← Back
Office with commercial, 7-19 stories
18 WEST 20 STREET
MANHATTAN · BIN 1015480
💬 Discuss this project
1902Year Built
11Stories
O6Building Class
C6-4AZoning
93,722 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: DEZER PROPERTIES II LLC · 9,200 sf lot · 10.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof1p · 2 filings · 9 docs
Floor 97p · 2 filings · 20 docs
Floor 8
Floor 7
Floor 6
Floor 56p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 28p · 2 filings · 20 docs
Floor 11p · 1 filing · 4 docs
Mezzanine4p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEZER PROPERTIES5207/08/2026
AT&T503/22/2026
DEZER PROPERTIES IIL3703/22/2026
DEZER PROPERTIES 11 LLC303/22/2026
DEZER PROPERTIES 11 LLC 1103/22/2026
DEYER PROPERTIES COMPANY103/22/2026
DEZER PROPERTIES 60103/22/2026
HELMSELY SPEAR INC103/22/2026
DEZER ENTERTAINMENT CO403/22/2026
DK GENERAL CONTRACTOR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CTHREE ARCHITECTURE + DESIGN1003/21/2026
CCM CONSULTING GROUP, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RUMIA CONTRACTING CORPGeneral Contractor907/08/2026
JACOBS TELECOMMUN. INCGeneral Contractor303/21/2026
OVERLAND CONTRACTING INCGeneral Contractor303/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
HEAD, WElectrical203/21/2026
PEREZ-HERMO, JOSEElectrical203/21/2026
AFGO MECHANICAL SVCS INCGeneral Contractor203/21/2026
JOVIN DEMO INCGeneral Contractor207/08/2026
P.S.I. MECHANICALPlumbing107/08/2026
LIGHTNING MECHANICAL LLCGeneral Contractor107/08/2026
STERN ABRAHAMElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
BIG APPLE FIRE SPRKL CO IFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CTHREE ARCHITECTURE + DES1124608/20/2026
ANDREW FRANZ ARCHITECT, P2384108/23/2024
STARTECH ENGINEERING P.C.1041412/13/2023
R MARSAC CONSULTING LLC329103/26/2021
KMB DESIGN GROUP, LLC513103/03/2019
Building Lifecycle
All (178)Filed (17)Permit Issued (14)Signed Off (9)Facade (FISP) (12)Violation (60)Inspection (8)Objection (28)Special Inspection (30)
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Salvatore Croce
08/24/2026
Special inspection requirement — Lighting controls
Salvatore Croce
08/24/2026
Special inspection requirement — Interior lighting power
Salvatore Croce
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Salvatore Croce
08/20/2026
Filed — Alteration CO
APPLICATION FILED TO CONVERT EXISTING RESIDENTIAL UNIT ON THE 9TH FLOOR SUITE 903 TO OFFICE SPACE AND OBTAIN AMENDED C OF O AS SHOWN ON PLANS FILED HEREWITH. NO INCREASE TO BULK OR SQUARE FOOTAGE, AND NO CHANGE TO EGRESS.
M00843655-P3
08/18/2026
Special inspection requirement — Interior lighting power
Salvatore Croce
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Salvatore Croce
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Salvatore Croce
08/18/2026
Special inspection requirement — Lighting controls
Salvatore Croce
06/29/2026
Violation issued (ECB, open)
Construction
11/24/2025
Violation issued (HPD, open)
I
08/25/2025
Signed off — Alteration
AT&T/ Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Removal and installation of existing cabinets with installation of new RRH units on existing telecommunications platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M00000452-I1
12/17/2024
Signed off — Alteration
M01096726-I1
12/03/2024
Violation issued (HPD, open)
I
11/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2024
Permit issued — Mechanical Systems
M01096726-I1-MS
09/18/2024
Signed off — Alteration
M01071481-I1
09/12/2024
Permit issued — General Construction
M01071481-I1-GC
08/26/2024
Filed — Alteration
M01071481-I1
08/23/2024
Filed — Alteration
M01096726-I1
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andrew Franz
08/15/2024
Special inspection requirement — Mechanical Systems
Andrew Franz
08/15/2024
Special inspection requirement — Final
Andrew Franz
07/08/2024
Filed — Alteration CO
APPLICATION FILED TO CONVERT EXISTING RESIDENTIAL UNIT ON THE 9TH FLOOR SUITE 903 TO OFFICE SPACE AND OBTAIN AMENDED C OF O AS SHOWN ON PLANS FILED HEREWITH. NO INCREASE TO BULK OR SQUARE FOOTAGE, AND NO CHANGE TO EGRESS.
