← Back
Over six families without stores
Sterling Place Rehabs
1506 STERLING PLACE · BIN 3036861
💬 Discuss this project
1922Year Built
4Stories
C1Building Class
R6Zoning
24,416 sfGross Floor Area
32Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 9,490 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 11 docs
Floor 4Under Construction43p · 2 filings · 20 docs
Floor 3Under Construction43p · 2 filings · 20 docs
Floor 2Under Construction43p · 2 filings · 20 docs
Floor 1Under Construction50p · 2 filings · 20 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY607/08/2026
NYC PACT PRESERVATION PARTNERS303/22/2026
NYC HOUSING AUTHORITY203/22/2026
NYCHA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLM ARCHITECTURE, P.C.302/13/2025
DAGHER ENGINEERING PLLC209/24/2024
ASHRAF CORP304/30/2024
SOCOTEC, INC.204/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD DESIGNS103/21/2026
DANICO SERVICES1003/21/2026
METROPOLIS GROUP INC1003/21/2026
RYBAK DEVELOPMENT203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
BK CONSTRUCTIONDBA SRT CONSTRUCTION103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor607/08/2026
BK CONSTRUCTION SVCS INCGeneral Contractor407/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor207/08/2026
RYBURN PHILLIPSElectrical103/21/2026
A & E PLUMBING CORPPlumbing107/08/2026
ZENA ELECTRIC INCElectrical103/22/2026
ANJUM SAEEDGeneral Contractor103/21/2026
PREMIER CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803702/13/2025
Building Lifecycle
All (128)Filed (14)Permit Issued (14)Signed Off (5)Violation (59)Inspection (4)Objection (2)Special Inspection (30)
06/17/2026
Violation issued (HPD, open)
C
05/12/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931318-I1
04/08/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923956-I1
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00948277-I1
03/18/2026
Permit issued — General Construction
B00919099-I1-GC
03/01/2026
Violation issued (HPD, open)
B
03/01/2026
Violation issued (HPD, open)
B
02/01/2026
Signed off — Alteration
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01018882-I1
01/27/2026
Violation issued (HPD, open)
C
01/27/2026
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2025
Signed off — Alteration
INSTALLATION OF 195' NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01038478-I1
07/10/2025
Violation issued (HPD, closed)
A
07/10/2025
Violation issued (HPD, open)
C
07/10/2025
Violation issued (HPD, closed)
C
07/10/2025
Violation issued (HPD, closed)
B
07/10/2025
Violation issued (HPD, closed)
C
07/10/2025
Violation issued (HPD, closed)
B
05/05/2025
Permit issued — Sidewalk Shed
B01038478-I1-SH
05/01/2025
Violation issued (HPD, closed)
C
05/01/2025
Violation issued (HPD, closed)
B
04/28/2025
Permit issued — General Construction
B00919099-I1-GC
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
02/13/2025
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00919099-P2
12/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/01/2024
Permit issued — Plumbing
B00948277-I1-PL
09/30/2024
Permit issued — Mechanical Systems
B00923956-I1-MS
09/24/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00948277-I1
09/24/2024
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00919099-P1
09/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
09/23/2024
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
09/18/2024
Filed — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923956-I1
09/17/2024
Objection resolved — Addressed
09/16/2024
Objection raised — Other
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC03/18/2026
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC05/05/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC04/28/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP10/01/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL09/30/2024
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC08/29/2024
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC05/10/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL05/09/2024
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC05/01/2024
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC04/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offPREMIER CONSTRUCTION INC04/29/2024
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC04/29/2024
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC04/10/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC11/20/2023
BISBLISSUEDP.H. WORKS INC06/06/2019
BISPLISSUEDP.H. WORKS INC06/05/2019
BISBLISSUEDP.H. WORKS INC12/11/2018
BISPLISSUEDP.H. WORKS INC12/11/2018
5 projects · most recent 09/09/2025
General Wiring Boiler Controls
FiledStatusContractorScope
09/09/2025Permit IssuedALBA ELECTRIC CORPGeneral Wiring
04/25/2024CompleteHIGH QUALITY ELECTRIC OF—
04/22/2024Permit IssuedZENA ELECTRIC INC—
04/22/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
02/27/2018CompleteA TECH ELEC ENTERPRISESGeneral Wiring
1 project · most recent 04/30/2024
Sidewalk Shed
FiledStatusContractorScope
04/30/2024Permit IssuedARSENAL SCAFFOLD INCSidewalk Shed
2 projects · most recent 09/10/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
09/10/2024——Suspended Scaffold (SC)
08/26/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
02/19/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/19/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/19/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/19/2025FinalSAMI HAJJAR P.Eprogress
02/19/2025Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
02/19/2025Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
02/19/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
02/19/2025VestibulesSAMI HAJJAR P.Eenergy_progress
02/19/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
02/19/2025Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
02/19/2025Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
02/19/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
02/19/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
09/23/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/23/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
09/23/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/23/2024FinalSAMI HAJJAR P.Eprogress
09/23/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
09/23/2024Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
09/23/2024VestibulesSAMI HAJJAR P.Eenergy_progress
09/23/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
09/23/2024Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
09/23/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
09/23/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
09/23/2024Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
Latest 25 of 36.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/25/2026B00931318-P1Request digital key ↗
08/25/2026B00931318-I1Request digital key ↗
08/25/2026B01038478-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
06/10/2019340647054Open ↗
06/10/2019340647054Open ↗
11/19/2018340647054Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
07/05/2019340647054Open ↗
06/28/2019340647054Open ↗
11/19/2018340647054Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026B00931318-I1Open ↗
08/25/2026B01042681-I1Open ↗
08/24/2026B00919099-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/07/2026B00919099-P1Open ↗
09/07/2026B00919099-P1Open ↗
08/26/2026B00931318-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/07/2026B00919099-P1Open ↗
08/26/2026B00931318-P1Open ↗
08/24/2026B00931318-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/19/2018340647054Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/19/2018340647054Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/19/2018340647054Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/31/2019340647054Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING1
11/19/2018340647054Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/19/2018340647054Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/05/2019340647054Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
11/19/2018340647054Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026B00919099-I1Open ↗
08/24/2026B00919099-P1Open ↗
08/24/2026B00919099-P2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/19/2018340647054Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00931318-I1Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS1
07/31/2019340647054Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/19/2018340647054Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/31/2019340647054Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/19/2018340647054Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/25/2026B00931318-I1Open ↗
08/13/2026B01042681-I1Open ↗
08/13/2026B00919099-P3Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/31/2019340647054Open ↗
07/31/2019340647054Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/31/2019340647054Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
07/31/2019340647054Open ↗
11/19/2018340647054Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
12/10/2018340647054Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
06/04/2019340647054Open ↗
▸BISBOROUGH INTAKE FORM1
07/31/2019340647054Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/19/2018340647054Open ↗
▸Other Documents8
▸DOB NOWManufacturer's Specifications4
08/24/2026B01018985-I1Open ↗
08/13/2026B01018985-P1Open ↗
08/13/2026B01018985-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/24/2026B01018985-I1Open ↗
08/13/2026B01108523-I1Open ↗
08/13/2026B01018985-P2Open ↗
Showing 3 of 4 on file for this type