Whole building & multi-floor projectsBrown Harris Stevens RES. MGT. LLC1 filing
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
RoofMaterial Hoist4p · 5 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Supported Scaffold
MATERIAL HOIST
On file for this project
3 documents · 1 drawing sheet
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
8 documents · 2 drawing sheets
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
BulkheadFacade restoration12p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbing
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
8 documents · 2 drawing sheets
LOCALIZED MASONRY RESTORATION AND ASSOCIATED WATERPROOFING INSTALLATION, REMOVAL OF EXTERIOR DOORS, REMOVAL OF EXTERIOR WINDOWS, REMOVAL AND FLOOR FINISHED. INTERIOR PARTIITION REMOVAL AND INTERIOR DOORS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 5 drawing sheets
MECHANICAL WORK AS PER PLANS FILED HEREWITH. WORK INCLUDES INSTALL CEILING MOUNT IMLINE EXHAUST FANS, FAN COIL UNIT, AND HOT WATER RADIATOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
PenthousePlumbing modificationsUnder Construction2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT
On file for this project
16 documents
MODIFICATIONS TO EXISTING PLUMBING SYSTEMS. APPLICATION ASSOCIATED WITH DOBNOW#: M00510382-I1
On file for this project
6 documents
Floor 2222nd floor amenity space mechanical work2p · 2 filings · 10 docs
ArchitectureDMEquipmentGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
LOCALIZED MASONRY RESTORATION AND ASSOCIATED WATERPROOFING INSTALLATION, REMOVAL OF EXTERIOR DOORS, REMOVAL OF EXTERIOR WINDOWS, REMOVAL AND FLOOR FINISHED. INTERIOR PARTIITION REMOVAL AND INTERIOR DOORS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
MECHANICAL WORK AS PER PLANS FILED HEREWITH. WORK INCLUDES INSTALL CEILING MOUNT IMLINE EXHAUST FANS, FAN COIL UNIT, AND HOT WATER RADIATOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
Floor 21Unit 21, Unit 21B, Unit 21D +27p · 6 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
INTERIOR RENOVATION OF APARTMENT 21GH ON THE 21st floor. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
20 documents
Proposed subsequent filing to replace existing plumbing equipment and all associated appurtenances and install new plumbing fixtures, piping and all associated appurtenances as per plans in conjunction with GC filing M01208359.
On file for this project
10 documents · 1 drawing sheet
HEREBY FILING FOR THE INTERIOR RENOVATION TO APARTMENT 21D. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
29 documents
Latest 3 of 6 filings on this floor.
Floor 20
Floor 19
Floor 18Unit 18HUnder Construction5p · 1 filing · 6 docs
ArchitectureDMElectricalEquipmentGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
MODIFICATION TO EXISTING PLUMBING IN APARTMENT 18H AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 5 drawing sheets
Floor 17Unit 18B1 filing
ArchitectureEquipmentGeneral
Issued Permit Scope
Supported Scaffold
Project M01459861Approved
Interior renovation of the existing apartment #18B. No change to use, egress, or occupancy.
On file for this project
8 drawing sheets
Floor 16Unit 16A, Unit 16C, Unit 16G1p · 4 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Filing interior renovation of unit 16G including minor demo/replacement of interior non rated non load bearing drywall partitions, replace parquet wood tile with new acoustic mats, under new engineered wood plank flooring. no change to use occ. or egress
On file for this project
8 documents
Renovation of kitchen and bathrooms including replacement and relocation of plumbing fixtures related to interior renovation work under job M00676762.
On file for this project
10 documents
Interior renovation including alterations to existing partitions, new partitions, upgrade bathroom, kitchen and finishes, installation of kitchen exhaust. No change to use, egress or occupancy. Plumbing alterations filed under job M00676769.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 15
Floor 14Unit 14D, Unit 14G4p · 4 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
plumbing scope associated with the apartment renovation as shown plans filed herewith. No change to use, egress or occupancy
On file for this project
16 documents
In junction with renovation of existing apartment 14D on the 14th floor. Mechanical work only
On file for this project
7 documents · 2 drawing sheets
In conjunction with renovation of existing apartment of existing apt#14D on the 14th floor. plumbing work only.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 13
Floor 12Unit 12F, Unit 12FE, Unit 12FI2 filings · 19 docs
ArchitectureEquipmentGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
partial interior renovation of existing apartment - kitchen & bathroom remodel - replace appliances & fixtures.
