← Back
BuildNYC
Office with commercial, 1-6 stories
Pioneer Works Art Foundation
159 PIONEER STREET · BIN 3332119
💬 Discuss this project
1866Year Built
3Stories
O5Building Class
M2-1Zoning
29,587 sfGross Floor Area
3Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: Pioneer & King I · 13,045 sf lot · 2.27 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPioneer Works140p · 8 filings · 20 docs
Floor 3Pioneer Works137p · 8 filings · 20 docs
Floor 2Pioneer Works136p · 8 filings · 20 docs
Floor 1Pioneer WorksUnder Construction12p · 42 filings · 20 docs
MezzaninePioneer Works91p · 4 filings · 20 docs
Site & exteriorPioneer Works71p · 11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pioneer Works10810/14/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Abs Engineering910/13/2026
Nathan Rich, RA409/04/2026
Silman606/02/2026
Andrew Formichella801/26/2026
MSM Engineering Services209/25/2024
Ashraf101/05/2024
WXY Architecture + Urban Design311/28/2022
Urban Integrations111/28/2022
Kevin Gallen PE210/24/2022
Enthink Engineers507/26/2022
Robert Silman Associates304/21/2022
Trimble Architecture2110/08/2021
KZ Engineering304/22/2021
Backforty Architecture105/01/2019
SYNC Architecture101/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates3403/21/2026
KM Associates of New York2003/21/2026
Metropolis Group803/21/2026
DVA Advisors403/21/2026
Synergy Building Consultants303/21/2026
Municipal Building Consultants1003/21/2026
Green Studio203/21/2026
K & M Associates2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yorke ConstructionGeneral Contractor1607/08/2026
Radek SzczesnyGeneral Contractor909/09/2026
Platinum Services NYScaffold407/08/2026
Arsenal ScaffoldScaffold407/08/2026
United Plumbing MechanicalFire Protection307/08/2026
Lawrence J. LevineFire Protection303/21/2026
JM&A ConstructionGeneral Contractor303/21/2026
Par Plumbing CoPlumbing207/08/2026
Andamio ScaffoldingScaffold207/08/2026
Vintage Electric ServiceElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/22/2026
City/Suburban PlumbingPlumbing107/08/2026
Par PlumbingGeneral Contractor103/22/2026
Apollo Electric InsdusElectrical103/22/2026
Heso ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8432710/13/2026
Building Lifecycle
All (227)Filed (70)Permit Issued (35)Signed Off (13)Violation (12)Inspection (17)Objection (50)Special Inspection (30)
10/15/2026
Objection resolved — Resolved
10/14/2026
Objection raised — Other
10/13/2026
Filed — Alteration
additions/modifications to existing mechanical system as per plans filed herewith. no change in use egress or occupancy.
B00960189-P2
10/07/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Chimneys and vents
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Smoke Control Systems Testing
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Final
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
10/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
09/08/2026
Permit issued — General Construction
B08044896-I1-GC
09/04/2026
Filed — No Work
B00989916-I1
08/10/2026
Objection resolved — Resolved
07/16/2026
Objection raised — Other
06/02/2026
Filed — Alteration
structural work as per plans filed herewith in conjunction to alt 1 321192071.
B00920661-P4
06/02/2026
Signed off — Alteration
INSTALLATION OF EMERGENCY GENERATOR EQUIPPED WITH SOUND ATTENUATION PACKAGE, 60 GALLONBELLY TANK, AND AUTOMATIC LOAD BANK.
B00960198-I1
06/02/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
JOHN MCMONAGLE
06/02/2026
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
06/02/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
06/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
06/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
JOHN MCMONAGLE
06/02/2026
Special inspection requirement — Structural Steel - Welding
JOHN MCMONAGLE
05/21/2026
Signed off — Alteration
additions/modifications to existing sprinkler system
B00960197-I1
04/28/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/10/2026
Special inspection requirement — Final
JOHN MCMONAGLE
04/10/2026
Special inspection requirement — Structural Cold-Formed Steel
JOHN MCMONAGLE
04/10/2026
Special inspection requirement — Structural Steel - Details
JOHN MCMONAGLE
03/13/2026
Filed — Alteration
INSTALLATION OF EMERGENCY GENERATOR EQUIPPED WITH SOUND ATTENUATION PACKAGE, 60 GALLONBELLY TANK, AND AUTOMATIC LOAD BANK.
B00960198-P1
03/03/2026
Signed off — Alteration
Filing for general construction non-structural demolition related to build-out- accessory observatory to exhibition hall. Related to alt 1 change of use and vertical enlargement filed under application 321192071.
