← Back
Elevator apt, semi-fireproof with stores
163-05 ARCHER AVENUE
QUEENS · BIN 4623723
💬 Discuss this project
2021Year Built
25Stories
D7Building Class
C6-3Zoning
535,495 sfGross Floor Area
606Units
LL97 CoveredRent Stabilized14 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: ARCHER TOWERS PHASE I DEVELOPMENT LLC · 53,348 sf lot · 10.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof38p · 11 filings · 20 docs
Bulkhead7p · 3 filings · 20 docs
Floor 256p · 5 filings · 20 docs
Floor 2435p · 6 filings · 20 docs
Floor 2333p · 5 filings · 20 docs
Floor 2234p · 5 filings · 20 docs
Floor 2135p · 5 filings · 20 docs
Floor 2035p · 5 filings · 20 docs
Floor 1935p · 5 filings · 20 docs
Floor 1835p · 5 filings · 20 docs
Floor 1734p · 4 filings · 20 docs
Floor 1634p · 4 filings · 20 docs
Floor 1534p · 4 filings · 20 docs
Floor 1434p · 4 filings · 20 docs
Floor 1334p · 4 filings · 20 docs
Floor 1235p · 5 filings · 20 docs
Floor 1136p · 5 filings · 20 docs
Floor 1037p · 5 filings · 20 docs
Floor 935p · 4 filings · 20 docs
Floor 835p · 4 filings · 20 docs
Floor 735p · 4 filings · 20 docs
Floor 635p · 4 filings · 20 docs
Floor 537p · 5 filings · 20 docs
Floor 435p · 5 filings · 20 docs
Floor 336p · 5 filings · 20 docs
Floor 239p · 6 filings · 20 docs
Floor 153p · 14 filings · 20 docs
Cellar36p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRP DEVELOPMENT17409/24/2026
OWNERS REP2007/08/2026
BRP CONSTRUCTION GROUP607/08/2026
WALSH GLASS AND METAL1303/22/2026
ARCHER TOWERS PHASE I DEVELOPMENT LLC103/22/2026
SKYCORE BUILDERS603/22/2026
SKYCORE BUILDINGS INC103/22/2026
GERTZ PLAZA ACQUISITION303/21/2026
JAMAICA TOWER403/21/2026
ARCHER TOWER DEVELOPMENT LLC1303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/11/2018$20.0M—JAMAICA PROPERTY HOLDIINGS LLC → ARCHER TOWERS DEVELOPMENT LLC— not available
09/23/2014$11.0M—GERTZ PLAZA ACQUISITION 5, LLC → JAMAICA TOWER, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1907/08/2026
SKYCORE BUILDERS, INCGeneral Contractor1307/08/2026
ASPRO PLUMBING INCPlumbing907/08/2026
PACE PLUMBING CORPFire Protection807/08/2026
WALSH GLASS & METAL INCGeneral Contractor603/21/2026
METFLOW FIRE CONTROL LLCFire Protection507/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor304/09/2026
CARLYLE CONSTRUCTION COGeneral Contractor207/08/2026
HORSEPOWER ELECTRIC.&Electrical203/22/2026
HM BUILD AND UPLIFT CORPGeneral Contractor207/08/2026
L S SIGNScaffold207/08/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
SIGNSTAR NYCScaffold107/08/2026
SANT-TEC ELECTRIC INCElectrical103/22/2026
ARCO PLBG AND HTG INCFire Protection108/12/2026
EXPERT FIRE SPRINKLER,LLCFire Protection107/08/2026
HIGHBURY CONCRETE, INCGeneral Contractor107/08/2026
URBAN CONSTR & DESIGN LLCGeneral Contractor104/09/2026
ANAKTORA MECHANICAL LLCPlumbing109/24/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
FULTON PLBG & HTG CORPPlumbing107/08/2026
G.M.A. PLUMBING & HEATINGPlumbing107/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
ADAM ELECL CONTRNG LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344407/31/2026
METRIC CONSULTING AND INS1803707/17/2026
MCHENERY TESTING LAB9181304/01/2026
IKRA CONSULTING LLC7032401/26/2026
AA BUILDING & INSPECTION1519301/26/2026
CNY ENGINEERING P.C3304102/26/2025
AM DESIGN STUDIO LLC4413301/28/2025
DOMANI INSPECTION SERVICE8432001/17/2025
PCS ENGINEERING3745410/02/2023
KENDALL ENGINEERING PC4154111/04/2022
Building Lifecycle
All (300)Filed (63)Permit Issued (61)Signed Off (29)Violation (40)Inspection (42)Objection (35)Special Inspection (30)
09/23/2026
Permit issued — Plumbing
Q01379624-S1-PL
08/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/21/2026
Signed off — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-S1
08/21/2026
Signed off — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-S2
08/21/2026
Signed off — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-S3
08/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/11/2026
Permit issued — Sprinklers
Q01334951-I1-EW-SP
07/31/2026
Filed — Alteration
Installation of Sanitary private line for adjacent lot. DEP Site connection and civil misc. work on grade.