M00843655-P1
07/05/2024
Special inspection requirement — Lighting controls
Salvatore Croce
07/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Salvatore Croce
07/05/2024
Special inspection requirement — Interior lighting power
Salvatore Croce
07/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Salvatore Croce
06/25/2024
Special inspection requirement — Interior lighting power
Salvatore Croce
06/24/2024
Cycle 9 facade report signed — SWARMP
06/24/2024
Special inspection requirement — Final
Salvatore Croce
06/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/31/2024
Permit issued — General Construction
M00843655-I1-GC
04/22/2024
Objection raised — Scope
04/22/2024
Objection resolved — Addressed
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade inspection completed
01/31/2024
Signed off — Alteration
NEW NON-LOAD BEARING INTERIOR PARTITIONS, FINISHES AND RESTROOMS ON THE 2ND & 5TH FLOOR EXISTING OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00840444-S2
01/31/2024
Signed off — Alteration
NEW NON-LOAD BEARING INTERIOR PARTITIONS, FINISHES AND RESTROOMS ON THE 2ND & 5TH FLOOR EXISTING OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00840444-S1
01/09/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/04/2024
Signed off — Alteration
M00824874-I1
01/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FLORENTIN POPESCU
12/15/2023
Special inspection requirement — Sprinkler Systems
FLORENTIN POPESCU
12/13/2023
Filed — Alteration
NEW NON-LOAD BEARING INTERIOR PARTITIONS, FINISHES AND RESTROOMS ON THE 2ND & 5TH FLOOR EXISTING OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00840444-P2
12/13/2023
Filed — Alteration
NEW NON-LOAD BEARING INTERIOR PARTITIONS, FINISHES AND RESTROOMS ON THE 2ND & 5TH FLOOR EXISTING OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00840444-P3
12/11/2023
Signed off — Alteration
NEW NON-LOAD BEARING INTERIOR PARTITIONS, FINISHES AND RESTROOMS ON THE 2ND & 5TH FLOOR EXISTING OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00840444-I1
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FLORENTIN POPESCU
12/11/2023
Special inspection requirement — Sprinkler Systems
FLORENTIN POPESCU
11/27/2023
Violation issued (HPD, closed)
I
11/14/2023
Permit issued — General Construction
M00840444-I1-GC
10/27/2023
Filed — Alteration
NEW NON-LOAD BEARING INTERIOR PARTITIONS, FINISHES AND RESTROOMS ON THE 2ND & 5TH FLOOR EXISTING OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00840444-P1
10/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Salvatore Croce
10/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
Salvatore Croce
10/27/2023
Special inspection requirement — Final
Salvatore Croce
10/27/2023
Special inspection requirement — Interior lighting power
Salvatore Croce
10/27/2023
Special inspection requirement — Lighting controls
Salvatore Croce
10/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Salvatore Croce
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLIGHTNING MECHANICAL INC09/27/2024
DOB NOWGeneral ConstructionSigned-offRUMIA CONTRACTING CORP09/12/2024
DOB NOWGeneral ConstructionPermit IssuedRUMIA CONTRACTING CORP05/31/2024
DOB NOWGeneral ConstructionSigned-offRUMIA CONTRACTING CORP11/14/2023
DOB NOWGeneral ConstructionSigned-offRUMIA CONTRACTING CORP05/26/2023
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL05/11/2023