B00987021-I1
02/25/2026
Violation issued (FDNY_ORDER, closed)
02/20/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
JOHN MCMONAGLE
02/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/20/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JOHN MCMONAGLE
02/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/17/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00984166-I1
02/17/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01116503-I1
01/26/2026
Filed — No Work
B01349153-I1
12/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/24/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/28/2025
Special inspection requirement — Final
JOHN MCMONAGLE
10/24/2025
Objection resolved — Addressed
10/20/2025
Filed — Alteration
structural work as per plans filed herewith in conjunction to alt 1 321192071.
B00920661-P3
10/17/2025
Permit issued — Boiler Equipment
B00960198-I1-BE
10/16/2025
Filed — Alteration
Filing for general construction non-structural demolition related to build-out- accessory observatory to exhibition hall. Related to alt 1 change of use and vertical enlargement filed under application 321192071.
B00987021-P2
10/15/2025
Objection raised — Cost
10/08/2025
Filed — Alteration
additions/modifications to existing mechanical system as per plans filed herewith. no change in use egress or occupancy.
B00960189-P1
10/08/2025
Filed — Alteration
addition/modification to existing plumbing system as per plans filed herewith
B00960194-P2
09/15/2025
Permit issued — General Construction
B08044896-I1-GC
08/20/2025
Objection resolved — Addressed
07/28/2025
Objection raised — Admin
07/24/2025
Filed — No Work
B01258921-I1
Latest 60 of 227 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRadek Szczesny09/08/2026
DOB NOWBoiler EquipmentSigned-offChampion Combustion10/17/2025
DOB NOWGeneral ConstructionPermit IssuedRadek Szczesny09/15/2025
DOB NOWGeneral ConstructionSigned-offYorke Construction07/22/2025
DOB NOWFoundationPermit IssuedYorke Construction01/24/2025
DOB NOWStructuralPermit IssuedYorke Construction01/24/2025
DOB NOWGeneral ConstructionSigned-offYorke Construction01/24/2025
DOB NOWMechanical SystemsPermit IssuedYorke Construction01/24/2025
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY01/06/2025
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY09/26/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedPlatinum Services NY09/25/2024
DOB NOWGeneral ConstructionPermit IssuedRadek Szczesny09/16/2024
DOB NOWFoundationPermit IssuedYorke Construction02/28/2024
DOB NOWStructuralPermit IssuedYorke Construction01/29/2024
DOB NOWMechanical SystemsPermit IssuedYorke Construction01/24/2024
DOB NOWSprinklersSigned-offUnited Plumbing Mechanical01/23/2024
DOB NOWPlumbingSigned-offPar Plumbing Co01/19/2024
DOB NOWGeneral ConstructionSigned-offYorke Construction01/17/2024
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY01/08/2024
DOB NOWGeneral ConstructionPermit IssuedRadek Szczesny11/29/2023
DOB NOWStandpipeSigned-offUnited Plumbing Mechanical12/29/2022
DOB NOWGeneral ConstructionPermit IssuedRadek Szczesny12/02/2022
DOB NOWFoundationSigned-offYorke Construction04/25/2022
DOB NOWPlumbingSigned-offCity/Suburban Plumbing04/15/2022
DOB NOWSprinklersSigned-offUnited Plumbing Mechanical04/08/2022
DOB NOWStructuralPermit IssuedYorke Construction04/04/2022
DOB NOWGeneral ConstructionSigned-offYorke Construction02/20/2022
DOB NOWGeneral ConstructionSigned-offYorke Construction02/20/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/26/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding01/26/2022
DOB NOWGeneral ConstructionPermit IssuedYorke Construction09/02/2021
DOB NOWCurb CutPermit IssuedJM&A Construction08/27/2021
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold04/23/2021
DOB NOWConstruction FenceSigned-offArsenal Scaffold12/27/2019
DOB NOWSidewalk ShedSigned-offArsenal Scaffold12/23/2019
BIS—ISSUEDYorke Construction02/10/2022
BIS—ISSUEDInnovative Ventures Team11/10/2020
BISPLISSUEDEH Plumbing & Heating02/12/2020
BIS—ISSUEDNY NJ Restoration01/21/2020
BISOTISSUEDNY NJ Restoration05/07/2019
+ 16 more permits on file
1 project · most recent 10/13/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/13/2026Permit IssuedYorke ConstructionAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Tempmaster TH30N3DP2S1APP41A2 30 tons · Rooftop Unit ×1
TV30N3DP2S1APP41A2 30 tons · Rooftop Unit ×1
Lg ARDE-112-30C-5I-C-A1 5 tons · Doas ×1
Cooling
Mitsubishi Electric PUY-A12NKA7 12,000 BTU · Condensing Unit ×2
PUY-A24NHA7 22,000 BTU · Condensing Unit ×2
Ventilation
Lg ×2
1 project · most recent 11/21/2023
FiledStatusContractorScope
11/21/2023Signed-offUnited Plumbing Mechanical—
