Predominantly retail with other uses
190 UNION AVENUE
BROOKLYN · BIN 3325853
💬 Discuss this project
1965Year Built
2Stories
K4Building Class
C8-2Zoning
38,000 sfGross Floor Area
13Units
4 Open Violations 2 unresolved · 2 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · 51,575 sf lot · 0.74 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 2 filings · 5 docs
Floor 15p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LINDSAY PARK HOUSING3407/08/2026
XINOS CONSTRUCTION1907/08/2026
COURT-WRIGHT GROUP103/22/2026
LINDSAY PARK HGS CORP103/22/2026
ZENITH PROPERTIES1903/21/2026
METRO MANAGEMENT DEVELOPMENT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM ENGINEERING PLLC103/25/2025
YAO W GUO ARCHITECT, PC610/10/2023
ASHRAF CORP112/22/2022
PROSPECT ENGINEERING P.C109/13/2021
NY RESTORATION TECHNOLOGY CORP510/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING203/21/2026
SUPERIOR FIRE CONTROL103/21/2026
XINOS CONSTRUCTION1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor807/08/2026
SUPERIOR FIRE CONTROL INCGeneral Contractor303/21/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
OTEC PLBNG & HTG SVCS INCPlumbing207/08/2026
MCKENNA, KERWINElectrical103/21/2026
SNB ELECTRICAL CONTNG CORElectrical103/22/2026
COURT-WRIGHT GROUP INCGeneral Contractor107/08/2026
ARTECO AND DESIGN RESTORAElectrical103/21/2026
UNITECH DESIGNScaffold107/08/2026
DERRICK RAMDEENElectrical103/21/2026
GLENFORD HARRINGTONElectrical103/21/2026
MARTINEZ, JOSEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLM ENGINEERING PLLC6913103/25/2025
YAO W GUO ARCHITECT P.C.1754510/10/2023
JAY KAVI CORPORATION8500112/22/2022
Building Lifecycle
All (61)Filed (14)Permit Issued (13)Signed Off (2)Violation (18)Inspection (4)Special Inspection (10)
02/17/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY SECTION OF PIPE SCAFFOLDING ON TOP OF THE INSTALLED SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
B00180766-I1
03/25/2025
Filed — Alteration
Direct replacement of two 35 ton rooftop units on existing dunnage and piping as per plans filed herewith.
B01196394-I1
07/26/2024
Violation issued (FDNY_NOV, closed)
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
10/10/2023
Filed — Alteration
Install plumbing as shown on drawings. No change to use, egress or occupancy.
B00605330-P5
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
09/25/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/10/2023
Filed — Alteration
Install plumbing as shown on drawings. No change to use, egress or occupancy.
B00605330-P4
08/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
06/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2023
Permit issued — Plumbing
B00605330-I1-PL
04/13/2023
Filed — Alteration
Install plumbing as shown on drawings. No change to use, egress or occupancy.
B00605330-P3
04/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
03/13/2023
Filed — Alteration
Install plumbing as shown on drawings. No change to use, egress or occupancy.
B00605330-P2
03/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
12/27/2022
Permit issued — Mechanical Systems
B08044179-I1-MS
12/22/2022
Filed — Alteration
INSTALL STORE COMMERCIAL KITCHEN EXHAUST SYSTEM, HOOD AND DUCTWORK AS PER PLANS.
B08044179-I1
11/14/2022
Permit issued — Plumbing
B00605330-I1-PL
04/13/2022
Violation issued (FDNY_NOV, closed)
01/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/27/2021
Violation issued (ECB, closed)
Construction
12/04/2021
Permit issued — Plumbing
B00605330-I1-PL
11/24/2021
Permit issued — General Construction
B00605318-I1-GC
10/21/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Signed off — Alteration
PROPOSE TO INSTALL TWO ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING: (1) SUBWAY; (2) MAMA/ DeLuca's/ FAST, DELICIOUS PIZZA
B00589398-I1
10/19/2021
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
10/18/2021
Filed — Alteration
General construction to remove and install interior partitions and doors as shown on drawings. No change to use, egress or occupancy.
B00605318-I1
10/18/2021
Filed — Alteration
Install plumbing as shown on drawings. No change to use, egress or occupancy.
