← Back
Elevator cooperative
2 WEST 67 STREET
MANHATTAN · BIN 1028231
💬 Discuss this project
1919Year Built
15Stories
D4Building Class
R10AZoning
126,557 sfGross Floor Area
59Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 2 WEST 67 STREET CORP · 10,042 sf lot · 12.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 2 filings · 20 docs
Floor 92p · 1 filing · 8 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP507/08/2026
HH BUILDING CONSULTING707/08/2026
WALLACK MANAGEMENT2104/09/2026
DESIGN + URBANISM ARCHITECTURAL404/09/2026
PHOENIX SUTTON STR INC1103/22/2026
2 WEST 67 STREET3003/22/2026
2 WEST 67TH STREET5303/22/2026
OWNER OF 2 WEST 67 ST203/22/2026
DIMITROPOULOS CONSTRUCTION103/22/2026
SIGNATURE AUDIO DESIGN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADVANCED REMODELING SOLUGeneral Contractor1207/08/2026
STEEL SYSTEMS LLCGeneral Contractor507/08/2026
HUDSON GREEN CRAFT LLCGeneral Contractor307/08/2026
DOMA INCGeneral Contractor307/08/2026
DIMITROPOULOS CONST CORPGeneral Contractor307/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
BOBBY J. ENTERPRISE INCGeneral Contractor203/21/2026
PHOENIX SUTTON STR INCGeneral Contractor203/21/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor207/08/2026
WILLIAM L. RUMSEY CONSTRUCTIONGeneral Contractor203/21/2026
ADRIATIC PLBG & HTG CORPPlumbing207/08/2026
MEGA PLBG CORPPlumbing207/08/2026
MOJICA, MONTEElectrical103/21/2026
POWER MASTERS ELEC'L CONTElectrical103/22/2026
XELA ELECTRICAL CORPElectrical103/22/2026
CIMENT, BARRYElectrical103/21/2026
ANTHONY CIRRINCIONEElectrical103/21/2026
CERTIFICATE ONLYElectrical103/21/2026
CARSTENS, KLAUSElectrical103/21/2026
ELENIS ANTONIOSGeneral Contractor103/21/2026
HANJO CONTRACTORS INCGeneral Contractor107/08/2026
BRENDAN REILLYElectrical103/21/2026
LEMX CORPGeneral Contractor107/08/2026
MASTER 2 PLBG HTGGeneral Contractor103/21/2026
APOLLO ELECTRIC NYG, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666207/13/2026
LEO Y LEE ASSOCIATES2481305/06/2025
PHILIBERT ENGINEERING, PC223103/06/2025
GREGORY V. PEROTTO, P.E.947206/18/2024
SANDEEP GUNNALA ENGINEERI8482111/19/2022
MECHANICAL INSPECTIONS, L334408/25/2022
JASON M APTOWITZ CONSULTI5671108/02/2022
CAPOBIANCO ENGINEERING GR6763211/09/2021
ALAN MARGOLIN & ASSOC423204/30/2021
ESNYC CONSULTING INC4099110/02/2020
Building Lifecycle
All (214)Filed (34)Permit Issued (31)Signed Off (20)Facade (FISP) (15)Violation (60)Inspection (10)Objection (14)Special Inspection (30)
07/24/2026
Signed off — Alteration
INTERIOR RENOVATION OF 12B. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01253250-S1
07/24/2026
Signed off — Alteration
INTERIOR RENOVATION OF 12B. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01253250-I1
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
07/21/2026
Special inspection requirement — Lighting in dwelling units
ALEKSANDR LEVIN
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
07/21/2026
Special inspection requirement — Final
ALEKSANDR LEVIN
07/13/2026
Filed — Alteration
INTERIOR RENOVATION OF 12B. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01253250-P2
04/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/06/2026
Signed off — Alteration
Installation of material hoist. Amend #1, change in tieback and material hoist detail. AMEND #2, CHANGE IN HOIST DETAIL
M01197078-I1
03/05/2026
Filed — Alteration
INTERIOR RENOVATION OF 12B. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01253250-P1
03/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/12/2026
Signed off — Alteration
REPLACE EXISTING MAIN ROOF, PENTHOUSE ROOF, AND GROUND FLOOR TERRACE ROOF AND FLASHINGS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01157623-I1
01/26/2026
Permit issued — Plumbing
M01253250-S1-PL
12/03/2025
Filed — Alteration
INTERIOR RENOVATION OF 12B. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01253250-S1
09/11/2025
Permit issued — General Construction
M01253250-I1-GC
08/22/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Energy
08/19/2025
Objection raised — Admin
08/19/2025
Objection raised — Cost
08/14/2025
Signed off — Alteration
M00205585-I1
08/04/2025
Filed — Alteration
INTERIOR RENOVATION OF 12B. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01253250-I1
06/25/2025
Signed off — Alteration
#8859 - Mechanical installation in apartment 2G. No change in egress, use, or occupancy.