Q01379624-I1
07/31/2026
Filed — Alteration
Installation of Sanitary private line for adjacent lot. DEP Site connection and civil misc. work on grade.
Q01379624-S1
07/17/2026
Filed — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-P4
07/17/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
07/01/2026
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/25/2026
Filed — Alteration
Q01334951-P1
06/18/2026
Violation issued (HPD, open)
B
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/16/2026
Special inspection requirement — Sprinkler Systems
06/15/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
SAMI HAJJAR P.E
06/14/2026
Violation issued (HPD, open)
C
05/14/2026
Violation issued (HPD, open)
A
05/14/2026
Violation issued (HPD, open)
A
05/11/2026
Signed off — Alteration
FLING PLUMBING WORK FOR THE RETAIL SPACE "A" COMMERCIAL GAS EQUIPMENTS FOR COOKING, SINKS AND RELATED PIPING IN CONJUNCTION WITH APPLICATION NB # 420666176 AND LAT # Q01159331
Q01159849-I1
05/11/2026
Signed off — Alteration
FILING FOR INTERIOR MODELING OF THE EXISTING RETAIL "A -HOUSE OF WINGS", CARPENTRY, MILL WORK AND FINISHING, COMMERCIAL HOOD INSTALLATION AND RELATED VENTILATION. IN CONJUNCTION WITH NB #420666176
Q01159331-I1
05/07/2026
Permit issued — Plumbing
Q01367472-S2-PL
05/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/30/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Q01181460-I1
04/30/2026
Permit issued — Suspended Scaffold
Q01181460-I1-SC
04/23/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/20/2026
Violation issued (HPD, closed)
C
04/07/2026
Permit issued — Mechanical Systems
Q01367472-S1-MS
04/07/2026
Permit issued — General Construction
Q01367472-I1-GC
04/06/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/06/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
MINA HANNA
04/01/2026
Filed — Alteration
Interior renovation to install new ductwork system and install a new hood system.
Q01367472-S1
03/27/2026
Special inspection requirement — Final
MINA HANNA
03/26/2026
Filed — Alteration
Interior renovation to install new ductwork system and install a new hood system.
Q01367472-S2
03/26/2026
Filed — Alteration
Interior renovation to install new ductwork system and install a new hood system.
