| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01378577 ↗ | 157 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 06/03/2026 | 08/11/2026 | Design ABS ENGINEERING, PLLC Owner AKAM ASSOCIATES, INC. Contractor HIGHLINE CONSTRUCTION GR | Plumbing work as shown on plans. |
| M00953526 ↗ | 157 HUDSON STREET MANHATTAN | Alteration | Signed-off | 11/20/2023 | 01/08/2025 | Owner AKAM ASSOCIATES, INC. Contractor REIS EY, INC | Structural work as shown on plans. |
| M01096726 ↗ | 18 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 08/23/2024 | 09/27/2024 | Design ANDREW FRANZ ARCHITECT PLLC Contractor LIGHTNING MECHANICAL INC | Mechanical work as shown on plans. |
| M00851324 ↗ | 537 BROADWAY MANHATTAN | Alteration | Signed-off | 05/17/2023 | 07/25/2024 | Design ANDREW FRANZ ARCHITECT PLLC Owner CASTIRON COURT CORP. Contractor ELJIN CONSTRUC OF NEW YOR | General construction work as shown on plans. |
| M00851334 ↗ | 537 BROADWAY MANHATTAN | Alteration | Signed-off | 05/17/2023 | 07/18/2024 | Design ANDREW FRANZ ARCHITECT PLLC Owner CASTIRON COURT CORP. Contractor ELJIN CONSTRUC OF NEW YOR | Mechanical work as shown on plans. |
| M00940536 ↗ | 230 EAST 73 STREET MANHATTAN | Alteration | Signed-off | 11/10/2023 | 04/19/2024 | Design ANDREW FRANZ ARCHITECT PLLC Contractor 2K-CONSTRUCTION CORP | Structural work as shown on the plans. |
| Name | Projects together | Most recent |
|---|---|---|
| ANDREW FRANZ ARCHITECT PLLC | 27 | 06/04/2026 |
| D'ANTONIO CONSULTING ENGINEERS | 3 | 05/19/2025 |
| ABS ENGINEERING, PLLC | 1 | 06/04/2026 |
| BLUESHORE ENGINEERING LLC | 1 | 08/09/2024 |
| H2 CONSULTING PE PC | 1 | 05/19/2025 |
| PLUS GROUP CONSULTING ENGG, PLLC | 1 | 06/21/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| BEDNARZ CONSTRUCTION LLC | 6 | 09/13/2022 |
| 2K-CONSTRUCTION CORP | 3 | 08/09/2024 |
| MACREDDIN PLBG & HTG INC | 3 | 04/21/2022 |
| CHARLES MCGRATH CONST INC | 2 | 06/21/2021 |
| ELJIN CONSTRUC OF NEW YOR | 2 | 05/17/2023 |
| FORTE EXPRESS P & H INC | 2 | 05/19/2025 |
| G&B HOME IMPROVEMENTS INC | 2 | 02/03/2022 |
| R.J.C. MECHANICAL CORP | 2 | 03/31/2025 |
| REIS EY, INC | 2 | 05/19/2025 |
| ANESIS MECHANICAL CORP | 1 | 11/14/2019 |
| HIGHLINE CONSTRUCTION GR | 1 | 06/04/2026 |
| JOE PARZIALE PLUMBING CO | 1 | 12/21/2022 |
| L&J PLG & HTG CO OF NY IN | 1 | 02/01/2021 |
| LIGHTNING MECHANICAL INC | 1 | 08/23/2024 |
| LTB MECHANICAL CORP | 1 | 06/04/2026 |
| NEW YORK PARK PLBG&HTG CO | 1 | 08/09/2024 |
| PACE PLUMBING CORP | 1 | 06/18/2021 |
| PLBG INC | 1 | 12/20/2022 |
| SKINNER PLMNG & HTG CORP | 1 | 06/04/2026 |
| SKINNER PLUMBING & HEATIN | 1 | 06/04/2026 |
| VAN GOGH PAINTERS LLC | 1 | 02/01/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| CASTIRON COURT CORP. | 4 | 03/31/2025 |
| AKAM ASSOCIATES, INC. | 3 | 06/04/2026 |
| CASPER R, CALLEN TRUST | 3 | 06/21/2021 |
| 102 WEST 85TH ST LTD | 2 | 03/17/2022 |
| FLOWER TENANTS CORP | 2 | 02/01/2021 |
| 17 WEST 67 STREET CORP | 1 | 11/14/2019 |
| THE NOHO STAR BUILDING CONDOMINIUM | 1 | 04/08/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 11 | 06/04/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01378577 ↗ | 157 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 06/03/2026 | 08/11/2026 | Design ABS ENGINEERING, PLLC Owner AKAM ASSOCIATES, INC. Contractor HIGHLINE CONSTRUCTION GR | Plumbing work as shown on plans. |