M01050569-I1
06/25/2025
Signed off — Alteration
8859 - Minor Plumbing modifications in apartment 2G. No change in egress, use, or occupancy.
M01050557-I1
06/24/2025
Signed off — Alteration
#8859 - Renovation of existing apartment including new windows. No change in egress, use, or occupancy.
M01050545-I1
06/18/2025
Permit issued — General Construction
M01157623-I1-GC
05/08/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
05/08/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
05/06/2025
Filed — Alteration
Installation of material hoist. Amend #1, change in tieback and material hoist detail. AMEND #2, CHANGE IN HOIST DETAIL
M01197078-P2
05/06/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
05/06/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
04/24/2025
Filed — Alteration
Installation of material hoist. Amend #1, change in tieback and material hoist detail. AMEND #2, CHANGE IN HOIST DETAIL
M01197078-P1
04/23/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
04/23/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
03/20/2025
Permit issued — Suspended Scaffold
M01197078-I1-SC
03/18/2025
Filed — Alteration
Installation of material hoist. Amend #1, change in tieback and material hoist detail. AMEND #2, CHANGE IN HOIST DETAIL
M01197078-I1
03/06/2025
Filed — Alteration
REPLACE EXISTING MAIN ROOF, PENTHOUSE ROOF, AND GROUND FLOOR TERRACE ROOF AND FLASHINGS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01157623-I1
10/09/2024
Signed off — Alteration
INTERIOR RENOVATION TO RESIDENTIAL APARTMENT BUILDING LOBBY. GENERAL CONSTRUCTION TO INCLUDE MINOR PARTITION LAYOUT CHANGES AND NEW FINISHES. PLUMBING TO BE FILED UNDER LAA.
M00748488-I1
08/09/2024
Permit issued — Mechanical Systems
M01050569-I1-MS
08/08/2024
Permit issued — General Construction
M01050545-I1-GC
06/25/2024
Objection raised — Scope
06/25/2024
Objection resolved — Addressed
06/24/2024
Objection raised — Scope
06/24/2024
Objection resolved — Addressed
06/21/2024
Objection raised — Admin
06/21/2024
Objection resolved — Addressed
06/18/2024
Filed — Alteration
#8859 - Mechanical installation in apartment 2G. No change in egress, use, or occupancy.
M01050569-I1
06/18/2024
Filed — Alteration
8859 - Minor Plumbing modifications in apartment 2G. No change in egress, use, or occupancy.
M01050557-I1
06/17/2024
Filed — Alteration
#8859 - Renovation of existing apartment including new windows. No change in egress, use, or occupancy.
M01050545-I1
06/03/2024
Permit issued — General Construction
M00748488-I1-GC
05/13/2024
Special inspection requirement — Final
Robert Divilio
05/13/2024
Special inspection requirement — Mechanical Systems
Gregory Perotto
02/27/2024
Permit issued — General Construction
M00748488-I1-GC
09/15/2023
Signed off — Alteration
WINDOW SUPPORT BRACKET AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00772629-I1
08/14/2023
Permit issued — General Construction
M00748488-I1-GC
11/19/2022
Filed — Alteration
INTERIOR RENOVATION TO RESIDENTIAL APARTMENT BUILDING LOBBY. GENERAL CONSTRUCTION TO INCLUDE MINOR PARTITION LAYOUT CHANGES AND NEW FINISHES. PLUMBING TO BE FILED UNDER LAA.