Q01367472-I1
03/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedANAKTORA MECHANICAL LLC09/23/2026
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC08/11/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC05/07/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM04/30/2026
DOB NOWMechanical SystemsPermit IssuedJOHN EVAN CONTRACTING COR04/07/2026
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR04/07/2026
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING01/22/2026
DOB NOWSignSigned-offWEINFELD, ELLIOT01/09/2026
DOB NOWSignSigned-offWEINFELD, ELLIOT01/09/2026
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR10/23/2025
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC10/07/2025
DOB NOWPlumbingSigned-offFULTON PLBG & HTG CORP09/19/2025
DOB NOWMechanical SystemsSigned-offCARLYLE CONSTRUCTION CO09/09/2025
DOB NOWGeneral ConstructionSigned-offCARLYLE CONSTRUCTION CO07/21/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC05/02/2025
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC04/16/2025
DOB NOWMechanical SystemsSigned-offURBAN CONSTR & DESIGN LLC04/14/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM02/24/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/13/2025
DOB NOWMechanical SystemsSigned-offHM BUILD UPLIFT02/10/2025
DOB NOWGeneral ConstructionSigned-offHM BUILD UPLIFT02/07/2025
DOB NOWSignSigned-offSIGNSTAR NYC01/31/2025
DOB NOWSignSigned-offMAD SIGNS INC10/24/2024
DOB NOWPlumbingSigned-offASPRO PLUMBING INC06/21/2024
DOB NOWGeneral ConstructionSigned-offSKYCORE BUILDERS, INC06/21/2024
DOB NOWEarth WorkSigned-offSKYCORE BUILDERS, INC05/23/2024
DOB NOWStandpipeSigned-offMANENGEERING BUREAU, INC04/01/2024
DOB NOWGeneral ConstructionSigned-offSKYCORE BUILDERS, INC03/28/2024
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC01/25/2024
DOB NOWPlumbingSigned-offASPRO PLUMBING INC09/18/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC09/15/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedWALSH GLASS & METAL INC07/06/2023
DOB NOWBoiler EquipmentSigned-offASPRO PLUMBING INC06/20/2023
DOB NOWPlumbingSigned-offASPRO PLUMBING INC06/20/2023
DOB NOWPlumbingSigned-offASPRO PLUMBING INC05/23/2023
DOB NOWBoiler EquipmentSigned-offASPRO PLUMBING INC04/28/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/07/2023
DOB NOWSprinklersSigned-offMANENGEERING BUREAU, INC04/01/2023
DOB NOWSprinklersSigned-offMANENGEERING BUREAU, INC03/30/2023
DOB NOWStandpipeSigned-offMANENGEERING BUREAU, INC03/30/2023
+ 39 more permits on file
3 projects · most recent 07/17/2026
Heating and Air Conditioning Systems Others Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026Signed-offCARLYLE CONSTRUCTION COHeating and Air Conditioning Systems, Others
Heat / Cool
Daikin W.SC.H.030.F.1.F.LE.C.B 35,300 BTU · Heat Pump Outdoor ×2
W.SC.H.019.E.1.F.LE.C.B 24,100 BTU · Heat Pump Outdoor ×1
W.SC.H.036.F.1.F.LE.C.B 34,500 BTU · Heat Pump Outdoor ×1
Climatemaster WSCH030 35,300 BTU · Heat Pump Outdoor ×4
WSCH019 24,100 BTU · Heat Pump Outdoor ×2
WSCH036 34,500 BTU · Heat Pump Outdoor ×2
Other
Daikin VAM470GVJU 390 CFM · Erv ×3
Loren Cook GC-146 75 CFM · Exhaust Fan ×3
04/01/2026Permit IssuedJOHN EVAN CONTRACTING CORVentilation Systems—
05/02/2024Signed-offSKYCORE BUILDERS, INCAir Conditioning Systems, Heating Systems
Cooling
— GZS02B2XLM4BSSHSA0VBA0ASA1S 930 CFM ×1
Daikin WCCW5024 930 CFM · Chiller ×24
WCCW5036 1,390 CFM · Wshp ×24
WCCW2096 3,200 CFM · Chiller ×18
WCCW5070 1,900 CFM · Wshp ×18
RZR48TAVJU 49,000 BTU · Vrf Outdoor ×12
WCCW4015 430 CFM · Wshp ×12
