems
Ventilation
Greenheck AER-E30C-620-C-VGD10 7,200 CFM · Exhaust Fan ×16
SE-2-48-415-C30 14,000 CFM · Exhaust Fan ×16
SE-2-36-614-B30-VGD 14,000 CFM · Exhaust Fan ×3
SE-2-30-620-B20-VGD 8,000 CFM · Exhaust Fan ×2
2 projects · most recent 06/23/2026
Sprinkler System
FiledStatusContractorScope
06/23/2026Permit IssuedFirequestSprinkler System
11/22/2019——376 heads, 1 outlets
1 project · most recent 06/23/2026
Water/Sanitary
FiledStatusContractorScope
06/23/2026——Water/Sanitary
5 projects · most recent 12/02/2021
General Wiring
FiledStatusContractorScope
12/02/2021Permit IssuedTru-Val Electric—
12/02/2021Permit IssuedTru-Val Electric—
01/15/2021CompleteKleinberg ElectricGeneral Wiring
03/12/2019CompleteP & M Elect'l ContractingGeneral Wiring
02/13/2018CompleteP & M Elect'l ContractingGeneral Wiring
2 projects · most recent 08/17/2022
Steel Concrete Masonry
FiledStatusContractorScope
08/17/2022Signed-offFirequestSteel, Concrete
08/13/2021——Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
05/01/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
05/01/2026Interior lighting powerGEORGE GHEBRYALenergy_progress
05/01/2026Lighting controlsGEORGE GHEBRYALenergy_progress
05/01/2026FinalGEORGE GHEBRYALprogress
05/01/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
10/16/2025FinalGEORGE GHEBRYALprogress
10/16/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
10/16/2025Lighting controlsGEORGE GHEBRYALenergy_progress
10/16/2025Interior lighting powerGEORGE GHEBRYALenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/16/2022Structural Cold-Formed SteelGEORGE GHEBRYALspecial
08/16/2022Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
08/16/2022Structural Steel - DetailsGEORGE GHEBRYALspecial
08/16/2022Structural Steel - WeldingGEORGE GHEBRYALspecial
08/16/2022Subgrade InspectionsGEORGE GHEBRYALspecial
08/16/2022Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
08/16/2022Structural Cold-Formed SteelGEORGE GHEBRYALspecial
08/16/2022Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
08/16/2022Structural Steel - DetailsGEORGE GHEBRYALspecial
08/16/2022Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
08/16/2022Structural Steel - WeldingGEORGE GHEBRYALspecial
08/16/2022Subgrade InspectionsGEORGE GHEBRYALspecial
08/16/2022Post-installed AnchorsGEORGE GHEBRYALspecial
08/16/2022Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/16/2022Post-installed AnchorsGEORGE GHEBRYALspecial
Latest 25 of 49.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYC Department of CorrectionGovernment / CivicCellar, Floors 1, 6, Roof
Project X00764819 Alteration · QA Failed · 06/30/2022
Project X00764829 Alteration · Permit Issued · 06/30/2022
Project Q00485333 Alteration · Approved · 05/27/2021
New York Department of CorrectionGovernment / CivicCellar, Floors 1, 2
Project Q00507299 Alteration · Approved · 08/13/2021
Project Q00572254 Alteration · Approved · 08/13/2021
Project Q00500406 Alteration · Approved · 06/16/2021
Project Q00270686 Alteration · Approved · 11/22/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 389 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch19
08/27/2026Q00485333-I1Request digital key ↗
08/27/2026Q00500406-I1Request digital key ↗
08/27/2026Q00507299-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Standpipe1
08/28/2026Q00270686-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00270686-I1Request digital key ↗
▸Applications & Permits61
▸BISWORK PERMIT APPLICATION40
06/09/2022220384643Open ↗
10/20/2021220709419Open ↗
10/20/2021220709419Open ↗
Showing 3 of 40 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
12/27/2021220709419Open ↗
10/29/2021220709419Open ↗
05/18/2021220709428Open ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications125
▸DOB NOWProgress Inspector Seal & Signature42
08/27/2026X00764829-S1Open ↗
08/26/2026X00764819-P3Open ↗
08/26/2026X00764819-P3Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
08/29/2026X00764829-S3Open ↗
08/27/2026X00764829-S1Open ↗
08/27/2026X00764829-S1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/28/2026Q00270686-I1Open ↗
08/27/2026Q00500406-I1Open ↗
08/27/2026Q00507299-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
