← Back
All parking garages
Spring Creek Towers
186 VANDALIA AVENUE · Spring Creek-Starrett City · BIN 3098297
💬 Discuss this project
1972Year Built
4Stories
G1Building Class
R5Zoning
181,274 sfGross Floor Area
1Units
LL97 Covered11 Open Violations 10 unresolved · 1 paperwork only ▸FDNY Report ↗
All parking garages · Owner of record: BSC HOUSING COMPANY, INC. · 77,700 sf lot · 2.33 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction22p · 1 filing · 6 docs
Floor 4Under Construction18p · 1 filing · 6 docs
Floor 3Under Construction18p · 1 filing · 6 docs
Floor 2Under Construction18p · 1 filing · 6 docs
Floor 1Under Construction55p · 4 filings · 20 docs
Cellar12p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSC HOUSING COMPANY504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIMPSON GUMPERTZ & HEGER105/13/2025
WSP USA411/08/2021
HIRANI ENGINEERING & SURVEYING P.C105/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
O'LEARY CONSTRUCTION INCGeneral Contractor203/21/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
FRESH MEADOW MECH PLBG LLPlumbing207/08/2026
STRUCTURAL PRESERV SYSTEMGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524105/13/2025
PSI AGENCY INC.254309/24/2021
Building Lifecycle
All (45)Filed (6)Permit Issued (6)Signed Off (3)Violation (22)Inspection (2)Special Inspection (6)
02/13/2026
Violation issued (ECB, open)
Construction
12/11/2025
Permit issued — Structural
B01206776-I1-ST
05/13/2025
Filed — Alteration
HEREWITH FILING LOCALIZED CONCRETE REPAIR OF SLABS, COLUMNS AND WALLS FOR GARAGE B PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01206776-I1
05/09/2025
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
05/09/2025
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
04/07/2025
Special inspection requirement — Final
Shahrish Shuvo
02/15/2025
Violation issued (ECB, open)
Construction
12/02/2024
Violation issued (ECB, closed)
Construction
11/09/2024
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/29/2024
Signed off — Alteration
Installation of (4) new gas boilers and their prefabricated enclosure.
B00377182-I1
05/21/2024
Signed off — Alteration
Installation of new gas plumbing piping for related new boilers to be installed.
B00377114-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2023
Violation issued (FDNY_NOV, closed)
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2021
Permit issued — Plumbing
B00377114-I1-PL
11/08/2021
Filed — Alteration
Installation of new gas plumbing piping for related new boilers to be installed.
B00377114-P1
10/22/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/20/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2021
Permit issued — Boiler Equipment
B00377182-I1-BE
09/24/2021
Filed — Alteration
Installation of (4) new gas boilers and their prefabricated enclosure.
B00377182-P1
09/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2021
Permit issued — Boiler Equipment
B00377182-I1-BE
08/18/2020
Permit issued — Plumbing
B00377114-I1-PL
08/12/2020
Filed — Alteration
Installation of (4) new gas boilers and their prefabricated enclosure.
B00377182-I1
08/12/2020
Filed — Alteration
Installation of new gas plumbing piping for related new boilers to be installed.
B00377114-I1
08/07/2020
Signed off — Alteration
B00343132-I1
06/03/2020
Permit issued — Structural
B00343132-I1-ST
05/11/2020
Filed — Alteration
B00343132-I1
06/12/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/06/2010
Violation issued (ECB, closed)
Elevators
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSTRUCTURAL PRESERV SYSTEM12/11/2025
DOB NOWPlumbingSigned-offANTHONY DISABATO11/16/2021
DOB NOWBoiler EquipmentSigned-offMICHAEL BURNS P&H CORP10/14/2021
DOB NOWBoiler EquipmentSigned-offMICHAEL BURNS P&H CORP03/01/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO08/18/2020
DOB NOWStructuralSigned-offO'LEARY CONSTRUCTION INC06/03/2020
1 project · most recent 08/18/2020
General Wiring
FiledStatusContractorScope
08/18/2020CompleteM&T ELECTRICAL LLCGeneral Wiring
1 project · most recent 05/13/2025
Concrete
FiledStatusContractorScope
05/13/2025Permit IssuedSTRUCTURAL PRESERV SYSTEMConcrete
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/22/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/09/2025Concrete - Cast-In-PlaceShahrish Shuvospecial
05/09/2025Post-installed AnchorsShahrish Shuvospecial
04/07/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
04/07/2025FinalShahrish Shuvoprogress
09/24/2021Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/15/2021Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00377182-I1Request digital key ↗
08/15/2026B00377182-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/31/2026B00377114-P1Request digital key ↗
08/31/2026B00377114-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00343132-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026B01206776-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026B00377114-I1Open ↗
08/13/2026B00377182-P1Open ↗
08/13/2026B00377182-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01206776-I1Open ↗
08/26/2026B00377182-P1Open ↗
08/23/2026B00377182-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026B01206776-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00343132-I1Open ↗
08/13/2026B01206776-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00377182-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026B00377114-P1Open ↗
08/13/2026B01206776-I1Open ↗
08/13/2026B00377182-I1Open ↗
Showing 3 of 6 on file for this type