DOB NOWSprinklersSigned-offBIG APPLE FIRE SPRKL CO I05/09/2023
DOB NOWGeneral ConstructionSigned-offRUMIA CONTRACTING CORP04/24/2023
DOB NOWGeneral ConstructionSigned-offJOVIN DEMO INC02/09/2023
DOB NOWGeneral ConstructionSigned-offJOVIN DEMO INC01/18/2023
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC04/30/2021
DOB NOWMechanical SystemsSigned-offAFGO MECHANICAL SVCS03/18/2020
DOB NOWSidewalk ShedPermit IssuedEVEREST SCAFFOLDING INC11/13/2019
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR04/19/2019
BISPLISSUEDNICE PLUMBING CORP01/27/2025
BISOTISSUEDCARDONE CONCRETE INC07/18/2018
BISOTISSUEDCARDONE CONCRETE INC07/18/2018
BISOTISSUEDGALICIA CONTRACTING & REST.07/14/2017
BISOTISSUEDGALICIA CONTRACTING & REST.04/11/2017
BISOTISSUEDGALICIA CONTRACTING & REST.03/07/2017
BISEQISSUEDACUMATE SERVICES, LLC10/03/2016
BISEQISSUEDSPRING SCAFFOLDING LLC10/03/2016
BISMHISSUEDQUADRANT DEVELOPMENT09/30/2016
BISEQISSUEDSPRING SCAFFOLDING LLC06/29/2016
BISOTISSUEDQUADRANT DEVELOPMENT03/21/2016
BISEQISSUEDSPRING SCAFFOLDING LLC10/09/2015
BISOTISSUEDASH CONTRACTING CORP05/29/2015
BISMHISSUEDASH CONTRACTING CORP05/29/2015
BISOTISSUEDCROSSLINK WIRELESS LLC02/10/2014
BISOTISSUEDSQUAN CONSTRUCTION SERVIC01/24/2011
BISPLISSUEDFLINT MECHANICAL CORP04/12/2010
BISOTISSUEDABCZ CORP02/05/2010
BISOTISSUEDABCZ CORP10/07/2009
BISEQISSUEDOUTDOOR INSTALLATIONS LLC09/26/2006
BIS—ISSUEDDEZER PROPERTIES COMPANY06/06/2005
BIS—ISSUEDDEZER PROPERTIES COMPANY04/14/2005
BISOTISSUEDJ.A. LEE ELECTRIC INC12/14/2004
BISEQISSUEDSPRING SCAFF10/13/2004
BISOTISSUEDPOWER CONSULTING05/11/2004
BISPLISSUEDAMW PLBG. & HTG.07/12/2002
+ 16 more permits on file
2 projects · most recent 04/27/2023
General Wiring
FiledStatusContractorScope
04/27/2023CompleteETECH ELECTRICAL LLCGeneral Wiring
11/07/2019CancelledBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/24/2026Energy Code Compliance InspectionsSalvatore Croceprogress
08/24/2026Lighting controlsSalvatore Croceenergy_progress
08/24/2026Interior lighting powerSalvatore Croceenergy_progress
08/24/2026Fire-Resistant Penetrations and JointsSalvatore Crocespecial
08/18/2026Interior lighting powerSalvatore Croceenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsSalvatore Crocespecial
08/18/2026Energy Code Compliance InspectionsSalvatore Croceprogress
08/18/2026Lighting controlsSalvatore Croceenergy_progress
08/15/2024Fire-Resistant Penetrations and JointsAndrew Franzspecial
08/15/2024Mechanical SystemsAndrew Franzspecial
08/15/2024FinalAndrew Franzprogress
07/05/2024Lighting controlsSalvatore Croceenergy_progress
07/05/2024Energy Code Compliance InspectionsSalvatore Croceprogress
07/05/2024Interior lighting powerSalvatore Croceenergy_progress
07/05/2024Fire-Resistant Penetrations and JointsSalvatore Crocespecial
06/25/2024Interior lighting powerSalvatore Croceenergy_progress
06/24/2024FinalSalvatore Croceprogress
12/15/2023Fire-Resistant Penetrations and JointsFLORENTIN POPESCUspecial
12/15/2023Sprinkler SystemsFLORENTIN POPESCUspecial
12/11/2023Fire-Resistant Penetrations and JointsFLORENTIN POPESCUspecial
12/11/2023Sprinkler SystemsFLORENTIN POPESCUspecial
10/27/2023Energy Code Compliance InspectionsSalvatore Croceprogress
10/27/2023Fire-Resistance Rated ConstructionSalvatore Croceprogress
10/27/2023FinalSalvatore Croceprogress
10/27/2023Interior lighting powerSalvatore Croceenergy_progress
Latest 25 of 30.
