← Back
BuildNYC
Elevator cooperative
Murray Hill Mews
160 EAST 38TH STREET · BIN 1019099
💬 Discuss this project
1975Year Built
35Stories
D4Building Class
C1-9Zoning
329,706 sfGross Floor Area
272Units
LL97 CoveredRent Stabilized10 Active Violations 8 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: Murray Hill Mews Owners · 25,527 sf lot · 12.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof333 Tenants CORP.Under Construction14p · 5 filings · 20 docs
Floor 34Unit 34H1p · 1 filing · 3 docs
Floor 33
Floor 32
Floor 31
Floor 30Unit 30B1p · 1 filing · 9 docs
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23Unit 23F2p · 1 filing · 5 docs
Floor 22
Floor 21
Floor 20Unit 21GUnder Construction10p · 1 filing · 5 docs
Floor 19
Floor 18Unit 18C3p · 2 filings · 16 docs
Floor 17Unit 18E5p · 1 filing · 10 docs
Floor 16Unit 16E, Unit 16H13p · 3 filings · 20 docs
Floor 15Unit 15G, Unit 16H, Unit 16FG7p · 2 filings · 14 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Unit 8D1p · 1 filing · 3 docs
Floor 7Unit 7G4p · 1 filing · 17 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2New interior wall for flex storage room, 2nd floor1p · 1 filing · 3 docs
Floor 1Round M NYCUnder Construction14p · 5 filings · 20 docs
CellarAkam Associates, INC.Under Construction6p · 2 filings · 17 docs
Sub-CellarAkam Associates, INC.Under Construction3p · 1 filing · 6 docs
Site & exteriorSidewalk shed installation4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Murray Hill Mews Owners13803/22/2026
333 Tenants903/22/2026
Round M NYC903/22/2026
Rose Asso Inc Murray Hill Mews303/21/2026
Subotic203/21/2026
MHM Owners203/21/2026
Titan Outdoor103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aye Consulting Group1603/21/2026
Big Orange Expediting403/21/2026
Youber Design403/21/2026
SUN203/21/2026
KM Associates of New York903/21/2026
MP Design and Construction403/21/2026
Hlzae103/21/2026
Nexus Consulting NYC203/21/2026
Municipal Building Consultants103/21/2026
Maryclare Nepogoda103/21/2026
Top Out Consultants203/21/2026
Abcat Associates Inc Dba Wild Stone103/21/2026
Richard Lewis Architect103/21/2026
AE Design Solution203/21/2026
Codegreen103/21/2026
K & M Associates903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Freedom GSGeneral Contractor607/08/2026
Round M NYCGeneral Contractor603/21/2026
JBKS ConstructionGeneral Contractor607/08/2026
Pioneer General ConstructionGeneral Contractor303/21/2026
DA ConstructionGeneral Contractor303/21/2026
BG Construction NYGeneral Contractor303/21/2026
E D ElectricalElectrical203/22/2026
Accurate MechanicalPlumbing207/08/2026
Angelos's Home ImprovemenGeneral Contractor203/21/2026
Spire Scaffolding & HoistScaffold207/08/2026
CYC General ContractingGeneral Contractor107/08/2026
Lake ContractingGeneral Contractor104/09/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
All Pro Plumbing & HeatingPlumbing106/28/2026
Aqueduct MechanicalPlumbing107/08/2026
Ark-Pol PlumbingPlumbing107/08/2026
Budget Plumbing & HeatingPlumbing107/08/2026
Rock E Small Plumbing & HeatingPlumbing107/08/2026
Balance Electric Cont'gElectrical103/22/2026
Wasoff Plumbing & Utility CoPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Dudley JamalElectrical103/21/2026
McGuire ElectricalElectrical103/21/2026
Dudley & Associates Lic. ElectricElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
Y.S. ElectricElectrical103/21/2026
Abcat AssociatesGeneral Contractor107/08/2026
Big Apple Designs and EnvironmentalGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Madocks Architecture9127109/18/2026
George J. Xerakias, PE1658105/28/2026
Sustainable Design Engineering1404112/12/2025
Glickman Schlesinger Architects6768910/07/2025
International Geotehcnica1795109/11/2025
Inm Architect3351106/19/2025
Crosscheck Inspection Services544105/02/2025
Outsource Special Inspection2827204/01/2025
A&B World Consulting5704101/06/2025
Ayala Engineering9207201/06/2025
Hamann Engineering4949309/21/2024
Howard L Zimmerman Architects1712108/15/2024
Concessi Engineering540112/18/2023
Constant and Brown Engineering7565601/18/2023
SI Design6486212/02/2022
Edward F Zevallos Architects1025111/09/2020
Building Lifecycle
All (231)Filed (42)Permit Issued (31)Signed Off (18)Facade (FISP) (15)Violation (60)Inspection (19)Objection (16)Special Inspection (30)
09/21/2026
Objection raised — Other
09/21/2026
Objection raised — Other
09/21/2026
Objection raised — Other
09/21/2026
Objection raised — Cost
09/18/2026
Filed — Alteration
Modification of guardrails at roof, as per plans filed herewith. No change in use, egress, or occupancy.
