← Back
BuildNYC
Over six families without stores
Sterling Place Rehabs
1511 STERLING PLACE · BIN 3036569
💬 Discuss this project
1921Year Built
4Stories
C1Building Class
R6Zoning
15,160 sfGross Floor Area
20Units
Rent Stabilized12 Active Violations 10 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC Pact Preservation Partners · 5,400 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofApartment kitchen, bathroom, door, and window replacement3p · 3 filings · 20 docs
Floor 4Apartment kitchen, bathroom, door, and window replacement34p · 3 filings · 19 docs
Floor 3Apartment kitchen, bathroom, door, and window replacement34p · 3 filings · 19 docs
Floor 2Apartment kitchen, bathroom, door, and window replacement34p · 3 filings · 19 docs
Floor 1Apartment kitchen, bathroom, door, and window replacement36p · 3 filings · 19 docs
CellarApartment kitchen, bathroom, door, and window replacement30p · 2 filings · 15 docs
Site & exteriorNYCHA Reid Park Rock Sterling Place St Johns Cluster facade 26p · 5 filings · 20 docs
Filed — no permit issuedInstall debris chute for facade repair10p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority904/09/2026
NYC Pact Preservation Partners410/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLM Architecture209/16/2026
Ashraf504/03/2025
Dagher Engineering209/24/2024
Socotec204/25/2024
AK Consulting Services105/04/2023
Bitopi Consultants103/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rybak Development203/21/2026
BK Constructiondba SRT Construction103/21/2026
Danico Services1003/21/2026
Metropolis Group603/21/2026
Socotec103/21/2026
AK Consulting Services403/21/2026
KD Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold603/21/2026
FSC D&CGeneral Contractor307/08/2026
Arsenal ScaffoldScaffold204/09/2026
BK Construction ServicesScaffold107/08/2026
A & E PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting1803609/16/2026
Building Lifecycle
11/11/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/28/2026
Signed off — Alteration
POST APPROVAL AMENDMENT FILED TO ADD OUTRIGGER BEAMS. SUSPENDED SCAFFOLDING ARE INSTALLED IN ORDER TO PERFORM EXTERIOR REPAIRS. FACADE INSPECTIONS ARE TO BE PERFORMED. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
B01018981-I1
10/27/2026
Permit renewed — Suspended Scaffold
Renewed without changes
B01018981-I1-SC
10/19/2026
Closed: Failure to file 2024 external low pressure inspection
DOB violation · closed on the city's record
09/25/2026
Signed off — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00919102-I1
134 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offPremier Construction10/27/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C03/18/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C07/31/2025
DOB NOWGeneral ConstructionSigned-offPyramid Etc Companies06/25/2025
DOB NOWSidewalk ShedSigned-offArsenal Scaffold11/20/2024
DOB NOWSuspended ScaffoldPermit IssuedPremier Construction10/15/2024
DOB NOWPlumbingSigned-offA & E Plumbing10/01/2024
DOB NOWMechanical SystemsSigned-offPyramid Etc Companies09/30/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C09/18/2024
DOB NOWGeneral ConstructionSigned-offPyramid Etc Companies06/17/2024
DOB NOWSidewalk ShedSigned-offBK Construction Services05/09/2024
DOB NOWSuspended ScaffoldSigned-offPremier Construction04/10/2024
DOB NOWSidewalk ShedSigned-offArsenal Scaffold11/22/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding05/05/2023
DOB NOWSidewalk ShedSigned-offRoma Scaffolding03/24/2023
7 projects · most recent 04/30/2026
General Wiring
FiledStatusContractorScope
04/30/2026Permit IssuedHylan Datacom & Electrical—
04/29/2026CompleteHylan Datacom & Electrical—
09/09/2025Permit IssuedAlba ElectricGeneral Wiring
04/25/2024CompleteHigh Quality Electric—
04/22/2024Permit IssuedZena Electric—
12/04/2023Permit IssuedNash Electric Services—
02/26/2018CompleteA Tech Electric EnterprisesGeneral Wiring
1 project · most recent 10/07/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
10/07/2024Signed-offPremier ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/16/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
09/16/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/16/2026FinalSAMI HAJJAR P.Eprogress
09/16/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
09/16/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
09/16/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
09/16/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
09/16/2026Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
09/16/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
09/16/2026VestibulesSAMI HAJJAR P.Eenergy_progress
09/16/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
04/29/2024MasonrySAMI HAJJAR P.Especial
04/29/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/29/2024FinalSAMI HAJJAR P.Eprogress
04/19/2024Tenant Protection Plan Compliance—special
04/19/2024MasonrySAMI HAJJAR P.Especial
04/19/2024FinalSAMI HAJJAR P.Eprogress
12/18/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/18/2023HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
57 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account