| M00953526 ↗ | 157 HUDSON STREET MANHATTAN | Alteration | Signed-off | 11/20/2023 | 01/08/2025 | Owner AKAM ASSOCIATES, INC. Contractor REIS EY, INC | Structural work as shown on plans. |
| M01096726 ↗ | 18 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 08/23/2024 | 09/27/2024 | Design ANDREW FRANZ ARCHITECT PLLC Contractor LIGHTNING MECHANICAL INC | Mechanical work as shown on plans. |
| M00851324 ↗ | 537 BROADWAY MANHATTAN | Alteration | Signed-off | 05/17/2023 | 07/25/2024 | Design ANDREW FRANZ ARCHITECT PLLC Owner CASTIRON COURT CORP. Contractor ELJIN CONSTRUC OF NEW YOR | General construction work as shown on plans. |
| M00851334 ↗ | 537 BROADWAY MANHATTAN | Alteration | Signed-off | 05/17/2023 | 07/18/2024 | Design ANDREW FRANZ ARCHITECT PLLC Owner CASTIRON COURT CORP. Contractor ELJIN CONSTRUC OF NEW YOR | Mechanical work as shown on plans. |
| M00940536 ↗ | 230 EAST 73 STREET MANHATTAN | Alteration | Signed-off | 11/10/2023 | 04/19/2024 | Design ANDREW FRANZ ARCHITECT PLLC Contractor 2K-CONSTRUCTION CORP | Structural work as shown on the plans. |
| M00851615 ↗ | 537 BROADWAY MANHATTAN | Alteration | Signed-off | 05/17/2023 | 02/26/2024 | Owner CASTIRON COURT CORP. Contractor R.J.C. MECHANICAL CORP | Sprinkler work as shown on plans. |
| M00851340 ↗ | 537 BROADWAY MANHATTAN | Alteration | Signed-off | 05/17/2023 | 01/11/2024 | Owner CASTIRON COURT CORP. Contractor R.J.C. MECHANICAL CORP | Plumbing work as shown on plans. |
| M00916695 ↗ | 157 HUDSON STREET MANHATTAN | Alteration | Signed-off | 08/10/2023 | 08/18/2023 | Design ANDREW FRANZ ARCHITECT PLLC Owner AKAM ASSOCIATES, INC. Contractor FORTE EXPRESS P & H INC | Renovation of two existing bathrooms on existing rough. Cap removed fixtures. |
| M00567290 ↗ | 42 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 02/10/2022 | 03/06/2023 | Design ANDREW FRANZ ARCHITECT PLLC Contractor JOE PARZIALE PLUMBING CO | Alteration to apartment 4NR including three bathrooms, kitchen. |
| M00567162 ↗ | 42 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 02/03/2022 | 11/29/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor G&B HOME IMPROVEMENTS INC | Alteration to apartment 4NR including minor partition work, renovation of 3 bathrooms, kitchen and new windows in existing masonry openings.… |
| M00567316 ↗ | 42 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 02/03/2022 | 11/29/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor G&B HOME IMPROVEMENTS INC | Alteration of apartment 4NR including replacement of existing AC system with new. |
| M08002131 ↗ | 135 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 09/13/2022 | 10/11/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor BEDNARZ CONSTRUCTION LLC | Installation of split AC system to partial 10th floor |
| M00697851 ↗ | 15 WEST 81 STREET MANHATTAN | Alteration | Signed-off | 04/01/2022 | 07/06/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor 2K-CONSTRUCTION CORP | Installation of one PTAC unit. Fee for sleeve cost and plumbing work under corresponding GC and PL applications |