M01429881-I1
09/18/2026
Special inspection requirement — Post-installed Anchors
EDWARD MADOCKS
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWARD MADOCKS
07/13/2026
Special inspection requirement — Final
EDWARD MADOCKS
06/08/2026
Permit issued — Suspended Scaffold
M01407200-I1-SC
05/28/2026
Filed — Alteration
Installation of suspended scaffold for facade repair & inspection.
M01407200-I1
05/26/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
05/26/2026
Special inspection requirement — Post-installed anchors in masonry
George Xerakias
05/26/2026
Special inspection requirement — Post-installed Anchors
George Xerakias
04/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2026
Permit issued — Structural
M01082034-I1-GC-CX
03/26/2026
Signed off — Alteration
NO CHANGE TO USE, EGRESS, OR EXISTING CERTIFICATE OF OCCUPANCY. NO CHANGE TO BUILDING ENVELOPE OR ZONING. WORK TO INCLUDE PARTIAL NON-STRUCTURAL DEMOLITION, NEW PARTITIONS, NEW DOORS, electrical, AND REPLACEMENT OF EXISTING MILLWORK.
M01259987-I1
02/06/2026
Permit issued — Plumbing
M01309701-S1-PL
02/05/2026
Permit issued — General Construction
M01309701-I1-GC
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
12/31/2025
Objection raised — Energy
12/31/2025
Objection raised — Scope
12/31/2025
Objection raised — Structural
12/12/2025
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 21G ON THE 20TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW WOOD FLOORING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01309701-S1
12/12/2025
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 21G ON THE 20TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW WOOD FLOORING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01309701-I1
11/26/2025
Permit issued — General Construction
M01259987-I1-GC
11/17/2025
Signed off — Alteration
Additions/Modifications to existing plumbing in apartment 18C as per plans herewith. No change to use, egress, or occupancy.
M01076205-S1
11/17/2025
Signed off — Alteration
Replacement and additions of plumbing fixtures throughout, replacing gas range, and new washer. No change to use, egress, or occupancy.
M01107576-S1
11/10/2025
Signed off — Alteration
CONSTRUCT INTERIOR PARTITIONS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE INUSE, EGRESS OR OCCUPANCY.
M01237834-I1
10/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2025
Permit issued — General Construction
M01242064-I1-GC
10/16/2025
Filed — Alteration
Interior renovation of existing commercial space (eating and drinking establishment). Partition, plumbing, mechanical and finish work as per plan. No change in use, occupancy or egress.
M01242064-S1
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adam Glickman
10/07/2025
Filed — Alteration
Replacement and additions of plumbing fixtures throughout, replacing gas range, and new washer. No change to use, egress, or occupancy.
M01107576-P2
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adam Glickman
10/01/2025
Violation issued (ECB, open)
Construction
09/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/11/2025
Filed — Alteration
NO CHANGE TO USE, EGRESS, OR EXISTING CERTIFICATE OF OCCUPANCY. NO CHANGE TO BUILDING ENVELOPE OR ZONING. WORK TO INCLUDE PARTIAL NON-STRUCTURAL DEMOLITION, NEW PARTITIONS, NEW DOORS, electrical, AND REPLACEMENT OF EXISTING MILLWORK.
M01259987-I1
09/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2025
Signed off — Alteration
Interior renovations to apartment 18C as per plans herewith. No change to use, egress, or occupancy.
M01216474-I1
08/12/2025
Filed — Alteration
Additions/Modifications to existing plumbing in apartment 18C as per plans herewith. No change to use, egress, or occupancy.
M01076205-P1
08/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adam Glickman
07/11/2025
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF EXIST. STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01160402-I1
07/09/2025
Permit issued — General Construction
M01237834-I1-GC
07/08/2025
Permit issued — General Construction
M01242064-I1-GC
06/19/2025
Filed — Alteration
Interior renovation of existing commercial space (eating and drinking establishment). Partition, plumbing, mechanical and finish work as per plan. No change in use, occupancy or egress.