B00605330-I1
10/04/2021
Special inspection requirement — Energy Code Compliance Inspections
Yao Guo
10/04/2021
Special inspection requirement — Lighting controls
Yao Guo
10/04/2021
Special inspection requirement — Interior lighting power
Yao Guo
10/04/2021
Special inspection requirement — Final
Yao Guo
09/15/2021
Permit issued — Sign
B00589398-I1-SG
09/13/2021
Filed — Alteration
PROPOSE TO INSTALL TWO ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING: (1) SUBWAY; (2) MAMA/ DeLuca's/ FAST, DELICIOUS PIZZA
B00589398-I1
09/07/2021
Special inspection requirement — Final
JUSTIN KIM
03/08/2021
Permit issued — Sidewalk Shed
B00180766-I1-SH
03/08/2021
Permit issued — Supported Scaffold
B00180766-S1-SF
03/06/2020
Permit issued — Sidewalk Shed
B00180766-I1-SH
02/14/2020
Permit issued — Sidewalk Shed
B00180766-I1-SH
02/13/2020
Permit issued — Supported Scaffold
B00180766-S1-SF
02/12/2020
Violation issued (FDNY_ORDER, closed)
01/11/2020
Violation issued (FDNY_NOV, closed)
10/08/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SECTION OF PIPE SCAFFOLDING ON TOP OF THE INSTALLED SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
B00180766-P3
10/08/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SECTION OF PIPE SCAFFOLDING ON TOP OF THE INSTALLED SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
B00180766-P2
08/13/2019
Permit issued — Supported Scaffold
B00180766-S1-SF
08/12/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SECTION OF PIPE SCAFFOLDING ON TOP OF THE INSTALLED SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
B00180766-P1
08/12/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SECTION OF PIPE SCAFFOLDING ON TOP OF THE INSTALLED SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
B00180766-S1
06/18/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SECTION OF PIPE SCAFFOLDING ON TOP OF THE INSTALLED SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
B00180766-I1
06/18/2019
Permit issued — Sidewalk Shed
B00180766-I1-SH
05/10/2019
Violation issued (FDNY_ORDER, closed)
01/17/2013
Violation issued (FDNY_ORDER, closed)
06/12/2012
Violation issued (FDNY_ORDER, closed)
12/02/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2008
Violation issued (FDNY_NOV, closed)
06/18/2007
Violation issued (ECB, closed)
Padlock
12/01/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2003
Violation issued (ECB, closed)
Construction
08/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/13/1997
Violation issued (ECB, open)
Elevators
04/24/1996
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offOTEC PLBNG & HTG SVCS INC06/06/2023
DOB NOWMechanical SystemsPermit IssuedSUPERIOR FIRE CONTROL INC12/27/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC11/14/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC12/04/2021
DOB NOWGeneral ConstructionPermit IssuedCOURT-WRIGHT GROUP INC11/24/2021
DOB NOWSignSigned-offUNITECH DESIGN INC09/15/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP03/08/2021
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP03/08/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP03/06/2020
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/14/2020
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP02/13/2020
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP08/13/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP06/18/2019
BISOTISSUEDXINOS CONSTRUCTION CORP03/08/2021
BISOTISSUEDXINOS CONSTRUCTION CORP02/19/2020
BISOTISSUEDXINOS CONSTRUCTION CORP05/13/2019
BISPLISSUEDP.S.I. MECHANICAL05/20/2016
BISPLISSUEDALJER PLBG & HTG CORP09/22/2014
BISFPISSUEDWILLIAM HIRD & CO INC07/25/2014
BISPLISSUEDALL BORO-PLNG-HTG-COOLG I03/25/2014
BISMHISSUEDALL BORO PLUMBING-HEATING03/25/2014
BISOTISSUEDMW CITI WIDE CONSTR CORP03/17/2014
BISMHISSUEDMW CITI WIDE CONSTR CORP03/17/2014
BISOTISSUEDINTEGRATED CONST SVCS INC03/11/2014
BISOTISSUEDMW CITI WIDE CONSTR CORP02/24/2014
BISEQISSUEDMW CITI WIDE CONSTR CORP02/24/2014
BIS—ISSUEDUNITECH DESIGN INC03/21/2013
BISOTISSUEDUNITECH DESIGN INC03/21/2013
BISPLISSUEDLLOYD G DRUMMOND PLBG&GEN03/04/2013
BISMHISSUEDCONSTRUCTION 6 GENERAL CO02/28/2013
BISPLISSUEDATTACK PLUMBING INC12/06/2012
BISOTISSUEDPTL RENOVATION INC11/23/2012
BISOTISSUEDBENI CONSTRUCTION INC.05/22/2008
BISEQISSUEDKING'S ASSOCIATES INC.03/31/2006
BISOTISSUEDKING'S ASSOCIATES INC.03/31/2006
BISPLISSUEDCHPH CO11/10/2005
BISMHISSUEDWILSON CONST10/21/2005
BISPLISSUEDKIN CHI PLUMBING AND HEATING COR08/18/1995
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/07/1995
BISMHISSUEDHSU & ASSOCIATES, INC.07/28/1995
1 project · most recent 03/25/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2025——Heating and Air Conditioning Systems
Heat / Cool
Trane YCH420DEH*1D3GJ800 35 tons · Rooftop Unit ×2
1 project · most recent 10/10/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/10/2023Signed-offOTEC PLBNG & HTG SVCS INCGas, Water/Sanitary
7 projects · most recent 11/05/2021
General Wiring
FiledStatusContractorScope
11/05/2021Permit IssuedSNB ELECTRICAL CONTNG CORGeneral Wiring
10/28/2021CompleteREGIONAL ELEC'L VOICE &General Wiring
09/21/2021CompleteATMOS ELECTRIC SVCE CORP—
09/21/2021CompleteATMOS ELECTRIC SVCE CORP—
06/17/2019Permit IssuedTOWER ELECTRIC INC.—
09/24/2018CompleteCORE ELECTRICAL CORPGeneral Wiring
09/17/2018CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 10/08/2019
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/08/2019Signed-offXINOS CONSTRUCTION CORPScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/25/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2021Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/11/2023Fire-Resistant Penetrations and JointsYao Guospecial