On file for this project
12 documents
partial interior renovation of existing apartment - kitchen & bathroom remodel, minor partition work and general updates to lighting, fixtures, and finishes in the affected areas.
On file for this project
7 documents
Floor 11Unit 11E1 filing · 8 docs
ArchitectureEquipmentGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Modifications to existing plumbing system in apartment #11E, as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents
Floor 10
Floor 9
Floor 8
Floor 7Unit 7B1p · 1 filing · 7 docs
ArchitectureEquipmentGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
PLUMBING WORK IN EXISTING APARTMENT 7B. REMOVE, REPLACE RELOCATE AND INSTALL NEW FIXTURES. NO CHANGE TO EGRESS, OCCUPANCY OR USE.
On file for this project
7 documents · 1 drawing sheet
Floor 6Unit 6C, Unit 6H3 filings · 14 docs
ArchitectureEquipmentGeneral
Issued Permit Scope
General Construction · Supported Scaffold
Partial interior renovation of existing apartment #6H on the 6th floor as per the plan submitted. No change in use, egress, or occupancy.
On file for this project
8 documents
Interior renovation at kitchen of existing class A apartment. No change of existing use, egress or occupancy.
On file for this project
3 documents
Replace existing kitchen appliances with new at the same location.
On file for this project
3 documents · 3 drawing sheets
Floor 5Unit 5A, Unit 5E, Unit 5G5 filings · 20 docs
ArchitectureEquipmentGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
AT APARTMENT 5G, REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND CONNECTING PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
13 documents
AT APARTMENT 5G, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
3 documents
PARTIAL INTERIOR RENOVATION OF APARTMENT 5A (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 4
Floor 3Unit 3E1 filing · 6 docs
ArchitectureEquipmentGeneral
Issued Permit Scope
General Construction · Supported Scaffold
INTERIOR RENOVATION IN APT 3E FILED IN CONJUNCTION WITH PL AS A SUBSEQUENT DOC. NO CHANGE TO USE,OCCUPANCY OR EGRESS.
On file for this project
6 documents
Floor 2Unit 2D, Unit 2H2 filings · 20 docs
ArchitectureEquipmentGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2H ON THE SECOND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
16 documents
Remove, Replace and New Plumbing Fixtures in Apartment 2D. No change to use, egress or occupancy.
On file for this project
9 documents
Floor 1Unit 1A, Unit 1B, Unit 1C +1Under Construction2p · 5 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Plumbing · Sidewalk Shed · Supported Scaffold
Plumbing work filed in conjunction with the apartment renovation as per plan submitted herewith. No change in use, egress, or occupancy under this application.
On file for this project
9 documents
Renovation of Apartment 1A- Demo & installation of bathroom.
On file for this project
8 documents
Renovation of existing Super's Apt # 1F to include removal and installation of partitions, doors and finishes. No change to use egress or occupancy is involved.
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
CellarGarage structural repairs4p · 7 filings · 20 docs
MechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Structural
STRUCTURAL WORK AS PER PLANS FILED HEREWITH. WORK INCLUDES REPAIR OF EXISTING CONCRETE SLAB, WALLS AND COLUMNS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
17 documents
MODIFY EX. LP GAS PIPING TO SUPPLY (2) REPL. BOILERS W/ GAS TRAINS. INSTALL NEW LP GAS PIPING, & NEW GAS METERS TO SUPPLY (2) NEW COGEN UNITS & (1) BOILER W/ GAS TRAINS. CONNECT TO EX. HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
20 documents · 3 drawing sheets
Replacement of existing boilers, burners, breeching, fans, and associated piping / wiring / controls. No change in use, egress or occupancy.
On file for this project
15 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Site & exteriorBrown Harris Stevens RES. MGT. LLC8 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sidewalk Shed · Supported Scaffold
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 6 drawing sheets
EXCAVATION AND REINSTALLATION OF SOIL AND GRAVEL, WATERPROOFING INSTALLATION, CONCRETE INSTALLATION,PERFORATED PIPE, MASONRY REPLACEMENT, AND NEW DRAINAGE MAT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 4 drawing sheets
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
8 documents · 12 drawing sheets
Latest 3 of 8 filings on this floor.