M01242064-I1
06/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nikola Martinovic
06/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2025
Filed — Alteration
CONSTRUCT INTERIOR PARTITIONS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE INUSE, EGRESS OR OCCUPANCY.
M01237834-I1
06/16/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/16/2025
Special inspection requirement — Final
Nikola Martinovic
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
06/09/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/06/2025
Special inspection requirement — Final
Chia-Yi Huang
06/03/2025
Violation issued (ECB, closed)
Construction
05/30/2025
Permit issued — Plumbing
M01160402-S1-PL
05/16/2025
Permit issued — General Construction
M01216474-I1-GC
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedCanido Basonas Construction06/08/2026
DOB NOWStructuralPermit IssuedLake Contracting04/07/2026
DOB NOWPlumbingPermit IssuedBudget Plumbing & Heating02/06/2026
DOB NOWGeneral ConstructionPermit IssuedBig Apple Designs and Environmental02/05/2026
DOB NOWGeneral ConstructionSigned-offJBKS Construction11/26/2025
DOB NOWGeneral ConstructionPermit IssuedRound M NYC10/24/2025
DOB NOWGeneral ConstructionSigned-offAbcat Associates07/09/2025
DOB NOWGeneral ConstructionPermit IssuedRound M NYC07/08/2025
DOB NOWPlumbingPermit IssuedAll Pro Plumbing & Heating05/30/2025
DOB NOWGeneral ConstructionSigned-offFreedom GS05/16/2025
DOB NOWMechanical SystemsSigned-offBG Construction NY01/21/2025
DOB NOWPlumbingSigned-offAnthony Disabato11/13/2024
DOB NOWGeneral ConstructionSigned-offFreedom GS11/08/2024
DOB NOWGeneral ConstructionSigned-offFreedom GS10/29/2024
DOB NOWGeneral ConstructionSigned-offJBKS Construction10/21/2024
DOB NOWPlumbingSigned-offArk-Pol Plumbing09/26/2024
DOB NOWPlumbingSigned-offAnthony Disabato08/27/2024
DOB NOWGeneral ConstructionSigned-offFreedom GS08/14/2024
DOB NOWGeneral ConstructionSigned-offJBKS Construction04/26/2024
DOB NOWMechanical SystemsPermit IssuedPioneer General Construction01/17/2024
DOB NOWPlumbingPermit IssuedAdvanced Plumbing Mechanical12/14/2022
DOB NOWGeneral ConstructionPermit IssuedDA Construction11/30/2022
DOB NOWGeneral ConstructionSigned-offJBKS Construction11/03/2022
DOB NOWGeneral ConstructionSigned-offFreedom GS08/18/2022
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating07/12/2022
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co12/17/2021
DOB NOWGeneral ConstructionSigned-offCYC General Contracting12/03/2021
DOB NOWGeneral ConstructionSigned-offAngeloss Home Improvemen03/15/2021
DOB NOWPlumbingSigned-offAqueduct Mechanical12/04/2020
DOB NOWSidewalk ShedSigned-offSpire Scaffolding & Hoist04/18/2019
DOB NOWSidewalk ShedSigned-offSpire Scaffolding & Hoist08/29/2018
BISOTISSUEDEddy's General Construction12/18/2020
BISOTISSUEDJBKS Construction02/25/2020
BISOTISSUEDCanido Basonas Construction Service04/10/2019
BISPLISSUEDTrue North Mechanical03/20/2019
BISOTISSUEDJBKS Construction02/19/2019
BISPLISSUEDArk-Pol Plumbing10/12/2018
BISOTISSUEDCanido Basonas Construction Service09/24/2018
BISPLISSUEDPremier Flow Plumbing and Heating08/15/2018
BISOTISSUEDS. Zezula Renovation07/30/2018
+ 41 more permits on file
2 projects · most recent 01/06/2025
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/06/2025Signed-offBG Construction NYVentilation Systems
Ventilation
Dayton 56jn93 4,000 CFM · Exhaust Fan ×1
12/18/2023Permit IssuedPioneer General ConstructionHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-24MASTWM-230VI 24,000 BTU · Split System ×1
CH-HPR24-230VO 24,000 BTU · Heat Pump Outdoor ×1
CHV-15WTU 15,400 BTU · Ptac ×1
CHV-18WTU 19,100 BTU · Ptac ×1
CHV6-36URBM 36,000 BTU · Vrf Outdoor ×1
5 projects · most recent 10/16/2025
Water/Sanitary Gas
FiledStatusContractorScope
10/16/2025——Gas, Water/Sanitary
04/01/2025——Water/Sanitary
01/06/2025Permit IssuedAll Pro Plumbing & HeatingWater/Sanitary
12/18/2023——Water/Sanitary
12/02/2022Permit IssuedAdvanced P, Mechanical & SprinklerGas, Water/Sanitary
17 projects · most recent 01/21/2026
General Wiring Lighting
FiledStatusContractorScope
01/21/2026Permit IssuedEmpire Lic Electrical ContractorsGeneral Wiring
