Whole building & multi-floor projects85th EstatesUnder Construction1 filing
CONCRETE REPAIR OF BALCONY CURBS AND SLABS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
23 documents
RoofTemporary suspended scaffold for facade inspection and repaiUnder Construction3p · 4 filings · 20 docs
ArchitectureCivilStructural
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FAADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Edip Ramadani
On file for this project
10 documents · 1 drawing sheet
TEMPORARY INSTALLATION OF CORNER SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Edip Ramadani
On file for this project
12 documents · 2 drawing sheets
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 34Unit 34B2 filings
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
RENOVATION OF EXISTING APARTMENT 34B, AS PER PLANS HEREWITH FILED.
On file for this project
15 documents
legalization of plumbing work as per plans.
On file for this project
10 documents
Floor 33
Floor 32Legalization of plumbing work3p · 1 filing
ArchitectureCivilDMPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
legalization of plumbing work as per plans.
On file for this project
10 documents · 3 drawing sheets
Floor 31Legalization of plumbing work4p · 1 filing
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
legalization of plumbing work as per plans.
On file for this project
10 documents · 4 drawing sheets
Floor 30
Floor 29
Floor 28Unit 28K2 filings
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
REMOVE AND REPLACE PLUMBING FIXTURES AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents
LEGALIZATION OF INTERIOR RENOVATION OF APT 28K. REMOVE MINOR INTERIOR PARTITIONS, REMOVE AND REPLACE KITCHEN AND BATHROOMS PLUMBING FIXTURES, TILE AND FLORING, REMOVE AND REPLACE CEILING LIGHTS AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
7 documents
Floor 27
Floor 26Legalization of plumbing work3p · 1 filing
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
legalization of plumbing work as per plans.
On file for this project
10 documents · 3 drawing sheets
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Legalization of plumbing work1 filing
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
legalization of plumbing work as per plans.
On file for this project
10 documents
Floor 7Unit 7A, Unit 7B2 filings
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
INTERIOR PLUMBING RENOVATION AND COMBINATION OF (2) UNITS A THE 7TH FL (APTS: 7A&B). NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY FILED UNDER THIS APPLICATION.
On file for this project
6 documents
APPLICATION IS FILED FOR THE INTERIOR RENOVATION AND COMBINATION OF (2) UNITS APT 7A & 7B ON THE 7 FL INTO (1) UNIT (2,033SF). NO CHANGE OF USE, EGRESS, BULK OR OCCUPANCY FILED UNDER THIS APPLICATION.
On file for this project
23 documents
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Garage ceiling repairs2p · 2 filings · 20 docs
ArchitectureMechanicalStructural
SLAB REPAIR AT THE PARKING GARAGE LEVEL INCLUDING INSTALLATION OF TEMPORARY SHORING AS INDICATED IN THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
On file for this project
9 documents · 1 drawing sheet
Floor 1Ricee 8, Shake Shack2p · 5 filings · 20 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INVOLVED IN PLUMBING & GENERAL CONSTRUTION WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY & EGRESS.
On file for this project
18 documents
SLAB REPAIR AT THE PARKING GARAGE LEVEL INCLUDING INSTALLATION OF TEMPORARY SHORING AS INDICATED IN THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents · 2 drawing sheets
PARAPET WALL RECONSTRUCTION AND MASONRY WALL REPAIR AT FIRST FLOOR. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
Latest 3 of 5 filings on this floor.
CellarGarage ceiling repairs1p · 1 filing · 14 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
SLAB REPAIR AT THE PARKING GARAGE LEVEL INCLUDING INSTALLATION OF TEMPORARY SHORING AS INDICATED IN THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
Sub-CellarGarage ceiling repairs1p · 1 filing · 14 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
SLAB REPAIR AT THE PARKING GARAGE LEVEL INCLUDING INSTALLATION OF TEMPORARY SHORING AS INDICATED IN THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
Site & exteriorShake Shack, CitizensUnder Construction9 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sidewalk Shed · Sign · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 2 drawing sheets
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
3 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
8 documents · 12 drawing sheets
Latest 3 of 9 filings on this floor.
Filed — no permit issuedFacade, plaza finish, and concrete replacement1 filing · 6 docs
ArchitectureGeneralStructural
waterproofing plaza repairs as per plans filed herewith. granite facade panel to be removed. no change to use, egress or occupancy under this applicaton.
On file for this project
6 documents · 3 drawing sheets