177 ARDSLEY LOOP · BIN 3098291
💬 Discuss this project
1972Year Built
4Stories
G1Building Class
R5Zoning
240,000 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 12 likely answered ▸FDNY Report ↗
All parking garages · Owner of record: BSC Housing Company · 67,200 sf lot · 3.57 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBSC Retail Owner LLCUnder Construction27p · 2 filings · 20 docs
Floor 4BSC Retail Owner LLCUnder Construction25p · 3 filings · 20 docs
Floor 3BSC Retail Owner LLCUnder Construction29p · 3 filings · 20 docs
Floor 2BSC Retail Owner LLCUnder Construction36p · 4 filings · 20 docs
Floor 1BSC Retail Owner LLCUnder Construction55p · 7 filings · 20 docs
CellarBsc Housing Company, INC12p · 1 filing · 12 docs
BasementBSC Retail Owner LLCUnder Construction6p · 1 filing · 20 docs
Site & exteriorBsc Housing Company, INCUnder Construction18p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSC Housing Company1510/17/2026
NYC Department of Housing Preservation and Development507/08/2026
BSC Retail Owner203/21/2026
Spring City Towers203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group2603/21/2026
AK Consulting Services203/21/2026
Core Consultants NYC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Accurate MechanicalPlumbing507/08/2026
Three Star Construction GGeneral Contractor507/08/2026
Three Star Construction GScaffold303/21/2026
Fresh Meadow Mechanical PlumbingPlumbing207/08/2026
Kama ConstructionGeneral Contractor209/26/2026
O'Leary ConstructionGeneral Contractor203/21/2026
Metro Fire ProtectionFire Protection109/16/2026
Structural Preserv SystemGeneral Contractor104/09/2026
SKY Heights ConstructionScaffold107/08/2026
DJH Mechanicalspecialty_contractor110/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sandeep Gunnala Engineering8482310/14/2026
Shahrish Shuvo Engineering8524102/05/2026
Street Consulting Engineering4259101/28/2026
PSI Agency254810/26/2023
Building Lifecycle
All (127)Filed (20)Permit Issued (15)Signed Off (7)Violation (45)Objection (10)Special Inspection (30)
10/16/2026
Permit issued — Mechanical Systems
B01093098-S3-MS
10/14/2026
Filed — Alteration CO
SPRINKLER WORK IN CONJUCTION WITH ARCHITECTURAL JOB NUMBER #B01093098-I1
B01093098-P1
10/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
10/13/2026
Special inspection requirement — Mechanical Systems
Sandeep Gunnala
10/13/2026
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
10/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Sandeep Gunnala
10/13/2026
Special inspection requirement — Final
Sandeep Gunnala
10/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
10/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
09/25/2026
Permit issued — General Construction
B01093098-I1-GC
09/15/2026
Permit issued — Sprinklers
B01093098-S2-EW-SP
04/18/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01343996-P1
03/10/2026
Objection resolved — Addressed
02/25/2026
Signed off — Alteration
B01347414-I1
02/17/2026
Permit issued — Structural
B01347414-I1-ST
02/05/2026
Filed — Alteration
B01347414-I1
01/28/2026
Filed — Alteration CO
SPRINKLER WORK IN CONJUCTION WITH ARCHITECTURAL JOB NUMBER #B01093098-I1
B01093098-S3
01/28/2026
Filed — Alteration CO
SPRINKLER WORK IN CONJUCTION WITH ARCHITECTURAL JOB NUMBER #B01093098-I1
B01093098-S2
01/27/2026
Special inspection requirement — Post-installed Anchors
01/23/2026
Permit issued — Sidewalk Shed
B01343996-I1-SH
01/22/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01343996-I1
01/21/2026
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
01/21/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
01/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
01/15/2026
Special inspection requirement — Final
Shahrish Shuvo
12/30/2025
Objection resolved — Addressed
12/29/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/26/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/26/2025
Violation issued (ECB, closed)
Construction
10/03/2025
Objection resolved — Addressed
10/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
10/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
10/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
10/01/2024
Objection resolved — Addressed
10/01/2024
Objection resolved — Addressed
09/26/2024
Objection raised — Zoning
09/26/2024
Objection raised — Other
09/26/2024
Objection raised — Other
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2024
Special inspection requirement — Final
09/17/2024
Special inspection requirement — Mechanical Systems
09/17/2024
Special inspection requirement — Sprinkler Systems
09/11/2024
Signed off — Alteration
APPLICATION FILE FOR INSTALLATION OF TEMPORARY SHORING AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00883347-I1
09/06/2024
Objection raised — Scope
09/06/2024
Objection raised — Scope
08/29/2024
Filed — Alteration CO
SPRINKLER WORK IN CONJUCTION WITH ARCHITECTURAL JOB NUMBER #B01093098-I1
B01093098-I1
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/29/2024
Signed off — Alteration
Installation of (6) new gas boilers and their prefabricated enclosure.
B00390304-I1
05/28/2024
Violation issued (FDNY_NOV, closed)
05/21/2024
Signed off — Alteration
Installation of new gas plumbing piping for related new boilers to be installed.
B00390302-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2024
Violation issued (ECB, open)
Construction
03/11/2024
Signed off — Alteration
Reconstruction of concrete guard wall and localized concrete slab repair, repairs and waterproofing to supersede application 321798649 as per plans filed herewith. No change to use, egress or occupancy.