10/07/2025Permit IssuedSNB Electrical ContngGeneral Wiring
07/31/2025CompleteAL-Lectric Elect'l ContractingGeneral Wiring
07/11/2025CompleteE D ElectricalGeneral Wiring
07/07/2025Permit IssuedAccurate ElectricalGeneral Wiring
06/16/2025Permit IssuedAccurate ElectricalGeneral Wiring
05/31/2024CompleteLina ElectricGeneral Wiring
01/20/2024CompleteTriple D ElectricGeneral Wiring
03/08/2023Permit IssuedAnother Nycer ElectricGeneral Wiring
05/12/2022CompleteKJK ElectricGeneral Wiring
05/02/2022CompleteAmsterdam ElectricGeneral Wiring
05/03/2021Permit IssuedP.S. Marcato Elev. Co—
01/16/2019CompleteBalance Electric Cont'gGeneral Wiring
08/24/2018CompleteTop Shelf Electric—
08/01/2018CompleteGlendale Electl ContngGeneral Wiring, Lighting
1 project · most recent 08/15/2024
FiledStatusContractorScope
08/15/2024Permit IssuedLake Contracting1 scope_items
1 project · most recent 05/28/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/28/2026Permit IssuedCanido Basonas ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
04/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
09/18/2026Post-installed AnchorsEDWARD MADOCKSspecial
07/28/2026Tenant Protection Plan ComplianceEDWARD MADOCKSspecial
07/13/2026FinalEDWARD MADOCKSprogress
05/26/2026Post-installed AnchorsGeorge Xerakiasspecial
05/26/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
05/26/2026Post-installed anchors in masonryGeorge Xerakiasspecial
10/08/2025Fire-Resistant Penetrations and JointsAdam Glickmanspecial
10/03/2025Fire-Resistant Penetrations and JointsAdam Glickmanspecial
08/08/2025Tenant Protection Plan Compliance—special
08/05/2025Fire-Resistant Penetrations and JointsAdam Glickmanspecial
06/19/2025Tenant Protection Plan ComplianceNikola Martinovicspecial
06/16/2025Fire-Resistant Penetrations and JointsNikola Martinovicspecial
06/16/2025FinalNikola Martinovicprogress
06/06/2025FinalChia-Yi Huangprogress
05/02/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
04/25/2025Lighting in dwelling unitsLauren Schlesingerenergy_progress
04/25/2025Lighting controlsLauren Schlesingerenergy_progress
04/25/2025Fire-Resistance Rated ConstructionLauren Schlesingerprogress
04/25/2025Energy Code Compliance InspectionsLauren Schlesingerprogress
04/25/2025FinalLauren Schlesingerprogress
04/25/2025Fire-Resistant Penetrations and JointsLauren Schlesingerspecial
03/26/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
03/26/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
01/27/2025Interior lighting powerDavid Jimenezenergy_progress
01/27/2025Lighting controlsDavid Jimenezenergy_progress
Latest 25 of 78.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Round M NYCRestaurant / Food ServiceSub-cellar, Cellar, Floor 1
Project M01242064 Alteration · Permit Entire · 06/19/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,096 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch40
10/04/2026M01429881-I1Request digital key ↗
09/06/2026M00071896-I1Request digital key ↗
09/02/2026M00631552-P2Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00465885-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00400218-I1Request digital key ↗
▸Applications & Permits185
▸BISPLAN / WORK APPROVAL APPLICATION97
07/30/2024100292602Open ↗
07/26/2024123302327Open ↗
02/15/2024122565964Open ↗
Showing 3 of 97 on file for this type
▸BISWORK PERMIT APPLICATION81
02/28/2020123888463Open ↗
08/16/2019123432286Open ↗
08/16/2019123432286Open ↗
Showing 3 of 81 on file for this type
▸BISPLACE OF ASSEMBLY6
06/16/2021120608360Open ↗
06/09/2021120608360Open ↗
Showing 2 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/25/2024122565964Open ↗
▸Seals & Professional Certifications248
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION98
03/19/2020123432286Open ↗
01/03/2020123432286Open ↗
01/03/2020123432286Open ↗
Showing 3 of 98 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
10/04/2026M01429881-I1Open ↗
09/04/2026M00400218-I1Open ↗
09/02/2026M00631552-P2Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
10/04/2026M01429881-I1Open ↗
10/04/2026M01429881-I1Open ↗
09/17/2026M01082034-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
10/04/2026M01429881-I1Open ↗
09/17/2026M01082034-I1Open ↗
