← Back
Walk-up apt, over six families with stores
190 FLATBUSH AVENUE
BROOKLYN · BIN 3018484
💬 Discuss this project
1920Year Built
4Stories
C7Building Class
R7AZoning
9,884 sfGross Floor Area
9Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: MEO 192 FLATBUSH AVENUE LLC · 3,313 sf lot · 2.98 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 4Under Construction5p · 2 filings · 12 docs
Floor 3Under Construction4p · 1 filing · 6 docs
Floor 2
Floor 14p · 3 filings · 20 docs
Basement1p · 1 filing · 11 docs
1 job · most recent 04/19/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/19/2026Signed-offSJ CONSTR DESIGN INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×4
PUHY-EP96TNU 96,000 BTU · Vrf Outdoor ×2
MITSUBISHI PEFY-P48NMAU 48,000 BTU · Vrf Indoor ×3
MITSUBISHI PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×1
Ventilation
N/A N/A 300 CFM · Ductwork ×20
Nsf Econair 4,500 CFM · Kitchen Exhaust ×1
Twin City Fan BCV-200AIR 4,500 CFM · Kitchen Exhaust ×1
Nca NCA18FA 4,500 CFM · Exhaust Fan ×1
4 jobs · most recent 04/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/29/2026——Gas, Water/Sanitary
04/19/2026Signed-offCROSSFIELD PLBG.&HTGGas, Water/Sanitary
10/09/2025Signed-offHOD PIPING & HEATING CORPGas, Water/Sanitary
09/26/2025Signed-offHOD PIPING & HEATING CORPGas, Water/Sanitary
3 jobs · most recent 03/19/2026
General Wiring
FiledStatusContractorScope
03/19/2026Permit IssuedJEM ELEC'L CONTR. CORPGeneral Wiring
01/28/2026Permit IssuedFALCO ELEC'L SERVICES INCGeneral Wiring
06/21/2024CompleteATMOS ELECTRIC SVCE CORP—
1 job · most recent 04/19/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/19/2026Signed-offCROSSFIELD PLBG.&HTGTenant Protection Plan 72 Hour
Building Lifecycle
All (114)Filed (15)Permit Issued (9)Signed Off (3)Violation (15)Inspection (10)Objection (32)Special Inspection (30)
08/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
YIPENG LUAN
08/31/2026
Special inspection requirement — Ventilation and air distribution system
YIPENG LUAN
08/31/2026
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
08/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
YIPENG LUAN
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
08/31/2026
Special inspection requirement — Mechanical Systems
YIPENG LUAN
08/31/2026
Special inspection requirement — Final
YIPENG LUAN
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2026
Objection raised — Scope
05/04/2026
Objection resolved — Resolved
05/04/2026
Objection raised — Scope
05/04/2026
Objection resolved — Resolved
05/04/2026
Objection raised — Scope
05/04/2026
Objection resolved — Resolved
05/04/2026
Objection raised — Cost
05/04/2026
Objection resolved — Resolved
04/29/2026
Filed — Alteration
Minor partition work with general carpentry in apt 4E. No change to use bulk or egress.
B01386509-S1
04/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YIPENG LUAN
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
YIPENG LUAN
04/19/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN FILED. NO CHANGE OF USE IN EGRESS OR CERTIFICATE OF OCCUPANCY.
B01343595-P3
04/17/2026
Filed — Alteration
Minor partition work with general carpentry in apt 4E. No change to use bulk or egress.
B01386509-I1
04/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/13/2026
Special inspection requirement — Lighting in dwelling units
04/13/2026
Special inspection requirement — Final
04/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YIPENG LUAN
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
04/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
YIPENG LUAN
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
03/27/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN FILED. NO CHANGE OF USE IN EGRESS OR CERTIFICATE OF OCCUPANCY.
B01343595-P2
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
YIPENG LUAN
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/03/2026
Permit issued — Plumbing
B01343595-S1-PL
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2026
Permit issued — Mechanical Systems
B01343595-I1-GC-CX
01/30/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN FILED. NO CHANGE OF USE IN EGRESS OR CERTIFICATE OF OCCUPANCY.
B01343595-P1
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/29/2026
Special inspection requirement — Final
YIPENG LUAN
01/29/2026
Special inspection requirement — Ventilation and air distribution system
YIPENG LUAN
01/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
YIPENG LUAN
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
01/28/2026
Permit issued — Plumbing
B01291140-S1-PL
01/21/2026
Permit issued — Plumbing
B01297376-S1-PL
01/13/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN FILED. NO CHANGE OF USE IN EGRESS OR CERTIFICATE OF OCCUPANCY.
B01343595-I1
01/13/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN FILED. NO CHANGE OF USE IN EGRESS OR CERTIFICATE OF OCCUPANCY.