▾Documents — 400 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
09/05/2026M00000452-I1Request digital key ↗
09/01/2026M08050688-I1Request digital key ↗
08/31/2026M00824874-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
09/03/2026M00576441-I1Request digital key ↗
09/03/2026M00576441-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00467086-I1Request digital key ↗
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION40
07/28/2025103141976Open ↗
07/28/2025101006572Open ↗
04/17/2025100517415Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION18
01/27/2025110159916Open ↗
07/18/2018123447564Open ↗
07/18/2018123447564Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWLPC Approval/Permit12
08/22/2026M00843655-P3Open ↗
08/15/2026M00467086-I1Open ↗
08/13/2026M08050688-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications91
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
02/19/2019123447564Open ↗
02/19/2019123447564Open ↗
02/19/2019123447564Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/05/2026M00000452-I1Open ↗
09/04/2026M00467086-I1Open ↗
09/03/2026M00576441-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M01096726-I1Open ↗
08/30/2026M01071481-I1Open ↗
08/30/2026M01071481-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026M00840444-P3Open ↗
09/01/2026M01096726-I1Open ↗
09/01/2026M01096726-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
06/01/2018123447564Open ↗
06/01/2018123447564Open ↗
04/10/2017123060515Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/01/2018123447564Open ↗
04/10/2017123060515Open ↗
07/01/2016122819076Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/30/2016140554594Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/01/2016122819076Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2016140554594Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
03/10/2016121850096Open ↗
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes8
06/01/2018123447564Open ↗
12/27/2017123164413Open ↗
04/10/2017123060515Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Checklist3
08/22/2026M00843655-P3Open ↗
08/13/2026M00843655-P1Open ↗
08/13/2026M00843655-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
02/06/2017122840532Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/05/2026M00000452-I1Open ↗
09/01/2026M08050688-I1Open ↗
08/31/2026M00840444-S1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
07/10/2018123447564Open ↗
04/14/2017123060515Open ↗
09/23/2016122846509Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/22/2016122840532Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
06/01/2018123447564Open ↗
12/27/2017123164413Open ↗
11/09/2017122840532Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
02/19/2019123447564Open ↗
02/06/2018122840532Open ↗
11/09/2017122840532Open ↗
Showing 3 of 9 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/30/2016140554594Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/19/2025100517415Open ↗
05/19/2025100517415Open ↗
05/19/2025100517415Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/22/2025110159916Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/06/2018122840532Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
09/23/2024102903011Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/22/2025110159916Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
04/04/2017122819076Open ↗
▸Approvals, Objections & Sign-offs52
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
07/18/2025121850096Open ↗
05/19/2025100517415Open ↗
04/08/2025110159916Open ↗
Showing 3 of 23 on file for this type
▸BISLANDMARKS APPROVAL16
02/19/2019123447564Open ↗
07/11/2018123447564Open ↗
10/04/2017123060515Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/10/2018123447564Open ↗
03/06/2017122840532Open ↗
03/06/2017122840532Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
02/06/2018122840532Open ↗
▸BISSUPERSEDING LETTER1
01/27/2025110159916Open ↗
▸BISLANDMARKS SIGNOFF1
04/08/2025110159916Open ↗
▸BISFINAL1
03/25/2025110159916Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
10/14/2016122547976Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT26
05/19/2025100517415Open ↗
09/23/2024102903011Open ↗
02/19/2019123447564Open ↗
Showing 3 of 26 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/18/2025121850096Open ↗
03/25/2025110159916Open ↗
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET14
06/01/2018123447564Open ↗
06/01/2018123447564Open ↗
12/27/2017123164413Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM8
01/27/2025110159916Open ↗
02/19/2019123447564Open ↗
02/06/2018122840532Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
03/13/2017122840532Open ↗
02/27/2017122840532Open ↗
07/01/2016122819076Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/30/2016140554594Open ↗
▸Other Documents21
▸BISLOFT BOARD CERTIFICATE7
04/14/2017123060515Open ↗
12/06/2016122846509Open ↗
10/26/2016122840532Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Exempt4
11/15/2017122547976Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/27/2026M00843655-P1Open ↗
08/22/2026M00843655-P3Open ↗
08/14/2026M00843655-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/18/2025121850096Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWLoft Board Certificate2
09/05/2026M00000452-I1Open ↗
08/15/2026M00467086-I1Open ↗
▸BISSupporting Document: Fee Deferment1
07/01/2016122819076Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00843655-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01096726-I1Open ↗