← Back
Factory, industrial, semi-fireproof
16 NORMAN AVENUE
BROOKLYN · Greenpoint · BIN 3065941
💬 Discuss this project
1931Year Built
1Stories
F4Building Class
M1-1Zoning
—Gross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: NORMAN DOBBIN, LLC · 0.91 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof44p · 5 filings · 20 docs
Floor 1120p · 18 filings · 20 docs
Cellar12p · 2 filings · 20 docs
Sub-Basement12p · 1 filing · 8 docs
Site & exterior59p · 14 filings · 20 docs
Filed — no permit issued8p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OUT OF HOME HOLDINGS11707/08/2026
AMS CONTRACTOR INC503/22/2026
HOWARD MACHINE DESIGN203/21/2026
NORMAN DOBBIN, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS3203/21/2026
R H DRUMMOND EXP203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
SOL BUILDING CONSULTING SERVICES1903/21/2026
D R BROWN1203/21/2026
MUNICIPAL BUILDING CONSULTANTS603/21/2026
LMS-ACE SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THOMAS MAINTENANCE INCGeneral Contractor607/08/2026
NORTH SHORE NEON SIGN LLCGeneral Contractor507/08/2026
BALATON CONSULTING LLCScaffold507/08/2026
RED HOOK SIGN ELECTScaffold407/08/2026
IRWIN FRIEDMAN & SON INCFire Protection307/08/2026
AMS CONTRACTOR INCGeneral Contractor303/21/2026
COOPER WORKS INCGeneral Contractor307/08/2026
RED HOOK SIGN AND ELECTRIGeneral Contractor207/08/2026
IRWIN FRIEDMAN & SON INCPlumbing207/08/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
NORTH SHORE NEON SIGNGeneral Contractor104/09/2026
3-G SERVICES LIMITEDGeneral Contractor104/09/2026
IDEA BUILDERS LLCGeneral Contractor104/09/2026
MECHANICAL EAST CO.,INCGeneral Contractor104/09/2026
GREEN APPLE ELECL SVCS LLElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN DESIGN CONSTRUCT, L4145708/30/2024
MOTTOLA RINI ENGINEERS, P3251308/27/2024
JACK GREEN ASSOCIATES422208/05/2024
HARDIE & ASSOCIATES, CONS3760206/12/2024
METROSPEC SIA6420204/11/2024
EDG2578302/28/2023
SOIL MECHANICS DRILLING C2325807/27/2022
INFINITY DESIGN CONSULTAN2760101/01/2022
Building Lifecycle
All (222)Filed (51)Permit Issued (36)Signed Off (32)Violation (19)Inspection (14)Objection (40)Special Inspection (30)
09/21/2026
Objection resolved — Resolved
09/21/2026
Objection resolved — Resolved
09/21/2026
Objection resolved — Resolved
09/21/2026
Objection resolved — Resolved
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/07/2026
Filed — Alteration
Scope of work is to reflect as-built conditions per the request from the audit division to resolve open comments in relation to ALT- CO, DOB # B08010856-I1
B01424430-I1
06/30/2026
Special inspection requirement — Final
02/20/2026
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2025
Filed — Alteration CO
INTERIOR RENOVATION TO ADD INTERIOR WALLS AND DOORS TO EXISTING SPACE. (NO DEMOLITION OR CHANGE OF EXTERIOR ENVELOPE OF THE BUILDING)
B08010856-P4
12/17/2024
Objection resolved — Addressed
12/16/2024
Objection raised — Other
12/04/2024
Filed — Alteration CO
INTERIOR RENOVATION TO ADD INTERIOR WALLS AND DOORS TO EXISTING SPACE. (NO DEMOLITION OR CHANGE OF EXTERIOR ENVELOPE OF THE BUILDING)
B08010856-P3
11/20/2024
Signed off — Alteration
PROPOSED RENOVATION INCLUDING REPAIR AND REPLACEMENT PART ROOF STRUCTURE AND WATERPROOFING SYSTEM, REPLACE PARAPETS, AND REMOVE ALL EXISTING INTERIOR NON-BEARING PARTITIONS AS INDICATED ON PLANS SUBMITTED HEREWITH.
B00762984-I1
11/19/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00676925-I1
11/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/01/2024
Signed off — Alteration
Decorative facade alteration on Dobbin Street and on part of Norman Avenue related to new retail tenant improvements
B01024978-I1
10/31/2024
Signed off — Alteration
Installation of Storm Piping & Sump Pump and Installation & Removal of Plumbing Fixtures. As per plans filed herewith, no change to use, occupancy or egress.
B08054893-I1
10/09/2024
Signed off — Alteration
PROPOSED FOOTING FOR GROUND SIGN (SOUTH) FILED UNDER SEPARATE APPLICATION # B00632472. SIGN STRUCTURE FILED UNDER SEPARATE APPLICAITON # B00632457.
B00632464-I1
10/09/2024
Signed off — Alteration
PROPOSED FOOTING FOR GROUND SIGN (NORTH) FILED UNDER SEPARATE APPLICATION # B00632445. SIGN STRUCTURE FILED UNDER SEPARATE APPLICATION # B00598742.
