Old law tenement
168 EAST 7 STREET
MANHATTAN · BIN 1005091
💬 Discuss this project
1911Year Built
5Stories
C4Building Class
R7BZoning
9,720 sfGross Floor Area
20Units
Rent Stabilized22 Open Violations ▸
Old law tenement · Owner of record: 168 EAST 7TH STREET, LLC · 2,533 sf lot · 3.84 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2 filings · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STAR CITIES MANAGEMENT1307/08/2026
168 EAST 7TH STREET, LLC403/22/2026
168 EAST 7 ST LLC103/22/2026
MITITON L EHRLICH INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REAL CREATIVE MOTION ENGINEERING SE404/25/2025
POTENTIAL ENGINEERING P.C.103/20/2024
KZ ENGINEERING, P.C102/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CLARKE CONSTRUCTION CONSULTANTS503/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE METRO GROUP, INCGeneral Contractor603/21/2026
CALRAY GAS HEAT CORPPlumbing207/08/2026
COACHMEN SOLUTIONS CORPElectrical103/22/2026
TRAVALJA, SILVANOElectrical103/21/2026
WIDE FLANGE INCElectrical103/21/2026
EMG INDUSTRIAL CHIMNEY INGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARCY ENGINEERING9601204/25/2025
PROFESSIONAL SOLUTIONS GR1756404/22/2025
J STONE ACQUISITIONS LLC8153203/20/2024
KZ ENGINEERING, P.C.4665102/28/2024
Building Lifecycle
All (99)Filed (6)Permit Issued (5)Signed Off (2)Violation (51)Inspection (13)Objection (2)Special Inspection (20)
07/29/2026
Signed off — Alteration
REPLACE EXIST (2) HOT WATER HEATERS AND INSTALL NEW (1) HOT WATER HEATER. COMBINE ALL HEATERS VENTS IN ONE VENT PIPE AND RUN IT SEPERATELY FROM BOILER CHIMNEY UP TO ROOF. PROVIDE ADAQUATE AIR COMBUSTION INTAKE TO THE BOILER ROOM. WORK PER SUBMITTED PLANS
M01008543-S1
05/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2026
Signed off — Alteration
REPLACE EXIST (2) HOT WATER HEATERS AND INSTALL NEW (1) HOT WATER HEATER. COMBINE ALL HEATERS VENTS IN ONE VENT PIPE AND RUN IT SEPERATELY FROM BOILER CHIMNEY UP TO ROOF. PROVIDE ADAQUATE AIR COMBUSTION INTAKE TO THE BOILER ROOM. WORK PER SUBMITTED PLANS
M01008543-S3
05/06/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
05/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
A
04/10/2026
Permit issued — Plumbing
M01008543-S3-PL
06/27/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/27/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
05/19/2025
Special inspection requirement — Final
SAMER ABOU-GHAIDA
05/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jacob Stone
05/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
05/19/2025
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
04/25/2025
Filed — Alteration
REPLACE EXIST (2) HOT WATER HEATERS AND INSTALL NEW (1) HOT WATER HEATER. COMBINE ALL HEATERS VENTS IN ONE VENT PIPE AND RUN IT SEPERATELY FROM BOILER CHIMNEY UP TO ROOF. PROVIDE ADAQUATE AIR COMBUSTION INTAKE TO THE BOILER ROOM. WORK PER SUBMITTED PLANS
M01008543-S3
04/22/2025
Filed — Alteration
REPLACE EXIST (2) HOT WATER HEATERS AND INSTALL NEW (1) HOT WATER HEATER. COMBINE ALL HEATERS VENTS IN ONE VENT PIPE AND RUN IT SEPERATELY FROM BOILER CHIMNEY UP TO ROOF. PROVIDE ADAQUATE AIR COMBUSTION INTAKE TO THE BOILER ROOM. WORK PER SUBMITTED PLANS
M01008543-P1
04/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jacob Stone
04/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/09/2025
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
04/09/2025
Special inspection requirement — Final
SAMER ABOU-GHAIDA
04/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
02/25/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/22/2024
Violation issued (HPD, closed)
I
09/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/21/2024
Violation issued (HPD, open)
B
09/21/2024
Violation issued (HPD, open)
C
09/21/2024
Violation issued (HPD, open)
A
09/21/2024
Violation issued (HPD, open)
C
09/21/2024
Violation issued (HPD, closed)
C
09/21/2024
Violation issued (HPD, open)
C
09/17/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
B
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
A
07/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2024
Permit issued — Plumbing
M01008543-S2-PL
06/24/2024
Permit issued — Mechanical Systems
M01008543-S1-MS
05/20/2024
Permit issued — General Construction
M01008543-I1-GC
05/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/01/2024
Permit issued — Supported Scaffold
M01009320-I1-SF
04/01/2024
Violation issued (HPD, closed)
A
03/20/2024
Filed — Alteration
REPLACE EXIST (2) HOT WATER HEATERS AND INSTALL NEW (1) HOT WATER HEATER. COMBINE ALL HEATERS VENTS IN ONE VENT PIPE AND RUN IT SEPERATELY FROM BOILER CHIMNEY UP TO ROOF. PROVIDE ADAQUATE AIR COMBUSTION INTAKE TO THE BOILER ROOM. WORK PER SUBMITTED PLANS
M01008543-S1
03/20/2024
Filed — Alteration
REPLACE EXIST (2) HOT WATER HEATERS AND INSTALL NEW (1) HOT WATER HEATER. COMBINE ALL HEATERS VENTS IN ONE VENT PIPE AND RUN IT SEPERATELY FROM BOILER CHIMNEY UP TO ROOF. PROVIDE ADAQUATE AIR COMBUSTION INTAKE TO THE BOILER ROOM. WORK PER SUBMITTED PLANS
M01008543-S2
03/20/2024
Filed — Alteration
REPLACE EXIST (2) HOT WATER HEATERS AND INSTALL NEW (1) HOT WATER HEATER. COMBINE ALL HEATERS VENTS IN ONE VENT PIPE AND RUN IT SEPERATELY FROM BOILER CHIMNEY UP TO ROOF. PROVIDE ADAQUATE AIR COMBUSTION INTAKE TO THE BOILER ROOM. WORK PER SUBMITTED PLANS
