← Back
Over six families without stores
Crown Heights
1640 PARK PLACE · BIN 3036638
💬 Discuss this project
1915Year Built
4Stories
C1Building Class
R6Zoning
17,424 sfGross Floor Area
12Units
Rent Stabilized20 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 5,060 sf lot · 3.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 2 filings · 20 docs
Floor 21p · 1 filing · 6 docs
Floor 112p · 2 filings · 18 docs
Cellar7p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY607/08/2026
NYC PACT PRESERVATION PARTNERS303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC701/05/2026
SLM ARCHITECTURE, P.C.202/13/2025
VOLUME SPACE CONSULTING INC.212/13/2024
SOCOTEC, INC.204/25/2024
ASHRAF CORP103/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1803/21/2026
RYBAK DEVELOPMENT203/21/2026
KD DESIGNS103/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor307/08/2026
DUAL FUEL PLUBING & HTINGPlumbing307/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor303/21/2026
LIBERTY NY RESTORATION INGeneral Contractor207/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
A & E PLUMBING CORPPlumbing207/08/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031101/05/2026
Building Lifecycle
All (129)Filed (14)Permit Issued (14)Signed Off (7)Violation (59)Inspection (5)Special Inspection (30)
07/13/2026
Signed off — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918759-I1
05/22/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM
B00979424-I1
05/22/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00952122-I1
05/22/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00980588-I1
03/23/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00979883-I1
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00978828-I1
03/17/2026
Permit issued — General Construction
B00918759-I1-GC
02/13/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931075-I1
01/14/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/08/2026
Permit issued — Boiler Equipment
B00980588-I1-BE
01/05/2026
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00980588-P1
12/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/17/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
12/13/2025
Violation issued (HPD, open)
C
12/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
10/23/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
10/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
10/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
10/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
10/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/22/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00952122-P1
09/10/2025
Violation issued (ECB, closed)
Unknown
08/06/2025
Permit issued — General Construction
B00918759-I1-GC
07/16/2025
Permit issued — General Construction
B00931075-I1-GC
07/14/2025
Permit issued — Plumbing
B00978828-I1-PL
02/19/2025
Violation issued (HPD, open)
B
02/19/2025
Violation issued (HPD, open)
B
02/19/2025
Violation issued (HPD, open)
C
02/19/2025
Violation issued (HPD, open)
C
02/19/2025
Violation issued (HPD, open)
C
02/14/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/14/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
02/13/2025
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918759-P1
01/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/30/2024
Permit issued — Boiler Equipment
B00980588-I1-BE
12/30/2024
Permit issued — Mechanical Systems
B00979424-I1-MS
12/30/2024
Permit issued — Plumbing
B00952122-I1-PL
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2026
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING01/08/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC08/06/2025
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN07/16/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP07/14/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING12/30/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC12/30/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING12/30/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP10/01/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL09/30/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC09/18/2024
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP09/04/2024
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN08/15/2024
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC03/05/2024
1 project · most recent 12/24/2024
Heating Systems Others
FiledStatusContractorScopeMake / Model / Capacity
12/24/2024Signed-offDUAL FUEL COMPANY LLCHeating Systems, Others
Heating
Lochinvar KBX-1000 1,000,000 BTU · Boiler ×6
A.O. Smith A.O. SMITH BTH-199 199,000 BTU · Water Heater ×2
Other
N/A n/a 1 CFM ×8
1 project · most recent 10/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/22/2025Signed-offDUAL FUEL PLUBING & HTINGGas, Water/Sanitary
1 project · most recent 01/08/2025
FiledStatusContractorScope
01/08/2025Permit IssuedITKIN ELECTRIC CORP.—
1 project · most recent 12/13/2024
Scaffold
FiledStatusContractorScope
12/13/2024Permit IssuedACE GROUP NY CORPScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/14/2026Pass-Final Boiler Equipment InspectionPassView ↗
12/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
12/17/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/17/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
12/17/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/17/2025Heating SystemsSAMI HAJJAR P.Especial
12/17/2025Tenant Protection Plan Compliance—special
12/17/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
10/23/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
10/23/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
10/23/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
10/23/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
10/23/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
10/23/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/14/2025FinalSAMI HAJJAR P.Eprogress
02/14/2025Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
02/14/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
02/14/2025Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
02/14/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
02/14/2025VestibulesSAMI HAJJAR P.Eenergy_progress
02/14/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
02/14/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
02/14/2025Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
02/14/2025Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
02/14/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/14/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/14/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
Latest 25 of 44.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/25/2026B01012475-I1Request digital key ↗
08/25/2026B00931075-P1Request digital key ↗
08/25/2026B00931075-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026B00931075-I1Open ↗
08/25/2026B00931075-P1Open ↗
08/24/2026B00979883-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/22/2026B00980588-P1Open ↗
09/02/2026B00918759-I1Open ↗
09/02/2026B00918759-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/22/2026B00980588-P1Open ↗
09/02/2026B00918759-I1Open ↗
09/02/2026B00918759-I1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026B00979883-I1Open ↗
08/22/2026B00918759-I1Open ↗
08/22/2026B00918759-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026B00931075-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/23/2026B00979424-I1Open ↗
08/23/2026B00952122-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/22/2026B00918759-P1Open ↗
08/22/2026B00918759-I1Open ↗
08/13/2026B00979883-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026B01104752-I1Open ↗
08/13/2026B01104752-P1Open ↗
▸Other Documents1
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B00980588-P1Open ↗