RoofUnder Construction3p · 5 filings · 20 docs
ArchitectureStructural
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
On file for this project
4 documents · 1 drawing sheet
FACADE REPAIRS FOR EXISTING COMMERCIAL BUILDING AS PER PLANS FILED HEREWITH.
On file for this project
6 documents · 1 drawing sheet
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Jesus Decola
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Penthouse5p · 7 filings · 20 docs
ArchitectureElectricalFire AlarmFire ProtectionGeneralMechanicalStructural
SPRINKLER/STANDPIPE MODIFICATION FOR PENTHOUSE 3 (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH.
On file for this project
39 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 2913p · 1 filing · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
SPRINKLER/STANDPIPE MODIFICATION FOR PENTHOUSE 3 (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH.
On file for this project
39 documents · 13 drawing sheets
Floor 28
Floor 279p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
SPRINKLER/STANDPIPE MODIFICATION FOR PENTHOUSE 3 (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH.
On file for this project
39 documents · 1 drawing sheet
INTERIOR RENOVATION OF EXISTING 27TH FLOOR (26TH FLOOR CONSTRUCTION) COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
HVAD DUCT MODIFICATIONS FOR 27TH FLOOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 26
Floor 25
Floor 245p · 2 filings · 10 docs
ArchitectureDMFire Protection
INTERIOR RENOVATION OF 24TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
SPRINKLER MODIFICATIONS FOR 24TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 23
Floor 22
Floor 21
Floor 201p · 1 filing · 4 docs
Structural
STRUCTURAL MODIFICATIONS FOR NEW OPERABLE PARTITION AND EQUIPMENT FOR 19TH FLOOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 197p · 8 filings · 20 docs
Fire ProtectionGeneralMechanicalStructural
STRUCTURAL SLAB REPAIRS FOR 19TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
INTERIOR RENOVATION OF 19TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS FOR INTERIOR OF 19TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1818p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
INTERIOR RENOVATION OF 18TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 4 drawing sheets
HVAC DUCT MODIFICATIONS FOR 18TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 6 drawing sheets
SPRINKLER MODIFICATIONS FOR 18TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 17
Floor 16Under Construction88p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Plumbing & sprinkler work associated with 16th floor commercial tenant space as per drawings. No change in egress, occupancy or use.
On file for this project
40 documents · 20 drawing sheets
SPRINKLER AND STANDPIPE MODIFICATIONS FOR 16TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
On file for this project
23 documents · 5 drawing sheets
Plumbing & sprinkler work associated with 16th floor commercial tenant space as per drawings. No change in egress, occupancy or use.
On file for this project
17 documents · 4 drawing sheets
Floor 1530p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
SPRINKLER AND STANDPIPE MODIFICATIONS FOR 16TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
On file for this project
23 documents · 1 drawing sheet
Plumbing & sprinkler work associated with 16th floor commercial tenant space as per drawings. No change in egress, occupancy or use.
On file for this project
17 documents · 1 drawing sheet
STANDPIPE MODIFICATIONS FOR 15TH FLOOR ELEVATOR LOBBY AND CORRIDOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
27 documents · 13 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1421p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
SPRINKLER SYSTEM MODIFICATIONS FOR 15TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
On file for this project
19 documents · 1 drawing sheet
SPRINKLER AND STANDPIPE MODIFICATIONS FOR 14TH AND 15TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
On file for this project
22 documents · 10 drawing sheets
SPRINKLER SYSTEM MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM FOR 15TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
On file for this project
26 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 13
Floor 12Under Construction52p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
INTERIOR RENOVATION OF COMMERCIAL SPACE AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
INTERIOR RENOVATION OF 8TH AND 12 FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
On file for this project
30 documents · 15 drawing sheets
SPRINKLER SYSTEM MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM FOR 14TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
On file for this project
19 documents · 3 drawing sheets
Floor 1123p · 7 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
SPRINKLER MODIFICATIONS FOR 11TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
On file for this project
13 documents · 2 drawing sheets
ALTERATION OF 11TH FLOOR EXISTING COMMERCIAL TERRACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
16 documents · 3 drawing sheets
STRUCTURAL MODIFICATIONS FOR 11TH FLOOR EXISTING COMMERCIAL TERRACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 1011p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
SPRINKLER AND STANDPIPE MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM FOR 9TH-11TH FLOOR EXISTING COMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
28 documents · 2 drawing sheets
INTERIOR RENOVATION OF 10TH AND 11TH FLOOR EXISTING COMMERCIAL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 3 drawing sheets
PLUMBING MODIFICATIONS FOR 9TH-11TH FLOOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 9Under Construction32p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingOther
Issued Permit Scope
General Construction
INTERIOR RENOVATION OF TENANT SPACE AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents
INTERIOR RENOVATION OF 18TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
INTERIOR RENOVATION OF 19TH FLOOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
25 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 8Under Construction41p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
INTERIOR RENOVATION OF 8TH AND 12 FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
On file for this project
30 documents · 11 drawing sheets
SPRINKLER MODIFICATIONS FOR 18TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
PLUMBING MODIFICATIONS FOR 9TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 7Under Construction1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Filing application to create openings as shown in drawings. No change in egress, occupancy or use.