B00632431-I1
10/07/2024
Signed off — Alteration
ADD NEW TEMPORARY CONSTRUCTION FENCE
B00697064-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2024
Signed off — Alteration
Installation of (2) New Sprinkler Heads at basement level. As per plans filed herewith, no change to use occupancy or egress.
B00914925-I1
09/10/2024
Filed — Alteration CO
INTERIOR RENOVATION TO ADD INTERIOR WALLS AND DOORS TO EXISTING SPACE. (NO DEMOLITION OR CHANGE OF EXTERIOR ENVELOPE OF THE BUILDING)
B08010856-P2
09/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/30/2024
Filed — Alteration
MECHANICAL A/C AND AIR DUCT WORK ASSOCIATED WITH THE INTERIOR ALTERATIONS OF AN EXISTING VACANT SPACE TO INSTALL A NEW RETAIL STORE. IN THE NORTHEAST CORNER OF THE TENANT SPACE THERE WILL BE A SMALL ACCESSORY CAFE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01028847-P1
08/30/2024
Signed off — Alteration
MECHANICAL A/C AND AIR DUCT WORK ASSOCIATED WITH THE INTERIOR ALTERATIONS OF AN EXISTING VACANT SPACE TO INSTALL A NEW RETAIL STORE. IN THE NORTHEAST CORNER OF THE TENANT SPACE THERE WILL BE A SMALL ACCESSORY CAFE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01028847-I1
08/29/2024
Signed off — Alteration
NEW MECHANICAL WORK ASSOCIATED WITH TENANT FIT OUT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00946442-I1
08/28/2024
Signed off — Alteration
SPRINKLER WORK ASSOCIATED WITH THE INTERIOR ALTERATIONS OF AN EXISTING VACANT SPACE TO INSTALL A NEW RETAIL STORE. IN THE NORTHEAST CORNER OF THE TENANT SPACE THERE WILL BE A SMALL ACCESSORY CAFE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01029814-I1
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
08/28/2024
Special inspection requirement — Mechanical Systems
Anthony Rini, III
08/28/2024
Special inspection requirement — Maintenance information
Anthony Rini, III
08/28/2024
Special inspection requirement — Shutoff dampers
Anthony Rini, III
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
08/28/2024
Special inspection requirement — Final
Anthony Rini, III
08/28/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Anthony Rini, III
08/27/2024
Filed — Alteration
NEW MECHANICAL WORK ASSOCIATED WITH TENANT FIT OUT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00946442-P1
08/23/2024
Special inspection requirement — Mechanical Systems
Anthony Rini, III
08/23/2024
Special inspection requirement — Final
Anthony Rini, III
08/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
08/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
08/23/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Anthony Rini, III
08/23/2024
Special inspection requirement — Maintenance information
Anthony Rini, III
08/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
08/23/2024
Special inspection requirement — Shutoff dampers
Anthony Rini, III
08/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
john senisi
08/13/2024
Special inspection requirement — Mechanical Systems
john senisi
08/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
john senisi
08/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
john senisi
08/13/2024
Special inspection requirement — Final
john senisi
08/13/2024
Special inspection requirement — Maintenance information
john senisi
08/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
john senisi
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
john senisi
08/13/2024
Special inspection requirement — Duct leakage testing, insulation and design
john senisi
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
john senisi
08/12/2024
Permit issued — General Construction
B08010856-I1-GC
Latest 60 of 222 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCOOPER WORKS08/12/2024
DOB NOWPlumbingSigned-offIRWIN FRIEDMAN & SON INC05/10/2024
DOB NOWSprinklersSigned-offIRWIN FRIEDMAN & SON INC05/10/2024
DOB NOWSprinklersSigned-offIRWIN FRIEDMAN & SON INC05/10/2024
DOB NOWMechanical SystemsSigned-offMECHANICAL EAST CO.,INC04/26/2024
DOB NOWGeneral ConstructionSigned-off3-G SERVICES LIMITED04/25/2024
DOB NOWSprinklersSigned-offIRWIN FRIEDMAN & SON INC12/08/2023
DOB NOWSprinklersSigned-offANTHONY DISABATO11/30/2023
DOB NOWPlumbingSigned-offANTHONY DISABATO11/30/2023
DOB NOWMechanical SystemsSigned-offCOOPER WORKS11/20/2023
DOB NOWGeneral ConstructionSigned-offCOOPER WORKS11/14/2023
DOB NOWGeneral ConstructionSigned-offTHOMAS MAINTENANCE INC10/26/2023
DOB NOWPlumbingSigned-offIRWIN FRIEDMAN & SON INC09/15/2023
DOB NOWConstruction FenceSigned-offTHOMAS MAINTENANCE INC01/05/2023
DOB NOWStructuralSigned-offTHOMAS MAINTENANCE INC11/03/2022
DOB NOWGeneral ConstructionSigned-offTHOMAS MAINTENANCE INC09/30/2022
DOB NOWFoundationSigned-offTHOMAS MAINTENANCE INC08/24/2022
DOB NOWFoundationSigned-offTHOMAS MAINTENANCE INC08/24/2022
DOB NOWFoundationSigned-offNORTH SHORE NEON SIGN LLC08/04/2022
DOB NOWFoundationSigned-offNORTH SHORE NEON SIGN LLC08/04/2022
