199 TAPSCOTT STREET · BIN 3081481
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
28,800 sfGross Floor Area
23Units
LL97 CoveredRent Stabilized7 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 7,467 sf lot · 3.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 3 filings · 20 docs
Floor 19p · 3 filings · 20 docs
Cellar8p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY406/28/2026
PARSONS CONSTRUCTION503/22/2026
NYC PACT PRESERVATION PARTNERS LLC103/22/2026
NYCHA103/21/2026
NYCHA NY HOUSING AUTHORITY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC2203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
GREEN STUDIO203/21/2026
KD DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor904/09/2026
DUAL FUEL PLUBING & HTINGPlumbing407/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor303/21/2026
LIBERTY NY RESTORATION INGeneral Contractor203/21/2026
DUAL FUEL COMPANY LLCGeneral Contractor207/08/2026
ACE GROUP NY CORPGeneral Contractor106/28/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor107/08/2026
A & E PLUMBING CORPPlumbing107/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031107/08/2026
Building Lifecycle
All (140)Filed (17)Permit Issued (16)Signed Off (9)Violation (55)Inspection (11)Objection (2)Special Inspection (30)
07/13/2026
Signed off — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918357-I1
07/10/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931039-I1
07/10/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
07/10/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/08/2026
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918357-P2
06/23/2026
Violation issued (HPD, open)
B
06/16/2026
Violation issued (HPD, open)
B
06/16/2026
Violation issued (HPD, open)
B
05/27/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM EXISTING CHIMNEY
B00926282-I1
05/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00925882-I1
05/19/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B01022416-I1
03/20/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923699-I1
03/18/2026
Permit issued — General Construction
B00918357-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00937699-I1
03/10/2026
Signed off — Alteration
Structural work including reinforcing existing wood joists, steel beam repairs at first floor slab and replacing exterior steel stair at rear yard.
B00911812-I1
03/02/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01262083-I1
12/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
12/19/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
12/19/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
12/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
12/18/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00925882-P2
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/18/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
12/18/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
12/16/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
12/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
12/09/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
12/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
12/09/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
12/08/2025
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B01022416-P1
11/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/22/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00925882-P1
10/10/2025
Violation issued (HPD, closed)
B
10/10/2025
Violation issued (HPD, closed)
B
10/10/2025
Violation issued (HPD, closed)
A
10/10/2025
Violation issued (HPD, closed)
A
07/31/2025
Permit issued — Structural
B00911812-I1-ST
07/31/2025
Permit issued — Sidewalk Shed
B01262083-I1-SH
07/28/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01262083-I1
07/17/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01257167-I1
07/14/2025
Permit issued — Supported Scaffold
B01254142-I1-SF
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/18/2026
DOB NOWStructuralSigned-offFSC D&C LLC07/31/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC07/31/2025
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP07/14/2025
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN07/08/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC07/02/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING07/02/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING07/01/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC06/25/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP08/13/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL08/12/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC07/23/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING07/15/2024
DOB NOWStructuralSigned-offFSC D&C LLC05/30/2024
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING05/16/2024
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC10/11/2019
BISPLISSUEDACE CONTRACTING, INC07/25/2013
BISBLISSUEDACE CONTRACTING, INC07/25/2013
BISEQISSUEDNAVTECH CONSTRUCTION CORP03/29/2011
BISEQISSUEDNAVTECH CONSTRUCTION CORP04/21/2010
BISEQISSUEDPARADISE CONST CO06/09/1997
2 projects · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
10/05/2019Permit IssuedRICHARD NEU—
2 projects · most recent 07/17/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/17/2025——Sidewalk Shed
07/12/2025Permit IssuedACE GROUP NY CORPScaffold
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/16/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/17/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/04/2024Pass-Final PL - UndergroundPassView ↗
09/25/2024Pass-Final PL - UndergroundPassView ↗
09/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
07/10/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
07/10/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
07/10/2026Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
07/10/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
07/10/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/10/2026FinalSAMI HAJJAR P.Eprogress
07/10/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/10/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
07/10/2026VestibulesSAMI HAJJAR P.Eenergy_progress
07/10/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
07/10/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
12/19/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
12/19/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
12/19/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
12/19/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/19/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/19/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/18/2025Tenant Protection Plan Compliance—special
12/18/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
12/18/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/18/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
12/18/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/18/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
12/09/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/09/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
Latest 25 of 58.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
08/26/2026B00911812-I1Request digital key ↗
08/25/2026B00931039-I1Request digital key ↗
08/25/2026B00926282-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00241018-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
08/03/2015320865701Open ↗
09/30/2013320865701Open ↗
06/10/2013320865701Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
07/31/2013320865701Open ↗
03/30/2011320144054Open ↗
04/21/2010320144054Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/25/2026B00926282-I1Open ↗
08/24/2026B00923699-I1Open ↗
08/22/2026B00918357-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026B01022416-I1Open ↗
09/06/2026B00925882-P1Open ↗
09/02/2026B00931039-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026B01022416-I1Open ↗
09/23/2026B01022416-I1Open ↗
09/02/2026B00931039-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
07/31/2013320865701Open ↗
06/23/2011320144054Open ↗
05/23/2011320144054Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/17/2010320144054Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/17/2010320144054Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
08/03/2015320865701Open ↗
10/05/2013320865701Open ↗
09/30/2013320865701Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/05/2013320865701Open ↗
09/30/2013320865701Open ↗
06/10/2013320865701Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/03/2015320865701Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00241018-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/25/2026B00926282-I1Open ↗
08/24/2026B00923699-I1Open ↗
08/22/2026B00918357-P2Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/10/2013320865701Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/17/2010320144054Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/19/2026B01022416-I1Open ↗
08/19/2026B00925882-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/10/2013320865701Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/19/2026B01022416-I1Open ↗
08/13/2026B00918357-I1Open ↗
08/13/2026B00918357-P1Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/23/2011320144054Open ↗
05/23/2011320144054Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/10/2013320865701Open ↗
04/17/2010320144054Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/19/2026B01022416-I1Open ↗
08/13/2026B01022416-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/30/2011320144054Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/10/2013320865701Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
08/03/2015320865701Open ↗
10/05/2013320865701Open ↗
09/30/2013320865701Open ↗
▸BISEFILING COVER SHEET2
06/10/2013320865701Open ↗
04/17/2010320144054Open ↗
▸Other Documents1
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B00926282-P1Open ↗