← Back
Over six families without stores
Sterling Place Rehabs
1511 STERLING PLACE · BIN 3036569
💬 Discuss this project
1921Year Built
4Stories
C1Building Class
R6Zoning
15,160 sfGross Floor Area
20Units
Rent Stabilized14 Open Violations 12 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 5,400 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 2 filings · 17 docs
Floor 428p · 2 filings · 10 docs
Floor 328p · 2 filings · 10 docs
Floor 228p · 2 filings · 10 docs
Floor 130p · 2 filings · 10 docs
Cellar29p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY404/09/2026
NYCHA503/22/2026
NYC PACT PRESERVATION PARTNERS303/22/2026
PREMIER CONSTRUCTION103/22/2026
N.Y.C. HOUSING AUTHORITY303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP504/03/2025
DAGHER ENGINEERING PLLC209/24/2024
SLM ARCHITECTURE, P.C.109/10/2024
SOCOTEC, INC.204/25/2024
AK CONSULTING SERVICES, INC105/04/2023
BITOPI CONSULTANTS LLC103/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RYBAK DEVELOPMENT203/21/2026
BK CONSTRUCTIONDBA SRT CONSTRUCTION103/21/2026
DANICO SERVICES1003/21/2026
METROPOLIS GROUP INC603/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
AK CONSULTING SERVICES403/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor603/21/2026
FSC D&C LLCGeneral Contractor307/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor307/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor204/09/2026
BK CONSTRUCTION SVCS INCGeneral Contractor107/08/2026
A & E PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803509/24/2024
Building Lifecycle
All (105)Filed (14)Permit Issued (14)Signed Off (7)Violation (59)Inspection (3)Special Inspection (8)
05/13/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931321-I1
04/08/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00979917-I1
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00978994-I1
03/18/2026
Permit issued — General Construction
B00919102-I1-GC
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2025
Signed off — Alteration
B00961485-I1
09/12/2025
Signed off — Alteration
B01038761-I1
07/31/2025
Permit issued — General Construction
B00919102-I1-GC
06/25/2025
Permit issued — General Construction
B00931321-I1-GC
05/29/2025
Violation issued (HPD, closed)
C
04/03/2025
Filed — Alteration
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01018900-P2
03/26/2025
Filed — Alteration
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01018900-P1
02/03/2025
Violation issued (HPD, closed)
A
02/03/2025
Violation issued (HPD, closed)
B
02/03/2025
Violation issued (HPD, closed)
B
02/03/2025
Violation issued (HPD, closed)
B
02/03/2025
Violation issued (HPD, closed)
B
01/25/2025
Violation issued (HPD, closed)
B
01/25/2025
Violation issued (HPD, closed)
C
01/25/2025
Violation issued (HPD, closed)
B
01/25/2025
Violation issued (HPD, closed)
A
01/25/2025
Violation issued (HPD, closed)
B
01/15/2025
Violation issued (HPD, open)
B
01/15/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, closed)
B
01/15/2025
Violation issued (HPD, closed)
B
01/15/2025
Violation issued (HPD, closed)
A
12/10/2024
Violation issued (HPD, open)
C
12/10/2024
Violation issued (HPD, open)
A
12/10/2024
Violation issued (HPD, closed)
C
12/10/2024
Violation issued (HPD, open)
A
12/10/2024
Violation issued (HPD, open)
C
12/10/2024
Violation issued (HPD, open)
A
12/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/20/2024
Permit issued — Sidewalk Shed
B00961485-I1-SH
11/12/2024
Violation issued (ECB, closed)
Cranes and Derricks
10/15/2024
Permit issued — Suspended Scaffold
B01018981-P1-SC
10/07/2024
Filed — Alteration
POST APPROVAL AMENDMENT FILED TO ADD OUTRIGGER BEAMS. SUSPENDED SCAFFOLDING ARE INSTALLED IN ORDER TO PERFORM EXTERIOR REPAIRS. FACADE INSPECTIONS ARE TO BE PERFORMED. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
B01018981-P1
10/01/2024
Permit issued — Plumbing
B00978994-I1-PL
09/30/2024
Permit issued — Mechanical Systems
B00979917-I1-MS
09/24/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00978994-I1
09/18/2024
Permit issued — General Construction
B00919102-I1-GC
09/12/2024
Filed — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00979917-I1
09/10/2024
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00919102-I1
08/23/2024
Violation issued (HPD, closed)
C
08/23/2024
Violation issued (HPD, open)
B
08/08/2024
Violation issued (HPD, open)
B
08/08/2024
Violation issued (HPD, open)
A
08/08/2024
Violation issued (HPD, open)
B
06/17/2024
Permit issued — General Construction
B00931321-I1-GC
05/09/2024
Permit issued — Sidewalk Shed
B01038761-I1-SH
05/08/2024
Filed — Alteration
B01038761-I1
04/29/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
04/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
04/29/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
04/28/2024
Filed — Alteration
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01018900-I1
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/18/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC07/31/2025
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL06/25/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/20/2024
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC10/15/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP10/01/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL09/30/2024
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC09/18/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL06/17/2024
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC05/09/2024
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC04/10/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/22/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/05/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC03/24/2023
7 projects · most recent 04/30/2026
General Wiring
FiledStatusContractorScope
04/30/2026Permit IssuedHYLAN DATACOM & ELECL LLC—
04/29/2026CompleteHYLAN DATACOM & ELECL LLC—
09/09/2025Permit IssuedALBA ELECTRIC CORPGeneral Wiring
04/25/2024CompleteHIGH QUALITY ELECTRIC OF—
04/22/2024Permit IssuedZENA ELECTRIC INC—
12/04/2023Permit IssuedNASH ELECTRIC SERVICES IN—
02/26/2018CompleteA TECH ELEC ENTERPRISESGeneral Wiring
1 project · most recent 10/07/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
10/07/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/29/2024MasonrySAMI HAJJAR P.Especial
04/29/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/29/2024FinalSAMI HAJJAR P.Eprogress
04/19/2024Tenant Protection Plan Compliance—special
04/19/2024MasonrySAMI HAJJAR P.Especial
04/19/2024FinalSAMI HAJJAR P.Eprogress
12/18/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/18/2023HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026B00840471-I1Request digital key ↗
08/27/2026B00868143-I1Request digital key ↗
08/26/2026B00961485-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B00868143-I1Open ↗
08/26/2026B00961485-I1Open ↗
08/25/2026B00931321-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B00931321-I1Open ↗
08/28/2026B00931321-I1Open ↗
08/26/2026B00978994-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B00931321-I1Open ↗
08/26/2026B00978994-I1Open ↗
08/24/2026B00931321-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00978994-I1Open ↗
08/13/2026B00979917-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026B00931321-I1Open ↗
08/13/2026B00919102-I1Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/13/2026B00931321-P1Open ↗
08/13/2026B00868143-I1Open ↗
08/13/2026B01018900-P1Open ↗
Showing 3 of 11 on file for this type
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026B01018981-I1Open ↗
08/13/2026B01018981-P1Open ↗
▸DOB NOWCalculations2
08/13/2026B01018981-P1Open ↗
08/13/2026B01018981-I1Open ↗