DOB NOWConstruction FenceSigned-offIDEA BUILDERS LLC03/15/2022
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC02/15/2022
DOB NOWStructuralSigned-offNORTH SHORE NEON SIGN LLC02/02/2022
DOB NOWStructuralSigned-offNORTH SHORE NEON SIGN LLC02/02/2022
DOB NOWStructuralSigned-offNORTH SHORE NEON SIGN LLC02/02/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/26/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/26/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/25/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/25/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/25/2022
DOB NOWStructuralSigned-offRED HOOK SIGN AND ELECTRI11/27/2019
DOB NOWStructuralSigned-offRED HOOK SIGN AND ELECTRI11/27/2019
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT11/04/2019
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT11/01/2019
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT11/01/2019
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT11/01/2019
BISPLISSUEDJ JEKOWSKY & SONS04/09/1993
BISBLISSUEDJ JEKOWSKY & SONS04/09/1993
5 projects · most recent 02/24/2025
General Wiring
FiledStatusContractorScope
02/24/2025CompleteGREEN APPLE ELECL SVCS LLGeneral Wiring
10/17/2024CompleteKJK ELECTRIC INCGeneral Wiring
06/05/2024CompleteGREEN APPLE ELECL SVCS LLGeneral Wiring
03/24/2024CompleteELPO ELECTRICAL CONTG INC3 meters, 2 new_meters
07/09/2020CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
11/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/08/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
06/30/2026Final—progress
08/28/2024HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
08/28/2024Maintenance informationAnthony Rini, IIIenergy_progress
08/28/2024HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
08/28/2024FinalAnthony Rini, IIIprogress
08/28/2024Exhaust and Vent Systems in Plenums and DuctsAnthony Rini, IIIspecial
08/28/2024Mechanical SystemsAnthony Rini, IIIspecial
08/28/2024HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
08/28/2024Shutoff dampersAnthony Rini, IIIenergy_progress
08/23/2024FinalAnthony Rini, IIIprogress
08/23/2024Shutoff dampersAnthony Rini, IIIenergy_progress
08/23/2024HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
08/23/2024HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
08/23/2024HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
08/23/2024Maintenance informationAnthony Rini, IIIenergy_progress
08/23/2024Mechanical SystemsAnthony Rini, IIIspecial
08/23/2024Exhaust and Vent Systems in Plenums and DuctsAnthony Rini, IIIspecial
08/13/2024HVAC-R and service water heating system controlsjohn senisienergy_progress
08/13/2024HVAC-R and service water heating equipmentjohn senisienergy_progress
08/13/2024Fire-Resistant Penetrations and Jointsjohn senisispecial
08/13/2024Mechanical Systemsjohn senisispecial
08/13/2024HVAC-R and service water piping design and insulationjohn senisienergy_progress
08/13/2024Energy Code Compliance Inspectionsjohn senisiprogress
08/13/2024Finaljohn senisiprogress
08/13/2024Fire-Resistance Rated Constructionjohn senisiprogress
Latest 25 of 98.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch45
08/31/2026B00642615-I1Request digital key ↗
08/31/2026B00632551-I1Request digital key ↗
08/31/2026B00632543-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/02/2026B00239551-I1Request digital key ↗
09/02/2026B00239540-I1Request digital key ↗
09/02/2026B00239516-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00239609-I1Request digital key ↗
09/02/2026B00239567-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications134
▸DOB NOWProgress Inspector Seal & Signature51
09/02/2026B00946395-I1Open ↗
09/01/2026B00632464-S1Open ↗
09/01/2026B00632464-S1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature51
08/31/2026B00642615-I1Open ↗
08/31/2026B00632551-I1Open ↗
08/31/2026B00632543-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026B00914925-P1Open ↗
09/23/2026B00946452-I1Open ↗
09/02/2026B00946395-I1Open ↗
Showing 3 of 32 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/31/2026B00642615-I1Open ↗
08/31/2026B00633328-I1Open ↗
08/31/2026B00632457-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/25/2026B01028847-I1Open ↗
08/24/2026B01029814-I1Open ↗
08/24/2026B01024978-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/14/2026B00762984-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/31/2026B00632431-I1Open ↗
08/31/2026B00632431-P1Open ↗
08/31/2026B00632464-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram2
08/31/2026B00632431-I1Open ↗
08/31/2026B00632464-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/31/2026B00632431-I1Open ↗
08/31/2026B00632464-I1Open ↗
▸Other Documents3
▸DOB NOWTR5H Test Report2
08/31/2026B00632431-S1Open ↗
08/31/2026B00632464-S1Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type