1 project · most recent 10/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/08/2025Signed-offPar Plumbing CoGas, Water/Sanitary
5 projects · most recent 07/20/2026
General Wiring
FiledStatusContractorScope
07/20/2026CompleteApollo Electric InsdusGeneral Wiring
04/01/2024CompleteTF ElectricalGeneral Wiring
01/19/2022CompleteBorowide Elect'l Contractors—
07/01/2020CompleteDelta Phase Electrical1 meters
12/31/2019CompleteNash Electric Services—
2 projects · most recent 06/02/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/02/2026Permit IssuedYorke ConstructionSteel, Concrete, Masonry, Wood
11/28/2022Signed-offYorke ConstructionSteel, Concrete
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/28/2026Pass-Final Boiler Equipment InspectionPassView ↗
12/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/24/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/06/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/03/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2022Pass-Final PL - UndergroundPassView ↗
05/28/2022Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 138
DateRequirementInspectorRole
10/07/2026Emergency and Standby Power Systems (Generator)JOHN MCMONAGLEspecial
10/07/2026Chimneys and ventsJOHN MCMONAGLEspecial
10/07/2026Heating SystemsJOHN MCMONAGLEspecial
10/07/2026Mechanical SystemsJOHN MCMONAGLEspecial
10/07/2026Post-installed AnchorsJOHN MCMONAGLEspecial
10/07/2026Smoke Control Systems TestingJOHN MCMONAGLEspecial
10/07/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
10/07/2026FinalJOHN MCMONAGLEprogress
10/07/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
10/07/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
10/07/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
10/07/2026Shutoff dampersJOHN MCMONAGLEenergy_progress
10/07/2026Maintenance informationJOHN MCMONAGLEenergy_progress
10/07/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
10/07/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/02/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)JOHN MCMONAGLEspecial
06/02/2026Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
06/02/2026Structural Steel - High Strength BoltingJOHN MCMONAGLEspecial
06/02/2026Structural Steel - WeldingJOHN MCMONAGLEspecial
06/02/2026Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
06/02/2026Post-installed AnchorsJOHN MCMONAGLEspecial
04/10/2026Structural Steel - DetailsJOHN MCMONAGLEspecial
04/10/2026Structural Cold-Formed SteelJOHN MCMONAGLEspecial
04/10/2026FinalJOHN MCMONAGLEprogress
02/20/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsJOHN MCMONAGLEspecial
Latest 25 of 138.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pioneer WorksArts / Culture / EntertainmentEntire building
Project B00987021 Alteration · LOC Issued · 01/10/2024
Project B08044896 Alteration · Permit Entire · 11/28/2022
Project B00658411 Alteration · LOC Issued · 02/17/2022
Project B00654482 Alteration · Permit Entire · 01/13/2022
Project B00640438 Alteration · Permit Entire · 12/09/2021
Project B00582336 Alteration · Permit Entire · 08/25/2021
Project B00472971 Alteration · Approved · 04/01/2021
Project B00472980 Alteration · Permit Entire · 04/01/2021
Project B00483399 Alteration · LOC Issued · 03/10/2021
Project B00428044 Alteration · LOC Issued · 04/22/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 593 on file (BIS + DOB NOW)
▸Plans & Drawings70
▸DOB NOWPlans/Sketch36
09/01/2026B00483399-I1Request digital key ↗
09/01/2026B00582336-I1Request digital key ↗
08/31/2026B00640438-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly26
09/02/2026B00121103-I1Request digital key ↗
09/02/2026B00155484-I1Request digital key ↗
09/02/2026B00157122-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
10/20/2026B00989916-I1Request digital key ↗
10/13/2026B00989916-I1Request digital key ↗
09/02/2026B00375828-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
09/01/2026B00472971-I1Request digital key ↗
09/01/2026B00472980-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00282558-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00282552-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/01/2026B00428044-I1Request digital key ↗
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION58
11/25/2025321192071Open ↗
05/15/2025321192071Open ↗
05/06/2025321192071Open ↗
Showing 3 of 58 on file for this type
▸BISWORK PERMIT APPLICATION24
06/01/2021321192071Open ↗
11/10/2020321192071Open ↗
11/02/2020321192071Open ↗
Showing 3 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/12/2021321192071Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
02/05/2024321192071Open ↗
09/24/2020321592521Open ↗
Showing 2 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
09/24/2020321592521Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