B01343595-S1
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
11/18/2025
Permit issued — General Construction
B01291140-I1-GC
Latest 60 of 114 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRISTAR MANAGEMENT ASSOCIATES1808/29/2026
PINTCHIK703/22/2026
MEO 192 FLATBUSH AVENUE LLC103/22/2026
192-194 FLATBUSH AVE1203/22/2026
PINTCHIK ASSOCI103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/10/2025$7.7M—192-194 FLATBUSH AVENUE, LLC → MEO 192 FLATBUSH AVENUE LLC$780/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRASSO-MENZIUSO ARCHITECTS704/29/2026
Q & F CONSTRUCTION INC.504/19/2026
PROSPECT ENGINEERING P.C106/26/2024
NICHOLAOS MOSHOPOULOS203/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING203/21/2026
ISEED CONSTRUCTION INC603/21/2026
BMB BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P3 CONSTRUCTION, LLCGeneral Contractor303/21/2026
SJ CONSTR DESIGN INCGeneral Contractor303/21/2026
HOD PIPING & HEATING CORPPlumbing207/08/2026
NYC BEST REMODELING INCGeneral Contractor207/08/2026
CROSSFIELD PLBG.&HTGPlumbing106/02/2026
T.N.T. PLBG & HTG, INCPlumbing107/08/2026
UNITECH DESIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISEED CONSTRUCTION INC8336504/19/2026
GRASSO-MENZIUSO ARCHITECT1279310/09/2025
NKO ARCHITECT PC6811203/22/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG03/03/2026
DOB NOWMechanical SystemsSigned-offSJ CONSTR DESIGN INC02/05/2026
DOB NOWPlumbingSigned-offHOD PIPING & HEATING CORP01/28/2026
DOB NOWPlumbingSigned-offHOD PIPING & HEATING CORP01/21/2026
DOB NOWGeneral ConstructionPermit IssuedNYC BEST REMODELING INC11/18/2025
DOB NOWGeneral ConstructionPermit IssuedNYC BEST REMODELING INC11/13/2025
DOB NOWSignSigned-offUNITECH DESIGN INC07/01/2024
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC04/17/2024
DOB NOWMechanical SystemsSigned-offP3 CONSTRUCTION, LLC03/28/2024
BISPLISSUEDACCURATE MECHANICAL INC06/06/2008
BISPLISSUEDACCURATE MECHANICAL INC06/05/2008
BISOTISSUEDPINTCHIK INC01/14/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/28/2005
BISPLISSUEDACCURATE MECHANICAL INC05/10/2005
BISOTISSUEDPINTCHIK INC01/14/2005
BISOTISSUEDPINTCHIK INC12/09/2004
BISOTISSUEDPINTCHIK INC04/13/2004
BISOTISSUEDPINTCHIK INC10/16/1998
BISPLISSUEDAVON PLBG & HTG INC09/27/1995
BISFPISSUEDMETFLOW FIRE CONTROL LLC07/14/1995
BISPLISSUEDAVON PLBG & HTG INC07/11/1995
BISOTISSUEDLOWE'S WEST INDIAN RESTAURANT07/05/1995
BIS—ISSUEDBLANFORD CONSTRUCTION12/12/1990
BISEQISSUEDBLANFORD CONSTRUCTION12/12/1990
BISEQISSUEDBLANFORD CONSTRUCTION12/10/1990
BIS—ISSUEDBLANFORD CONSTRUCTION12/10/1990
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2024Pass-Final Sign Permit InspectionPassView ↗
07/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/31/2026Tenant Protection Plan ComplianceYIPENG LUANspecial
08/31/2026Ventilation and air distribution systemYIPENG LUANenergy_progress
08/31/2026Energy Code Compliance InspectionsYIPENG LUANprogress
08/31/2026Fire-Resistance Rated ConstructionYIPENG LUANprogress
08/31/2026Fire-Resistant Penetrations and JointsYIPENG LUANspecial
08/31/2026Mechanical SystemsYIPENG LUANspecial
08/31/2026FinalYIPENG LUANprogress
05/07/2026Fire-Resistant Penetrations and Joints—special
04/20/2026Fire-Resistant Penetrations and JointsYIPENG LUANspecial
04/20/2026Energy Code Compliance InspectionsYIPENG LUANprogress
04/20/2026HVAC-R and service water piping design and insulationYIPENG LUANenergy_progress
04/20/2026Tenant Protection Plan ComplianceYIPENG LUANspecial
04/17/2026Tenant Protection Plan Compliance—special
04/13/2026Lighting in dwelling units—energy_progress
04/13/2026Final—progress
04/13/2026Fire-Resistance Rated Construction—progress
04/13/2026Energy Code Compliance Inspections—progress
04/13/2026Fire-Resistant Penetrations and Joints—special
04/09/2026HVAC-R and service water piping design and insulationYIPENG LUANenergy_progress
04/09/2026Fire-Resistant Penetrations and JointsYIPENG LUANspecial
04/09/2026Tenant Protection Plan ComplianceYIPENG LUANspecial
04/09/2026Energy Code Compliance InspectionsYIPENG LUANprogress
03/26/2026Fire-Resistant Penetrations and JointsYIPENG LUANspecial
03/26/2026Tenant Protection Plan ComplianceYIPENG LUANspecial
03/26/2026Energy Code Compliance InspectionsYIPENG LUANprogress
Latest 25 of 42.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/25/2026B01014223-I1Request digital key ↗
08/25/2026B01014223-S1Request digital key ↗
08/24/2026B01070499-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
06/05/2008310015854Open ↗
06/05/2008310015854Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/29/2023301930294Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/25/2026B01014223-S1Open ↗
08/25/2026B01014223-I1Open ↗
08/20/2026B01303414-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026B01343595-I1Open ↗
09/23/2026B01343595-I1Open ↗
09/23/2026B01343595-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026B01343595-I1Open ↗
09/23/2026B01343595-I1Open ↗
09/23/2026B01343595-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPC FULL REPORT1
08/23/2007310015854Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
08/23/2007310015854Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/23/2007310015854Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/23/2007310015854Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/23/2007310015854Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/25/2026B01014223-S1Open ↗
08/25/2026B01014223-I1Open ↗
08/20/2026B01303414-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/23/2007310015854Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
08/23/2007310015854Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/23/2007310015854Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/05/2008310015854Open ↗