| M00648858 ↗ | 2 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/21/2022 | 06/15/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor BEDNARZ CONSTRUCTION LLC | Interior renovation including partition work and bathrooms |
| M00648865 ↗ | 2 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/21/2022 | 06/13/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor MACREDDIN PLBG & HTG INC | Renovation of two bathrooms and installation of new fixtures |
| M00697878 ↗ | 15 WEST 81 STREET MANHATTAN | Alteration | Signed-off | 04/01/2022 | 05/26/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor PLBG P & H INC | Renovation of apartment 1F. Window replacement. Partition, HVAC, plumbing and electrical system modifications as required for the new layout… |
| M00697913 ↗ | 15 WEST 81 STREET MANHATTAN | Alteration | Signed-off | 04/01/2022 | 05/16/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor 2K-CONSTRUCTION CORP | Renovation of apartment 1F. Window replacement. Minor partition work, HVAC, plumbing and new finishes. No change to use, egress or occupancy… |
| M00638673 ↗ | 102 WEST 85 STREET MANHATTAN | Alteration | Signed-off | 03/17/2022 | 05/13/2022 | Design ANDREW FRANZ ARCHITECT PLLC Owner 102 WEST 85TH ST LTD Contractor BEDNARZ CONSTRUCTION LLC | alteration of apt 11D to include renovation of two bathrooms and minor partition work. |
| M00638682 ↗ | 102 WEST 85 STREET MANHATTAN | Alteration | Signed-off | 03/17/2022 | 05/13/2022 | Design ANDREW FRANZ ARCHITECT PLLC Owner 102 WEST 85TH ST LTD Contractor BEDNARZ CONSTRUCTION LLC | Installation of 1 ton mini-split AC system at apt 11D |
| M00709270 ↗ | 54 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 04/08/2022 | 05/12/2022 | Design ANDREW FRANZ ARCHITECT PLLC Contractor BEDNARZ CONSTRUCTION LLC | Installation of new split HVAC system in private residence. |
| M00542575 ↗ | 134 EAST 13 STREET MANHATTAN | Alteration | Signed-off | 06/18/2021 | 08/09/2021 | Design ANDREW FRANZ ARCHITECT PLLC Owner CASPER R, CALLEN TRUST Contractor PACE PLUMBING CORP | Filing of modification to the plumbing system as per plans filed herewith. No change to use, egress, or occupancy. |
| M00542555 ↗ | 134 EAST 13 STREET MANHATTAN | Alteration | Signed-off | 06/18/2021 | 08/04/2021 | Design ANDREW FRANZ ARCHITECT PLLC Owner CASPER R, CALLEN TRUST Contractor CHARLES MCGRATH CONST INC | Filing interior renovation as per plan filed herewith. No change to use, egress, and occupancy under this application. |
| M00542583 ↗ | 134 EAST 13 STREET MANHATTAN | Alteration | Signed-off | 06/21/2021 | 08/04/2021 | Owner CASPER R, CALLEN TRUST Contractor CHARLES MCGRATH CONST INC | Installation of New air conditioning system as per plan filed herewith. No change in use, egress, and occupancy under this application. |
| M00268915 ↗ | 46 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 02/01/2021 | 05/06/2021 | Design ANDREW FRANZ ARCHITECT PLLC Owner FLOWER TENANTS CORP Contractor L&J PLG & HTG CO OF NY IN | relocation of one bathroom, kitchen and laundry area and installation of one new bathroom and floor drains for condensate. |