09/01/2026M01107576-P1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST19
05/21/2019123849292Open ↗
05/15/2019123849292Open ↗
05/09/2019123849292Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/13/2018140802610Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/10/2020140955642Open ↗
Showing 1 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
11/10/2020140955642Open ↗
Showing 1 of 3 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment81
▸BISSELF-CERT PLUMBING NOTICE32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
07/10/2019123849292Open ↗
07/09/2019123849292Open ↗
07/01/2019123849292Open ↗
Showing 3 of 21 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes15
12/13/2019123888463Open ↗
10/03/2019123888463Open ↗
03/01/2019123849292Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWTenant Protection Plan1
09/04/2026M00400218-I1Open ↗
▸Environmental & Asbestos81
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
09/04/2026M00400218-I1Open ↗
09/02/2026M00631552-I1Open ↗
09/02/2026M00631552-P2Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)30
11/10/2020140955642Open ↗
10/03/2019123888463Open ↗
02/28/2019123849292Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/22/2026M01076205-S1Open ↗
08/22/2026M01076205-I1Open ↗
08/13/2026M01107576-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance101
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS47
01/03/2020123432286Open ↗
10/22/2019123228872Open ↗
10/03/2019123888463Open ↗
Showing 3 of 47 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS26
12/28/2023123132564Open ↗
12/27/2023123132564Open ↗
07/11/2023140955642Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
12/12/2024123302327Open ↗
02/13/2024122565964Open ↗
12/27/2023123132564Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLIGHTING IN DWELLING UNITS3
12/12/2024123302327Open ↗
02/15/2024122565964Open ↗
07/11/2023140955642Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/10/2020140955642Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/12/2024123302327Open ↗
02/15/2024122565964Open ↗
07/11/2023140955642Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
02/15/2024122565964Open ↗
07/11/2023140955642Open ↗
▸BISINTERIOR LIGHTING POWER1
12/12/2024123302327Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY19
12/12/2024123302327Open ↗
02/13/2024122565964Open ↗
12/27/2023123132564Open ↗
Showing 3 of 19 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/15/2024122565964Open ↗
06/23/2023140955642Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
03/02/2023104009751Open ↗
▸Approvals, Objections & Sign-offs93
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST56
12/13/2024123302327Open ↗
03/25/2024122565964Open ↗
12/28/2023123132564Open ↗
Showing 3 of 56 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISFINAL2
12/12/2024123302327Open ↗
07/11/2023140955642Open ↗
▸BISSUPERSEDING LETTER2
08/16/2019123432286Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership84
▸BISCOST AFFIDAVIT76
12/28/2023123132564Open ↗
11/10/2020140955642Open ↗
08/31/2020123849292Open ↗
Showing 3 of 76 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
12/12/2024123302327Open ↗
02/16/2024122565964Open ↗
06/27/2023140955642Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms112
▸BISEFILING COVER SHEET36
10/03/2019123888463Open ↗
02/28/2019123849292Open ↗
Showing 2 of 36 on file for this type
▸BISADDITIONAL INFORMATION35
11/09/2021101301173Open ↗
07/14/2021120608360Open ↗
07/09/2021120608360Open ↗
Showing 3 of 35 on file for this type
▸BISBOROUGH INTAKE FORM32
02/20/2020101301173Open ↗
01/03/2020123432286Open ↗
11/27/2019101301173Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
11/10/2020140955642Open ↗
Showing 1 of 9 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
11/14/2023123132564Open ↗
10/04/2023123132564Open ↗
08/09/2021103396674Open ↗
Showing 3 of 9 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBSA VARIANCE2
12/27/2021101301173Open ↗
12/27/2021101301173Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
08/26/2026M01082034-I1Open ↗
▸DOB NOWCalculations1
08/17/2026M01407200-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/17/2026M01407200-I1Open ↗