M01008543-I1
03/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMER ABOU-GHAIDA
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
03/19/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP04/10/2026
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP06/26/2024
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC06/24/2024
DOB NOWGeneral ConstructionPermit IssuedTHE METRO GROUP, INC05/20/2024
DOB NOWSupported ScaffoldPermit IssuedEMG INDUSTRIAL CHIMNEY IN04/01/2024
BISOTISSUEDBALKAN INC06/04/2012
BISEQISSUEDEVEREST SCAFFOLDING INC03/11/2009
BISEQISSUEDEVEREST SCAFFOLDING INC03/10/2009
BISOTISSUEDGALA RESORATATION INC02/20/2009
BISOTISSUEDBALKAN INC01/13/2006
BISPLISSUEDDNA PLUMBING CONTR. INC01/11/2005
BISPLISSUEDDNA PLUMBING CONTR. INC01/05/2005
BISOTISSUEDBAKIM INC.12/29/2004
BISOTISSUEDMILTON EHRLICH INC.10/26/2004
BISPLISSUEDA.M.N. CORPORATION02/19/2004
BISOTISSUEDZENON CONSTR.02/12/2004
BISPLISSUEDMAXIMUM COMBUSTION11/19/1991
BISBLISSUEDMAXIMUM COMBUSTION11/19/1991
1 project · most recent 04/25/2025
Gas
FiledStatusContractorScope
04/25/2025Signed-offCALRAY GAS HEAT CORPGas
3 projects · most recent 03/27/2025
General Wiring
FiledStatusContractorScope
03/27/2025Permit IssuedCOACHMEN SOLUTIONS CORPGeneral Wiring
09/23/2024Permit IssuedL.J.F. & SONS ELECL CONTS—
02/14/2023Permit IssuedCENTRUM ELECTRIC CORPGeneral Wiring
1 project · most recent 02/28/2024
Scaffold
FiledStatusContractorScope
02/28/2024Permit IssuedEMG INDUSTRIAL CHIMNEY INScaffold
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/17/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/19/2025FinalSAMER ABOU-GHAIDAprogress
05/19/2025Tenant Protection Plan ComplianceJacob Stonespecial
05/19/2025HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
05/19/2025Mechanical SystemsSAMER ABOU-GHAIDAspecial
05/19/2025Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
04/21/2025Tenant Protection Plan ComplianceJacob Stonespecial
04/10/2025Tenant Protection Plan Compliance—special
04/09/2025Mechanical SystemsSAMER ABOU-GHAIDAspecial
04/09/2025FinalSAMER ABOU-GHAIDAprogress
04/09/2025HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
04/09/2025Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
03/19/2024Structural Stability – Alterations of existing buildingsSAMER ABOU-GHAIDAspecial
03/19/2024Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
03/19/2024Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
03/19/2024Fire-Resistance Rated ConstructionSAMER ABOU-GHAIDAprogress
03/19/2024Insulation placement and R valuesSAMER ABOU-GHAIDAenergy_progress
03/18/2024FinalSAMER ABOU-GHAIDAprogress
03/18/2024Tenant Protection Plan ComplianceJacob Stonespecial
03/07/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
02/27/2024Post-installed AnchorsKarol Zdancewiczspecial
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026M01008543-S3Request digital key ↗
08/24/2026M01008543-P1Request digital key ↗
08/24/2026M01008543-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION7
06/05/2012121081122Open ↗
06/10/2009110434147Open ↗
03/12/2009110247180Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
06/05/2012121081122Open ↗
01/15/2009110434147Open ↗
10/07/2008110353082Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature13
08/31/2026M01008543-S2Open ↗
08/31/2026M01008543-S2Open ↗
08/31/2026M01008543-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026M01008543-S3Open ↗
08/31/2026M01008543-S2Open ↗
08/31/2026M01008543-S2Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/05/2012121081122Open ↗
01/08/2010110247180Open ↗
01/08/2010110247171Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026M01008543-S3Open ↗
08/24/2026M01008543-P1Open ↗
08/24/2026M01008543-S2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/05/2012121081122Open ↗
10/07/2008110353082Open ↗
09/18/2008110247171Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
06/05/2012121081122Open ↗
10/07/2008110353082Open ↗
09/18/2008110247171Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026M01008543-S3Open ↗
08/24/2026M01008543-P1Open ↗
08/24/2026M01008543-S2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
10/07/2008110353082Open ↗
09/18/2008110247171Open ↗
09/18/2008110247180Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/15/2009110434147Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/05/2012121081122Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/05/2012121081122Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/24/2026M01008543-S1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS5
06/05/2012121081122Open ↗
01/15/2009110434147Open ↗
10/07/2008110353082Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/08/2010110247180Open ↗
01/08/2010110247171Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/08/2010110247180Open ↗
01/08/2010110247171Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
06/05/2012121081122Open ↗
08/17/2009110353082Open ↗
01/15/2009110434147Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/05/2012121081122Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
06/05/2012121081122Open ↗
01/15/2009110434147Open ↗
10/07/2008110353082Open ↗
▸BISeFiling Job Application Cover Sheet2
09/18/2008110247171Open ↗
09/18/2008110247180Open ↗