B00763405-I1
10/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDJH Mechanical10/16/2026
DOB NOWGeneral ConstructionPermit IssuedKama Construction09/25/2026
DOB NOWSprinklersPermit IssuedMetro Fire Protection09/15/2026
DOB NOWStructuralSigned-offStructural Preserv System02/17/2026
DOB NOWSidewalk ShedPermit IssuedSKY Heights Construction01/23/2026
DOB NOWStructuralSigned-offThree Star Construction G08/28/2023
DOB NOWStructuralSigned-offThree Star Construction G08/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offThree Star Construction G06/09/2023
DOB NOWStructuralSigned-offThree Star Construction G08/29/2022
DOB NOWPlumbingSigned-offAnthony Disabato10/01/2021
DOB NOWBoiler EquipmentSigned-offMichael Burns P&H08/31/2021
DOB NOWStructuralSigned-offKama Construction03/12/2021
DOB NOWBoiler EquipmentSigned-offMichael Burns P&H03/01/2021
DOB NOWPlumbingSigned-offAnthony Disabato09/26/2020
DOB NOWStructuralSigned-offO'Leary Construction05/26/2020
BISOTISSUEDGilbane Building Company07/06/2018
BISCCISSUEDMC Fleming Group02/07/2013
1 project · most recent 10/14/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026Permit IssuedDJH MechanicalVentilation Systems
Ventilation
Daikin VAM1200GVJU 1,200 CFM · Erv ×2
VAM600GVJU 600 CFM · Erv ×2
Titus 300RL 12,000 CFM · Ductwork ×2
350RL 600 CFM · Exhaust Fan ×2
1 project · most recent 10/14/2026
Sprinkler System
FiledStatusContractorScope
10/14/2026Permit IssuedMetro Fire ProtectionSprinkler System
1 project · most recent 10/14/2026
FiledStatusContractorScope
10/14/2026———
2 projects · most recent 02/13/2026
General Wiring
FiledStatusContractorScope
02/13/2026Permit IssuedLabco Eletrt Contng—
08/18/2020CompleteM&T ElectricalGeneral Wiring
1 project · most recent 04/18/2026
Sidewalk Shed
FiledStatusContractorScope
04/18/2026Permit IssuedSKY Heights ConstructionSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
10/13/2026HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
10/13/2026Mechanical SystemsSandeep Gunnalaspecial
10/13/2026Post-installed AnchorsSandeep Gunnalaspecial
10/13/2026Energy Code Compliance InspectionsSandeep Gunnalaprogress
10/13/2026FinalSandeep Gunnalaprogress
10/13/2026HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
10/13/2026HVAC-R and service water heating equipmentSandeep Gunnalaenergy_progress
01/27/2026Post-installed Anchors—special
01/21/2026Concrete - Cast-In-PlaceShahrish Shuvospecial
01/21/2026Post-installed AnchorsShahrish Shuvospecial
01/16/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
01/15/2026FinalShahrish Shuvoprogress
10/07/2024HVAC-R and service water piping design and insulation—energy_progress
10/07/2024HVAC-R and service water heating system controls—energy_progress
10/07/2024HVAC-R and service water heating equipment—energy_progress
09/25/2024Energy Code Compliance Inspections—progress
09/17/2024Final—progress
09/17/2024Mechanical Systems—special
09/17/2024Sprinkler Systems—special
10/30/2023Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
10/30/2023FinalMAURICIO ANDRADEprogress
10/30/2023Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
10/30/2023Post-installed AnchorsMAURICIO ANDRADEspecial
10/18/2023Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
10/18/2023FinalMAURICIO ANDRADEprogress
Latest 25 of 43.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch9
08/28/2026B00763405-P1Request digital key ↗
08/28/2026B00763405-I1Request digital key ↗
08/27/2026B00883347-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/02/2026B00342974-I1Request digital key ↗
08/31/2026B00431368-I1Request digital key ↗
08/15/2026B00431368-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00390302-I1Request digital key ↗
09/02/2026B00390302-P1Request digital key ↗
09/02/2026B00390302-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00390304-I1Request digital key ↗
08/15/2026B00390304-P1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION6
11/04/2021321798649Open ↗
09/27/2021321798649Open ↗
07/06/2021321798649Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION2
07/09/2018321798649Open ↗
02/08/2013320111017Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature20
10/16/2026B01093098-P1Open ↗
09/02/2026B00342974-I1Open ↗
09/02/2026B00342974-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
10/16/2026B01093098-P1Open ↗
10/16/2026B01093098-P1Open ↗
09/02/2026B00431368-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/16/2026B01093098-P1Open ↗
10/16/2026B01093098-P1Open ↗
10/16/2026B01093098-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/09/2018321798649Open ↗
07/09/2018321798649Open ↗
12/15/2009320111017Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/09/2018321798649Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/09/2018321798649Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026B00342974-I1Open ↗
09/02/2026B00342974-P1Open ↗
08/31/2026B00431368-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/15/2009320111017Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/09/2018321798649Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/09/2018321798649Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00390304-I1Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
10/16/2026B01093098-P1Open ↗
09/02/2026B00342974-I1Open ↗
09/02/2026B00342974-P1Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
12/17/2009320111017Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/09/2018321798649Open ↗
12/15/2009320111017Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
07/03/2018321798649Open ↗
12/15/2009320111017Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B01093098-I1Open ↗