WCCW5019 630 CFM · Heat Pump Outdoor ×12
DPS025A 5,500 CFM · Erv ×6
DPSA052 14,500 CFM · Erv ×6
WCCW2072 2,000 CFM ×6
WCCW2120 3,800 CFM · Chiller ×6
WCCW5042 1,230 CFM · Chiller ×6
York J18ZFC00P2B1BCA3E1 5,200 CFM ×6
ZT061E20P2B2BCA3A1 1,300 CFM · Rooftop Unit ×6
Baltimore Aircoil S3E-1222-07Q 159,860 CFM · Cooling Tower ×6
Heating
Aerco BMK-6000 600,000 BTU · Boiler ×24
1 project · most recent 07/17/2026
FiledStatusContractorScope
07/17/2026Signed-offMETFLOW FIRE CONTROL LLC22 heads
5 projects · most recent 07/31/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/31/2026Permit IssuedANAKTORA MECHANICAL LLCWater/Sanitary
07/17/2026Signed-offFULTON PLBG & HTG CORPWater/Sanitary
04/01/2026Permit IssuedALL PRO PLBG & HTG INCWater/Sanitary
02/10/2026Signed-offZARA PLUMBING CORPWater/Sanitary
01/06/2025Signed-offALL PRO PLBG & HTG INCGas, Water/Sanitary
12 projects · most recent 06/10/2026
General Wiring
FiledStatusContractorScope
06/10/2026Permit IssuedLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
05/11/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
01/29/2026Permit IssuedLIVE WIRE ELECTRIC 1 LLC6 meters, 4 new_meters
01/21/2026CompleteADAM ELECL CONTRNG LLC—
05/12/2025Pending PaymentSANT-TEC ELECTRIC INCGeneral Wiring
03/03/2025CompleteFIRST QUALITY ELECL LLCGeneral Wiring
02/05/2025CompletePROFF ELECTRICAL LLC—
01/09/2024CompleteTUXEDO ELEC'L CONTR'G INC—
12/05/2023Permit IssuedHORSEPOWER ELECTRIC.&General Wiring
01/25/2022CompleteTUXEDO ELEC'L CONTR'G INC—
10/21/2021CompleteV. VASS ELECTRIC CORP—
10/01/2021CompleteV. VASS ELECTRIC CORP—
2 projects · most recent 07/31/2026
Concrete
FiledStatusContractorScope
07/31/2026Permit IssuedANAKTORA MECHANICAL LLC2 scope_items
10/04/2022Permit IssuedSKYCORE BUILDERS, INCConcrete
1 project · most recent 07/17/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/17/2026Signed-offMETFLOW FIRE CONTROL LLCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 43
DateTypeResultReport
08/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2025Pass-Final Sign Permit InspectionPassView ↗
Latest 25 of 43.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/17/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
07/17/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
07/17/2026Mechanical SystemsSAMI HAJJAR P.Especial
07/17/2026FinalSAMI HAJJAR P.Eprogress
07/17/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/17/2026Duct leakage testing, insulation and designSAMI HAJJAR P.Eenergy_progress
07/17/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/17/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
07/17/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
07/17/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
07/01/2026Tenant Protection Plan ComplianceYounes Abouyaalaspecial
07/01/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/01/2026Sprinkler SystemsYounes Abouyaalaspecial
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026Tenant Protection Plan Compliance—special
06/16/2026Sprinkler Systems—special
06/15/2026Tenant Protection Plan Compliance—special
06/15/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
06/15/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/15/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
06/15/2026Duct leakage testing, insulation and designSAMI HAJJAR P.Eenergy_progress
06/15/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
06/15/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
06/15/2026FinalSAMI HAJJAR P.Eprogress
06/15/2026Mechanical SystemsSAMI HAJJAR P.Especial
Latest 25 of 150.
