Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects16th Street Tenants CORP.1 filing
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
RoofAkam Associates, INC.Under Construction1p · 1 filing · 7 docs
Architecture
EXTERIOR FACADE REPAIRS & MAINTENANCE INCLUDING PARAPET REPLACEMENT AT ROOF LEVEL. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.
On file for this project
7 documents · 1 drawing sheet
PenthouseAkam Associates, INC.Under Construction2p · 1 filing · 7 docs
Architecture
EXTERIOR FACADE REPAIRS & MAINTENANCE INCLUDING PARAPET REPLACEMENT AT ROOF LEVEL. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.
On file for this project
7 documents · 2 drawing sheets
Floor 14Unit 14DS, Unit 14ES, Unit 14KNUnder Construction3 filings · 16 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
INTERIOR MINOR ALTERATION IN UNIT 14DS/14ES, PLUMBING FILED IN SUBSEQUENT APPLICATION. NO CHANGE TO BULK, USE, OCCUPANCY, OR EGRESS.
On file for this project
4 documents
RENOVATION OF EXISTING APT. 14KN TO INCLUDE MINOR PARTITION WORK, REPLACING DROP CEILINGS, ENLARGING KITCHEN ENTRY, NEW LIGHTING, FIXTURES & FINISHES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. PLUMBING WORK UNDER SUBSEQUENT APPLICATION.
On file for this project
8 documents
FILING HEREWITH DRAWINGS TO PROPOSE PLUMBING WORK INCONJUNCTION TO INTERIOR RENOVATION OF EXISTING APARTMENT # 14AN. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EXISTS OR OCCUPANCY.
On file for this project
4 documents
Floor 13
Floor 12Unit 12E, Unit 12BN, Unit 12KS2p · 4 filings · 20 docs
ArchitectureDMEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
INSTALL AND REPLACE PLUMING FIXTURES IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APT 12KS ON THE 12 FLOOR FILED UNDER APPLICATION M00620636. no change in use egress or occupancy .
On file for this project
8 documents
MINOR PARTITION WORK AND FINISHES IN APT#12-KS ON 12TH FLOOR, ALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (Plumbing filed under application M00621443-I1)
On file for this project
9 documents
INTERIOR ALTERATIONS TO APT 12BN. REMOVAL OF NON-BEARING WALL. INSTALL NEW NON-BEARING WALL, DOOR AND FRAME PER PLANS. NO CHANGES TO THE BUILDING'S USE, HEIGHT OR EGRESS.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 11Unit 11S, Unit 11SN1 filing · 20 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
replace existing plumbing fixtures, install new gas range
On file for this project
32 documents
Floor 10
Floor 9Unit 9J, Unit 9EN, Unit 9KN +1Under Construction9p · 4 filings · 20 docs
ArchitectureEquipmentFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Project M01342814Permit Issued · 01/27/2026
Plumbing modifications taking place on the 9th floor (9KN) as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
9 drawing sheets
Project M01342794Permit Issued · 01/26/2026
Architectural modifications taking place on the 9th floor (9KN) as per plans filed herewith. No change in use, egress or occupancy.
PROPOSED INTERIOR RENOVATION OF UNIT 9EN AS PER PLANS, NO CHANGE TO USE EGRESS OR OCCUPANCY.
On file for this project
31 documents
Latest 3 of 4 filings on this floor.
Floor 8Unit 8L, Unit 8S, Unit 8CS +31p · 2 filings · 20 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
KITCHEN AND BATHROOM RENOVATION OF COMBINED UNITS 8LS, 8MS AND 8NS PER TPPN 3/97. PLUMBING WORK FILED IN CONJUNCTION WITH GENERAL CONSTRUCTION.
On file for this project
12 documents
HEREBY FILING FOR THE REPLACEMENT, REMOVAL AND INSTALLATION OF PLUMBING FIXTURES IN APARTMENT 8CS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this project
9 documents · 1 drawing sheet
Floor 7
Floor 6
Floor 5Unit 5MN2p · 2 filings · 12 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
This alteration is being filed for a renovation in apartment 5MN. Work to include the renovation of 3 bathrooms. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
This alteration is being filed for plumbing work in conjunction with GC application #M00760886. Work to include removal and installation of bathroom fixtures. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 4Unit 4RN, Unit 4SS, Unit 4TN4 filings · 20 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Interior pluming work in apartment 4TN , no change in use, egress or occupancy.
On file for this project
4 documents
Interior renovation of apartment 4TN on the 4th floor, no change in use, egress or occupancy.
On file for this project
8 documents
REPLACE PLUMBING FIXTURES IN BATHROOM AND KITCHEN
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 3Unit 3ABSUnder Construction1p · 1 filing · 10 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Supported Scaffold
Modifications to bathroom and closet at apartment 3ABS
On file for this project
10 documents · 1 drawing sheet
Floor 2Interior renovation with plumbing and bathroom work1p · 1 filing · 19 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents · 1 drawing sheet
Floor 1Unit 1DS, Unit 1GHNUnder Construction4 filings · 20 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES AT APARTMENT 1DS ON THE FIRST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
THIS PROJECT ENTAILS ALTERATIONS TO THE EXISTING HUNG CEILING, RAISING A FLOOR LEVEL, NEW FLOORING, PARTITIONS, WALL PANELING, FINISHES AND INSTALLATION OF NEW FLOOR, WORK INCLUDES STRUCTURAL. NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this project
9 documents
Filing herewith drawings indicating modification to existing plumbing system to 1st Floor - apartment #1GHN. No change in use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 4 filings on this floor.
Site & exteriorAkam Associates, INC.Under Construction4 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD TOP OF T HE SIDEWALK SHED FRONT OF THE BUILDING AT WEST 16TH STREET ELEVATION.
On file for this project
15 documents · 6 drawing sheets
EXTERIOR FACADE REPAIRS & MAINTENANCE INCLUDING PARAPET REPLACEMENT AT ROOF LEVEL. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.
On file for this project
7 documents · 12 drawing sheets
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.