10/05/2023Fire-Resistant Penetrations and JointsYao Guospecial
08/09/2023Fire-Resistant Penetrations and JointsYao Guospecial
04/12/2023Fire-Resistant Penetrations and JointsYao Guospecial
03/08/2023Fire-Resistant Penetrations and JointsYao Guospecial
10/04/2021Energy Code Compliance InspectionsYao Guoprogress
10/04/2021Lighting controlsYao Guoenergy_progress
10/04/2021Interior lighting powerYao Guoenergy_progress
10/04/2021FinalYao Guoprogress
09/07/2021FinalJUSTIN KIMprogress
▾Documents — 229 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch8
09/01/2026B00589398-I1Request digital key ↗
09/01/2026B00605318-I1Request digital key ↗
08/28/2026B08044179-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00180766-P2Request digital key ↗
09/01/2026B00180766-I1Request digital key ↗
08/15/2026B00180766-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026B00180766-S1Request digital key ↗
08/15/2026B00180766-P3Request digital key ↗
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION16
05/16/2019322059348Open ↗
06/02/2016320922711Open ↗
09/22/2014321201873Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
05/18/2016320922711Open ↗
05/09/2016320922711Open ↗
07/24/2014321201873Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
10/22/2019322059348Open ↗
05/14/2016320922711Open ↗
05/14/2016320922711Open ↗
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
11/23/2018322059348Open ↗
11/23/2018322059348Open ↗
11/23/2018322059348Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00605318-I1Open ↗
08/28/2026B08044179-I1Open ↗
08/27/2026B00605330-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00605330-P4Open ↗
08/31/2026B00605330-P3Open ↗
08/27/2026B00605330-P5Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/12/2014320868192Open ↗
06/11/2014320922089Open ↗
05/30/2014320922711Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/12/2014320868192Open ↗
06/11/2014320922089Open ↗
05/30/2014320922711Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026B00605318-I1Open ↗
08/23/2026B00605318-I1Open ↗
08/23/2026B00589398-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/22/2007310039017Open ↗
▸BISPC FULL REPORT1
10/22/2007310039017Open ↗
▸Trade Schedules & Equipment25
▸BISSELF-CERT PLUMBING NOTICE9
06/05/2014320922089Open ↗
06/13/2013320698152Open ↗
06/10/2013320698152Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
01/24/2017320922711Open ↗
01/24/2017320922711Open ↗
01/24/2017320922711Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING5
07/24/2014321201873Open ↗
07/21/2014321201873Open ↗
05/30/2014320922711Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/18/2016320922711Open ↗
06/11/2014320922089Open ↗
▸BISEQUIPMENT USE PERMITS1
01/24/2017320922711Open ↗
▸Safety & Tenant Protection1
▸BISDS1-Demolition Submittal Certification Form1
06/06/2014320868192Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026B00605318-I1Open ↗
08/28/2026B08044179-I1Open ↗
08/27/2026B00605330-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
05/16/2019322059348Open ↗
06/12/2014320868192Open ↗
06/11/2014320922089Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/22/2007310039017Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/24/2014321201873Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
03/30/2023322059348Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0577BK201
03/27/2023322059348Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
11/23/2018322059348Open ↗
11/23/2018322059348Open ↗
01/24/2017320922711Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
01/17/2017320868174Open ↗
12/07/2016320922711Open ↗
08/20/2013320698152Open ↗
Showing 3 of 5 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
03/24/2023322059348Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/29/2014320922089Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/23/2022322059348Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/24/2023322059348Open ↗
▸Inspections & Test Reports2
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/23/2022322059348Open ↗
▸BISMASONRY1
12/23/2022322059348Open ↗
▸Approvals, Objections & Sign-offs25
▸BISADMINISTRATIVE OBJECTIONS10
07/18/2014321201873Open ↗
06/12/2014320868192Open ↗
06/11/2014320922089Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
04/21/2023322059348Open ↗
01/24/2017320922711Open ↗
01/17/2017320868174Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/17/2017320868174Open ↗
01/17/2017320868174Open ↗
07/18/2014321201873Open ↗
▸BISFINAL1
12/23/2022322059348Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
08/20/2013320698152Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT20
12/09/2019322059348Open ↗
11/23/2018322059348Open ↗
01/17/2017320868174Open ↗
Showing 3 of 20 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/24/2023322059348Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET9
11/23/2018322059348Open ↗
07/21/2014321201873Open ↗
06/12/2014320868192Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION4
12/09/2019322059348Open ↗
05/18/2016320922711Open ↗
05/09/2016320922711Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet2
07/24/2014321201873Open ↗
05/30/2014320922711Open ↗
▸Other Documents5
▸DOB NOWBSA Meeting Minutes/BSA Resolution3
08/13/2026B00180766-I1Open ↗
08/13/2026B00180766-P2Open ↗
08/13/2026B00180766-P1Open ↗
▸BISOP-4 - Special Report2
05/27/2014320726773Open ↗
05/27/2014320726764Open ↗