▾Documents — 418 on file (BIS + DOB NOW)
▸Plans & Drawings81
▸DOB NOWPlans/Sketch52
08/27/2026Q00617459-I1Request digital key ↗
08/27/2026Q00617459-P1Request digital key ↗
08/27/2026Q00599385-P4Request digital key ↗
Showing 3 of 52 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
08/23/2026Q00222594-P2Request digital key ↗
08/23/2026Q00222594-P1Request digital key ↗
08/23/2026Q00222594-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/21/2026Q00221970-P5Request digital key ↗
08/21/2026Q00221970-P6Request digital key ↗
08/21/2026Q00221970-P7Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/23/2026Q00222594-P4Request digital key ↗
08/23/2026Q00222594-P2Request digital key ↗
08/23/2026Q00222594-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/25/2026Q00221962-P1Request digital key ↗
08/25/2026Q00221962-P2Request digital key ↗
08/25/2026Q00221962-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
08/28/2026Q00319764-I1Request digital key ↗
08/27/2026Q00471081-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/25/2026Q00221957-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut2
08/28/2026Q00219629-P1Request digital key ↗
08/28/2026Q00219629-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION10
01/27/2026440579241Open ↗
12/14/2023440579241Open ↗
09/14/2023440579241Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
10/20/2021440691805Open ↗
10/06/2021440690281Open ↗
10/06/2021440690263Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
09/21/2023440579241Open ↗
09/06/2023440579241Open ↗
01/15/2020440579241Open ↗
▸Seals & Professional Certifications205
▸DOB NOWDPL-1: Design Professional Seal & Signature75
08/28/2026Q00222600-I1Open ↗
08/28/2026Q00319764-I1Open ↗
08/28/2026Q00222617-I1Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWProgress Inspector Seal & Signature57
09/25/2026Q00993201-I1Open ↗
09/23/2026Q01185846-S1Open ↗
09/23/2026Q01185846-S1Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature54
09/23/2026Q01185846-S1Open ↗
09/23/2026Q08013874-I1Open ↗
09/23/2026Q01185846-S1Open ↗
Showing 3 of 54 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/31/2015421020978Open ↗
06/20/2015421020978Open ↗
05/02/2015421020978Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/02/2015421020978Open ↗
11/06/2014421044989Open ↗
▸BISProfessional and Owner Certification (POC3)1
05/02/2015421020978Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/15/2020440579241Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/11/2015421020978Open ↗
05/02/2015421020978Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/29/2015421020978Open ↗
▸Environmental & Asbestos60
▸DOB NOWOER: Notice to Proceed37
08/21/2026Q00221970-P5Open ↗
08/21/2026Q00221970-P6Open ↗
08/18/2026Q01159331-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWOER: Notice of Satisfaction14
08/21/2026Q01159849-I1Open ↗
08/18/2026Q01159331-I1Open ↗
Showing 2 of 14 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
05/24/2022440690263Open ↗
05/24/2022440690281Open ↗
05/18/2022440691805Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/02/2015421020978Open ↗
11/06/2014421044989Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/20/2015421020978Open ↗
11/06/2014421044989Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/25/2022440690263Open ↗
05/25/2022440690281Open ↗
05/23/2022440691805Open ↗
▸BISFINAL3
05/24/2022440690263Open ↗
05/24/2022440690281Open ↗
05/18/2022440691805Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/29/2020440579241Open ↗
09/29/2020440579241Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/02/2015421020978Open ↗
11/06/2014421044989Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT5
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
Showing 3 of 5 on file for this type
▸BISINSURANCE: WORKERS' COMPENSATION3
10/20/2021440691805Open ↗
10/06/2021440690281Open ↗
10/06/2021440690263Open ↗
▸BISINSURANCE: DISABILITY3
10/20/2021440691805Open ↗
10/06/2021440690281Open ↗
10/06/2021440690263Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW33
05/24/2022440690263Open ↗
05/24/2022440690281Open ↗
05/18/2022440691805Open ↗
▸BISINSURANCE: LIABILITY3
10/20/2021440691805Open ↗
10/06/2021440690281Open ↗
10/06/2021440690263Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION5
02/18/2026440579241Open ↗
01/04/2024440579241Open ↗
09/21/2023440579241Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
05/02/2015421020978Open ↗
11/06/2014421044989Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/15/2020440579241Open ↗
▸Other Documents5
▸BISBPP - SUPPORTING DOCUMENTATION1
01/04/2024440579241Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/21/2023440579241Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type