On file for this project
5 documents
Floor 6Under Construction21p · 5 filings · 20 docs
ArchitectureGeneralStructural
Issued Permit Scope
General Construction
Filing application to create openings as shown in drawings. No change in egress, occupancy or use.
On file for this project
5 documents
INTERIOR RENOVATION OF 3RD THROUGH 5TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 2 drawing sheets
FILING HEREWITH CHANGE OF USE ON GROUND FLOOR AND MEZZANINE FOR PROPOSED AMENITY CENTER AS PER PLANS FILED HEREWITH.
On file for this project
34 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 5Under Construction32p · 7 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Filing application to create openings as shown in drawings. No change in egress, occupancy or use.
On file for this project
5 documents
INTERIOR RENOVATION OF 3RD THROUGH 5TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 6 drawing sheets
HVAC DUCT MODIFICATIONS FOR 3RD TO 5TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 4Under Construction29p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Filing application to create openings as shown in drawings. No change in egress, occupancy or use.
On file for this project
5 documents
INTERIOR RENOVATION OF 3RD THROUGH 5TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
HVAC DUCT MODIFICATIONS FOR 3RD TO 5TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 3Under Construction22p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
Filing application to create openings as shown in drawings. No change in egress, occupancy or use.
On file for this project
5 documents
HVAC DUCT MODIFICATIONS FOR 3RD TO 5TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
On file for this project
5 documents · 1 drawing sheet
SPRINKLER/STANDPIPE MODIFICATION FOR PENTHOUSE 3 (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH.
On file for this project
39 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 218p · 2 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
FILING HEREWITH CHANGE OF USE ON GROUND FLOOR AND MEZZANINE FOR PROPOSED AMENITY CENTER AS PER PLANS FILED HEREWITH.
On file for this project
34 documents
FILING HEREWITH STRUCTURAL MODIFICATIONS IN CONJUNCTION WITH ALT-CO #M00594591.
On file for this project
28 documents · 1 drawing sheet
Floor 175p · 15 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
INSTALLATION OF NEW CONCRETE PADS, CONCRETE ENCASEMENT, HUNG HVAC SUPPORT, NEW SUMP PIT AND NEW LINTEL IN CELLAR OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
FILING HEREWITH CHANGE OF USE ON GROUND FLOOR AND MEZZANINE FOR PROPOSED AMENITY CENTER AS PER PLANS FILED HEREWITH.
On file for this project
34 documents · 4 drawing sheets
PLUMBING MODIFCATIONS FOR PROPOSED GROUND FLOOR & MEZZANINE AMENITY SPACE IN CONJUNCTION WITH ALT-CO #M00594591.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine42p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
INSTALLATION OF NEW CONCRETE PADS, CONCRETE ENCASEMENT, HUNG HVAC SUPPORT, NEW SUMP PIT AND NEW LINTEL IN CELLAR OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
FILING HEREWITH CHANGE OF USE ON GROUND FLOOR AND MEZZANINE FOR PROPOSED AMENITY CENTER AS PER PLANS FILED HEREWITH.
On file for this project
34 documents · 7 drawing sheets
INTERIOR RENOVATION OF GROUND FLOOR AND MEZZANINE COMMERCIAL SPACE IN CONJUNCTION WITH ALT-CO #M00594591-I1.
On file for this project
8 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Cellar48p · 17 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction
HVAC MODIFICATIONS FOR CELLAR OF EXISTING COMMERCIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
13 documents · 2 drawing sheets
INTERIOR RENOVATION OF CELLAR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
23 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS IN CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-Cellar19p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
PLUMBING MODIFICATIONS FOR CELLAR AND SUB-CELLAR OF EXISTING COMMERCIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 2 drawing sheets
FILING HEREWITH CHANGE OF USE ON GROUND FLOOR AND MEZZANINE FOR PROPOSED AMENITY CENTER AS PER PLANS FILED HEREWITH.
On file for this project
34 documents
Basement2p · 1 filing · 14 docs
ArchitectureStructural
INSTALLATION OF NEW CONCRETE PADS, CONCRETE ENCASEMENT, HUNG HVAC SUPPORT, NEW SUMP PIT AND NEW LINTEL IN CELLAR OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 2 drawing sheets