| M00270486 ↗ | 46 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 02/01/2021 | 04/26/2021 | Design ANDREW FRANZ ARCHITECT PLLC Owner FLOWER TENANTS CORP Contractor VAN GOGH PAINTERS LLC | INSTALLATION OF 2 NEW HEAT PUMPS, 1 CONDENSER AND ASSOCIATED PIPING AND DUCT WORK. Relocate 1 Toilet exhaust branch duct and add one branch … |
| M00452684 ↗ | 130 WEST 79 STREET MANHATTAN | Alteration | Signed-off | 01/13/2021 | 03/11/2021 | Design ANDREW FRANZ ARCHITECT PLLC Contractor MACREDDIN PLBG & HTG INC | Remove 1 (3) fixture bathroom and (1) kitchen. Renovate (1) existing kitchen and (1) existing bathroom. |
| M00352228 ↗ | 224 MULBERRY STREET MANHATTAN | Alteration | Signed-off | 07/08/2020 | 07/31/2020 | Design ANDREW FRANZ ARCHITECT PLLC Contractor MACREDDIN PLBG & HTG INC | relocate (1) lavatory and add (1) new shower |
| M00284679 ↗ | 32 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 01/06/2020 | 02/27/2020 | Design ANDREW FRANZ ARCHITECT PLLC Contractor BEDNARZ CONSTRUCTION LLC | Replace existing AC system, and domestic kitchen exhaust and associated minor ductwork changes |
| M00259261 ↗ | 17 WEST 67 STREET MANHATTAN | Alteration | Signed-off | 11/14/2019 | 01/23/2020 | Design ANDREW FRANZ ARCHITECT PLLC Owner 17 WEST 67 STREET CORP Contractor HYDROKINETIC PLBG & HTG I | Renovation of one bathroom, replace fixtures and fittings in kind. (1) lavatory, (1) WC, (1) shower |
| Building | Filings | Most Recent |
|---|---|---|
| 157 HUDSON STREET ↗ | 11 | 06/04/2026 |
| 537 BROADWAY ↗ | 5 | 03/31/2025 |
| 18 WEST 20 STREET ↗ | 1 | 08/23/2024 |
| 230 EAST 73 STREET ↗ | 4 | 08/09/2024 |
| 42 WOOSTER STREET ↗ | 4 | 12/21/2022 |
| 15 WEST 81 STREET ↗ | 5 | 12/20/2022 |
| 135 WEST 26 STREET ↗ | 1 | 09/13/2022 |
| 2 5 AVENUE ↗ | 2 | 04/21/2022 |
| 54 BLEECKER STREET ↗ | 1 | 04/08/2022 |
| 102 WEST 85 STREET ↗ | 2 | 03/17/2022 |
| 134 EAST 13 STREET ↗ | 3 | 06/21/2021 |
| 46 WEST 29 STREET ↗ | 2 | 02/01/2021 |
| 130 WEST 79 STREET ↗ | 1 | 01/13/2021 |
| 224 MULBERRY STREET ↗ | 1 | 07/08/2020 |
| 32 WEST 20 STREET ↗ | 1 | 01/06/2020 |
| 17 WEST 67 STREET ↗ | 1 | 11/14/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 06/03/2026 | Metering | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/03/2026 | Interior lighting power | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/03/2026 | Lighting in dwelling units | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/01/2026 | Exhaust and Vent Systems in Plenums and Ducts | 157 HUDSON STREET | Andrew Franz | special |
| 06/01/2026 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 06/01/2026 | Post-installed Anchors | 157 HUDSON STREET | Alex Schwartz | special |
| 06/01/2026 | Energy Code Compliance Inspections | 157 HUDSON STREET | Andrew Franz | progress |
| 06/01/2026 | Duct leakage testing, insulation and design | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/01/2026 | HVAC-R and service water heating system controls | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/01/2026 | HVAC-R and service water piping design and insulation | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/01/2026 | Maintenance information | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/01/2026 | HVAC-R and service water heating equipment | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/01/2026 | Electrical motors and elevators | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 06/01/2026 | Shutoff dampers | 157 HUDSON STREET | Andrew Franz | energy_progress |