09/24/2020321592521Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/24/2020321592521Open ↗
▸Seals & Professional Certifications158
▸DOB NOWDPL-1: Design Professional Seal & Signature70
10/15/2026B00960189-P2Open ↗
10/13/2026B00989916-I1Open ↗
09/02/2026B00121103-I1Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
10/15/2026B00960189-P2Open ↗
10/15/2026B00960189-P2Open ↗
10/09/2026B00658411-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
10/15/2026B00960189-P2Open ↗
10/15/2026B00960189-P2Open ↗
09/02/2026B00920661-P2Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
05/14/2019321945909Open ↗
04/30/2019321945909Open ↗
01/09/2019321075787Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
08/03/2021322098065Open ↗
04/30/2019321945909Open ↗
11/16/2018321075787Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/30/2019321945909Open ↗
11/16/2018321075787Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING10
02/24/2021340407214Open ↗
12/28/2020321192071Open ↗
12/23/2020321192071Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
07/06/2021321644324Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
07/09/2021322098065Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/11/2019321192071Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
04/17/2025321192071Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
10/15/2026B00960189-P2Open ↗
08/26/2026B00960194-P1Open ↗
08/26/2026B00960194-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026B00658411-I1Open ↗
08/29/2026B00654482-S2Open ↗
08/29/2026B00654482-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/24/2019340407214Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
09/11/2019321192071Open ↗
07/12/2019340407214Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
01/03/2025321192071Open ↗
01/03/2025321192071Open ↗
01/03/2025321192071Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/18/2026B00960198-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY22
01/03/2025321192071Open ↗
05/08/2024321192071Open ↗
09/26/2023321192071Open ↗
Showing 3 of 22 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
04/24/2019340407214Open ↗
▸BISDEP Hydrant Flow Test Letter1
07/12/2019340407214Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs65
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter34
10/15/2026B00960189-P2Open ↗
10/13/2026B00989916-I1Open ↗
08/31/2026B00668385-I1Open ↗
Showing 3 of 34 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
05/15/2025321192071Open ↗
05/06/2025321192071Open ↗
03/18/2025321192071Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/16/2021340407214Open ↗
08/27/2021321945909Open ↗
08/18/2021321644324Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER4
06/01/2021321192071Open ↗
11/02/2020321192071Open ↗
10/26/2020321192071Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/31/2026B00658411-I1Open ↗
08/29/2026B00654482-S1Open ↗
08/29/2026B00654482-I1Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT20
10/13/2025321192071Open ↗
10/08/2025321192071Open ↗
10/08/2025321192071Open ↗
Showing 3 of 20 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/16/2021340407214Open ↗
08/27/2021321945909Open ↗
08/18/2021321644324Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION29
01/30/2026321192071Open ↗
10/23/2025321192071Open ↗
04/17/2025321192071Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING COVER SHEET11
11/24/2025321192071Open ↗
07/09/2021322098065Open ↗
09/02/2020321592521Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM4
06/01/2021321192071Open ↗
01/09/2019321075787Open ↗
Showing 2 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents43
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION19
01/30/2026321192071Open ↗
01/30/2026321192071Open ↗
01/30/2026321192071Open ↗
Showing 3 of 19 on file for this type
▸BISPLOT DIAGRAM6
01/03/2025321192071Open ↗
05/08/2024321192071Open ↗
Showing 2 of 6 on file for this type
▸BISSupporting Document: Fee Deferment3
04/17/2025321192071Open ↗
04/17/2025321192071Open ↗
08/05/2024321192071Open ↗
▸BISUnknown3
12/19/2019321192071Open ↗
12/19/2019321192071Open ↗
12/19/2019321192071Open ↗
▸BISSupporting Document: Fee Exempt2
01/30/2026321192071Open ↗
08/05/2024321192071Open ↗
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION2
04/17/2025321192071Open ↗
08/05/2024321192071Open ↗
▸BISBSA VARIANCE1
01/02/2024321192071Open ↗
▸BISBPP-DOT: SIDEWALK ENCROACHMENT1
07/09/2021322098065Open ↗
▸DOB NOWAlternate Plan 41
10/13/2026B00989916-I1Open ↗
▸DOB NOWAlternate Plan 71
10/13/2026B00989916-I1Open ↗
▸DOB NOWAlternate Plan 11
10/13/2026B00989916-I1Open ↗
▸DOB NOWAlternate Plan 61
10/13/2026B00989916-I1Open ↗
▸DOB NOWPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 51
10/13/2026B00989916-I1Open ↗