11/10/2021220384643Open ↗
03/25/2020421667235Open ↗
07/02/2019220709428Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
03/25/2020421667235Open ↗
07/02/2019220709428Open ↗
07/02/2019220709428Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/02/2019220709428Open ↗
07/02/2019220709419Open ↗
08/20/2013220330906Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/20/2013220330906Open ↗
▸Trade Schedules & Equipment27
▸BISSELF-CERT PLUMBING NOTICE8
10/21/2015220384643Open ↗
07/27/2015220386703Open ↗
02/02/2015220222667Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
07/02/2019220709428Open ↗
06/28/2019220709419Open ↗
11/21/2016220384643Open ↗
Showing 3 of 7 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
07/27/2015220386703Open ↗
12/05/2014220386703Open ↗
02/11/2013220222667Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
12/03/2014220222667Open ↗
12/03/2014220386703Open ↗
▸BISSTANDPIPE INSP REPORT : FP-842
07/27/2015220386703Open ↗
12/05/2014220386703Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/25/2014220384643Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
04/05/2023220384643Open ↗
▸BISPLUMBING (PL) SIGNOFF1
03/14/2022220709419Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/05/2023220384643Open ↗
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
03/25/2020421667235Open ↗
06/25/2014220386703Open ↗
08/20/2013220330906Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/24/2026X00764819-I1Open ↗
08/24/2026X00764819-S1Open ↗
08/24/2026X00764819-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00507299-I1Open ↗
08/27/2026Q00572254-I1Open ↗
08/13/2026Q00485333-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/25/2020421667235Open ↗
07/02/2019220709428Open ↗
07/02/2019220709428Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
03/18/2022220709419Open ↗
03/18/2022220709419Open ↗
03/14/2022220709419Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/18/2022220709419Open ↗
03/14/2022220709419Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/01/2021220384643Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/27/2020220709419Open ↗
▸BISELECTRIC MOTORS1
10/01/2021220384643Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/18/2022220709419Open ↗
03/18/2022220709419Open ↗
03/14/2022220709419Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/10/2014220384643Open ↗
06/10/2014220384643Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/03/2021220384643Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/27/2020220709419Open ↗
▸BISPOST-INSTALLED ANCHORS1
07/27/2020220709419Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/10/2014220384643Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
10/01/2021220384643Open ↗
▸BISMECHANICAL SYSTEMS1
10/01/2021220384643Open ↗
▸BISMASONRY1
07/27/2020220709419Open ↗
▸Approvals, Objections & Sign-offs57
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/28/2026Q00270686-I1Open ↗
08/27/2026Q00507299-I1Open ↗
08/24/2026X00764819-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
08/28/2026Q00270686-I1Open ↗
08/24/2026X00764819-P4Open ↗
08/13/2026X00764829-S3Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
06/09/2022220384643Open ↗
03/25/2020421667235Open ↗
07/18/2019220709428Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/05/2023220384643Open ↗
04/05/2023220384643Open ↗
03/21/2022220709419Open ↗
Showing 3 of 5 on file for this type
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
03/14/2022220709419Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026Q00572254-I1Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
03/18/2022220709419Open ↗
03/14/2022220709419Open ↗
03/25/2020421667235Open ↗
Showing 3 of 16 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/01/2021220384643Open ↗
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET13
03/25/2020421667235Open ↗
07/02/2019220709428Open ↗
07/02/2019220709428Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION5
12/27/2021220709419Open ↗
09/16/2021220384643Open ↗
02/26/2020220384643Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸BISSD/SP FIRE PUMP TEST : FP-861
12/03/2014220386703Open ↗