| 05/22/2026 | Fire-Resistance Rated Construction | 157 HUDSON STREET | Andrew Franz | progress |
| 05/22/2026 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 03/26/2026 | Final | 157 HUDSON STREET | Andrew Franz | progress |
| 03/26/2026 | Mechanical Systems | 157 HUDSON STREET | Andrew Franz | special |
| 03/26/2026 | Final | 157 HUDSON STREET | Andrew Franz | progress |
| 06/12/2025 | Fire-Resistant Penetrations and Joints | 537 BROADWAY | Andrew Franz | special |
| 06/12/2025 | Sprinkler Systems | 537 BROADWAY | GAETANO D'ANTONIO | special |
| 05/29/2025 | Final | 157 HUDSON STREET | Andrew Franz | progress |
| 05/29/2025 | Fire-Resistance Rated Construction | 157 HUDSON STREET | Andrew Franz | progress |
| 05/29/2025 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 05/19/2025 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 05/19/2025 | Final | 157 HUDSON STREET | Andrew Franz | progress |
| 05/19/2025 | Fire-Resistance Rated Construction | 157 HUDSON STREET | Andrew Franz | progress |
| 04/18/2025 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 04/10/2025 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 08/20/2024 | Fire-Resistant Penetrations and Joints | 230 EAST 73 STREET | Andrew Franz | special |
| 08/15/2024 | Final | 18 WEST 20 STREET | Andrew Franz | progress |
| 08/15/2024 | Fire-Resistant Penetrations and Joints | 18 WEST 20 STREET | Andrew Franz | special |
| 08/15/2024 | Mechanical Systems | 18 WEST 20 STREET | Andrew Franz | special |
| 07/31/2024 | Fire-Resistant Penetrations and Joints | 230 EAST 73 STREET | Andrew Franz | special |
| 06/13/2024 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 03/14/2024 | Fire-Resistant Penetrations and Joints | 230 EAST 73 STREET | Andrew Franz | special |
| 11/28/2023 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 10/25/2023 | Final | 157 HUDSON STREET | GAETANO D'ANTONIO | progress |
| 10/25/2023 | Mechanical Systems | 157 HUDSON STREET | GAETANO D'ANTONIO | special |
| 08/09/2023 | Fire-Resistance Rated Construction | 157 HUDSON STREET | Andrew Franz | progress |
| 08/09/2023 | Final | 157 HUDSON STREET | Andrew Franz | progress |
| 08/09/2023 | Fire-Resistant Penetrations and Joints | 157 HUDSON STREET | Andrew Franz | special |
| 05/11/2023 | Fire-Resistant Penetrations and Joints | 537 BROADWAY | Andrew Franz | special |
| 03/28/2023 | Mechanical Systems | 537 BROADWAY | Andrew Franz | special |
| 03/28/2023 | Final | 537 BROADWAY | Andrew Franz | progress |
| 01/11/2023 | Fire-Resistant Penetrations and Joints | 42 WOOSTER STREET | Andrew Franz | special |
| 01/11/2023 | Energy Code Compliance Inspections | 42 WOOSTER STREET | Andrew Franz | progress |
| 12/20/2022 | Fire-Resistant Penetrations and Joints | 15 WEST 81 STREET | Andrew Franz | special |
| 12/20/2022 | Energy Code Compliance Inspections | 15 WEST 81 STREET | Andrew Franz | progress |
| 11/22/2022 | Fire-Resistant Penetrations and Joints | 42 WOOSTER STREET | Andrew Franz | special |