← Back
Over six families without stores
Sterling Place Rehabs
1568 STERLING PLACE · Crown Heights (North) · BIN 3036888
💬 Discuss this project
1922Year Built
4Stories
C1Building Class
R6Zoning
24,700 sfGross Floor Area
31Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 7,816 sf lot · 3.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 3 filings · 20 docs
Floor 42p · 2 filings · 15 docs
Floor 33p · 3 filings · 20 docs
Floor 22p · 2 filings · 15 docs
Floor 18p · 2 filings · 15 docs
Cellar6p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC PACT PRESERVATION PARTNERS408/05/2026
FAIRSTEAD MANAGEMENT404/09/2026
N.Y.C. HOUSING AUTHORITY103/22/2026
OWNER OF 1568 STERLING PL103/22/2026
NYCHA103/21/2026
NEW YORK CITY HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC107/10/2026
SOCOTEC, INC.209/10/2025
ASHRAF CORP208/26/2025
DAGHER ENGINEERING PLLC312/23/2024
SLM ARCHITECTURE, P.C.111/13/2024
MADSEN CONSULTING ENGINEERING, PLLC109/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RYBAK DEVELOPMENT203/21/2026
METROPOLIS GROUP INC1003/21/2026
RIGGING CONSULTANTS203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LS GENERAL CORPGeneral Contractor507/16/2026
FSC D&C LLCGeneral Contractor307/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
A & E PLUMBING CORPPlumbing107/08/2026
RYBURN PHILLIPSElectrical103/21/2026
DUAL FUEL PLUBING & HTINGPlumbing107/08/2026
HIGH POINT CONSTRUCTIONGeneral Contractor108/05/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404107/10/2026
PCS ENGINEERING3745110/21/2025
METRIC CONSULTING AND INS1803709/10/2025
Building Lifecycle
All (104)Filed (11)Permit Issued (15)Signed Off (6)Violation (32)Inspection (6)Objection (4)Special Inspection (30)
08/04/2026
Permit issued — General Construction
B01365790-I1-GC
07/17/2026
Signed off — Alteration
STRUCTURAL WORK FOR EXISTING FIRE ESCAPE STRUCTURAL REPAIRS AT EAST 3RD FLOOR LANDING AND WEST 2ND FLOOR LANDING AS NEEDED.
B00911898-I1
07/15/2026
Permit issued — Structural
B00911898-I1-ST
07/10/2026
Signed off — Alteration
Facade repairs and roof replacement. No change in egress, use or occupancy.
B00931341-I1
07/10/2026
Filed — Alteration
INSTALLATION OF NEW RAILING OVER EXISTING PARAPET WALLS AT ROOF AREA. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01365790-I1
06/03/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01200792-I1
05/21/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00925946-I1
04/28/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/08/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923981-I1
03/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00979005-I1
03/18/2026
Permit issued — General Construction
B00919121-I1-GC
03/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
AKM RAHMAN
03/01/2026
Special inspection requirement — Final
AKM RAHMAN
02/10/2026
Permit issued — Supported Scaffold
B01275241-I1-SF
02/10/2026
Permit issued — Suspended Scaffold
B01292978-I1-SC
02/10/2026
Permit issued — General Construction
B00931341-I1-GC
11/21/2025
Permit issued — General Construction
B00919121-I1-GC
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/24/2025
Permit issued — Suspended Scaffold
B01292978-I1-SC
10/21/2025
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
B01292978-I1
10/21/2025
Special inspection requirement — Post-installed Anchors
Michael Walsh
10/21/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
09/24/2025
Permit issued — General Construction
B00931341-I1-GC
09/10/2025
Filed — Alteration
Facade repairs and roof replacement. No change in egress, use or occupancy.
B00931341-P1
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
09/10/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
09/10/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
08/29/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
08/29/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
08/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/26/2025
Filed — Alteration
B01275241-I1
08/26/2025
Permit issued — Supported Scaffold
B01275241-I1-SF
04/01/2025
Permit issued — Sidewalk Shed
B01200792-I1-SH
03/31/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01200792-I1
02/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/03/2025
Permit issued — Plumbing
B00979005-I1-PL
01/02/2025
Permit issued — Mechanical Systems
B00923981-I1-MS
12/23/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00979005-I1
12/22/2024
Violation issued (HPD, open)
C
12/22/2024
Violation issued (HPD, open)
C
12/22/2024
Violation issued (HPD, open)
C
12/17/2024
Filed — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923981-I1
11/25/2024
Permit issued — General Construction
B00919121-I1-GC
11/20/2024
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
11/20/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
11/13/2024
Filed — Alteration
B00919121-I1
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/12/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
11/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
11/12/2024
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
11/12/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
11/12/2024
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
11/12/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
11/12/2024
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHIGH POINT CONSTRUCTION08/04/2026
DOB NOWStructuralSigned-offLS GENERAL CORP07/15/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/18/2026
DOB NOWSupported ScaffoldPermit IssuedLS GENERAL CORP02/10/2026
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA02/10/2026
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP02/10/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC11/21/2025
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA10/24/2025
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP09/24/2025
DOB NOWSupported ScaffoldPermit IssuedLS GENERAL CORP08/26/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/01/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP01/03/2025
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL01/02/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC11/25/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING08/20/2024
BISOTISSUEDBILTMORE GENERAL CONTRACTORS12/23/2008
2 projects · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025Permit IssuedALBA ELECTRIC CORPGeneral Wiring
02/26/2018CompleteA TECH ELEC ENTERPRISESGeneral Wiring
1 project · most recent 09/26/2023
Steel
FiledStatusContractorScope
09/26/2023Signed-offLS GENERAL CORPSteel
1 project · most recent 03/31/2025
Sidewalk Shed
FiledStatusContractorScope
03/31/2025Signed-offARSENAL SCAFFOLD INCSidewalk Shed
1 project · most recent 10/21/2025
Suspended Scaffold
FiledStatusContractorScope
10/21/2025Permit IssuedLS GENERAL CORPSuspended Scaffold
1 project · most recent 10/21/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/21/2025Permit IssuedLS GENERAL CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/28/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
03/12/2026Tenant Protection Plan ComplianceAKM RAHMANspecial
03/01/2026FinalAKM RAHMANprogress
10/21/2025Post-installed AnchorsMichael Walshspecial
10/21/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
09/10/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
09/10/2025FinalSAMI HAJJAR P.Eprogress
09/10/2025MasonrySAMI HAJJAR P.Especial
08/29/2025FinalSAMI HAJJAR P.Eprogress
08/29/2025MasonrySAMI HAJJAR P.Especial
08/29/2025Tenant Protection Plan Compliance—special
11/20/2024Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
11/20/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
11/12/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/12/2024FinalSAMI HAJJAR P.Eprogress
11/12/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/12/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
11/12/2024Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
11/12/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
11/12/2024VestibulesSAMI HAJJAR P.Eenergy_progress
11/12/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
11/12/2024Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
11/12/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
11/12/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
11/12/2024Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
12/18/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
Latest 25 of 35.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026B00911898-I1Request digital key ↗
08/24/2026B00925946-I1Request digital key ↗
08/23/2026B00919121-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
12/23/2008310200706Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/30/2008310200706Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00911898-I1Open ↗
08/23/2026B00919121-P1Open ↗
08/23/2026B00919121-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026B01365790-I1Open ↗
09/01/2026B00919121-I1Open ↗
09/01/2026B00911898-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B01365790-I1Open ↗
09/01/2026B00919121-I1Open ↗
09/01/2026B00919121-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/31/2009310200706Open ↗
09/30/2008310200706Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026B00919121-P1Open ↗
08/23/2026B00919121-I1Open ↗
08/23/2026B00923981-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/30/2008310200706Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00931341-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/24/2026B00925946-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/20/2026B00931341-I1Open ↗
08/13/2026B01200792-I1Open ↗
08/13/2026B01275241-I1Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/30/2009310200706Open ↗
12/01/2009310200706Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/30/2008310200706Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/31/2009310200706Open ↗
09/30/2008310200706Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/30/2008310200706Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01292978-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01292978-I1Open ↗