M00748488-I1
11/15/2022
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
Latest 60 of 214 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offADRIATIC PLBG & HTG CORP01/26/2026
DOB NOWGeneral ConstructionSigned-offBOBBY J ENTERPRISE09/11/2025
DOB NOWGeneral ConstructionSigned-offPNA CONTRACTING CORP06/18/2025
DOB NOWSuspended ScaffoldSigned-offPNA CONTRACTING CORP03/20/2025
DOB NOWMechanical SystemsSigned-offDOMA08/09/2024
DOB NOWGeneral ConstructionSigned-offDOMA08/08/2024
DOB NOWGeneral ConstructionSigned-offHUDSON GREEN CRAFT LLC06/03/2024
DOB NOWGeneral ConstructionSigned-offHUDSON GREEN CRAFT LLC02/27/2024
DOB NOWGeneral ConstructionSigned-offHUDSON GREEN CRAFT LLC08/14/2023
DOB NOWStructuralSigned-offHANJO CONTRACTORS08/31/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/22/2022
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/04/2022
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP02/14/2022
DOB NOWGeneral ConstructionSigned-offADVANCED REMODELING SOLU12/06/2021
DOB NOWMechanical SystemsSigned-offADVANCED REMODELING SOLU12/06/2021
DOB NOWPlumbingSigned-offADRIATIC PLBG & HTG CORP10/28/2021
DOB NOWGeneral ConstructionSigned-offARMAND CORPORATION10/08/2021
DOB NOWMechanical SystemsSigned-offADVANCED REMODELING SOLU08/24/2021
DOB NOWGeneral ConstructionSigned-offADVANCED REMODELING SOLU08/24/2021
DOB NOWGeneral ConstructionSigned-offARMAND CORPORATION08/16/2021
DOB NOWMechanical SystemsSigned-offADVANCED REMODELING SOLU08/04/2021
DOB NOWGeneral ConstructionSigned-offLEMX CORP05/26/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC05/13/2021
DOB NOWGeneral ConstructionSigned-offADVANCED REMODELING SOLU05/12/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/01/2021
DOB NOWMechanical SystemsSigned-offWILLIAM L. RUMSEY CONSTRUCTION11/24/2020
DOB NOWPlumbingSigned-offMEGA PLBG CORP10/28/2020
DOB NOWPlumbingSigned-offMEGA PLBG CORP10/06/2020
DOB NOWSupported ScaffoldSigned-offSTEEL SYSTEMS LLC09/27/2019
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC09/23/2019
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC08/07/2019
BISPLISSUEDACCURATE MECHANICAL INC05/10/2022
BISMHISSUEDCM RENOVATION INC12/16/2021
BISOTISSUEDCM RENOVATION INC12/16/2021
BISPLISSUEDSYSTEMS 2000 PLBG SVCS LL08/03/2021
BISOTISSUEDHUDSON GREEN CRAFT LLC02/26/2021
BISOTISSUEDHUDSON GREEN CRAFT LLC02/26/2021
BISMHISSUEDCM RENOVATION INC11/09/2020
BISPLISSUEDACCURATE MECHANICAL INC11/09/2020
BISOTISSUEDCM RENOVATION INC11/06/2020
+ 41 more permits on file
1 project · most recent 07/13/2026
Gas
FiledStatusContractorScope
07/13/2026Signed-offADRIATIC PLBG & HTG CORPGas
18 projects · most recent 06/16/2026
General Wiring
FiledStatusContractorScope
06/16/2026CompletePATERNY ELECTRIC INCGeneral Wiring
02/03/2025CompleteMICHAEL BROS. ELECT. CORPGeneral Wiring
01/24/2024CompleteXELA ELECTRICAL CORPGeneral Wiring
11/02/2022CompleteMARKS ELECTRIC CORPGeneral Wiring
02/21/2022CompleteAE ELECTRIC INCGeneral Wiring
01/23/2022CompletePRESTIGE ELECL CONTG CORPGeneral Wiring
01/20/2022CompleteTOP SHELF ELECTRIC CORP—
10/27/2021CompletePOWER MASTERS ELEC'L CONTGeneral Wiring
06/30/2021CompleteAP ELECTL SER & MAIN INCGeneral Wiring
03/16/2021Permit IssuedNEW PHASE ELEC'L CONTR'S42 meters
02/19/2021CompleteELPO ELECTRICAL CONTG INC—
01/06/2021CompleteD'ALCO ELECTRICAL, INC.General Wiring
11/04/2020CompleteAPOLLO ELECTRIC NYG, INCGeneral Wiring
10/16/2019Permit IssuedL.J.F. & SONS ELECL CONTSGeneral Wiring
09/17/2019CompleteXELA ELECTRICAL CORP—
2 projects · most recent 09/26/2019
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/26/2019Signed-offSTEEL SYSTEMS LLCScaffold
09/20/2019Signed-offSTEEL SYSTEMS LLCSidewalk Shed
1 project · most recent 07/13/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/13/2026Signed-offADRIATIC PLBG & HTG CORPTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/21/2026Energy Code Compliance InspectionsALEKSANDR LEVINprogress
07/21/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/21/2026Lighting in dwelling unitsALEKSANDR LEVINenergy_progress
07/21/2026Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
07/21/2026FinalALEKSANDR LEVINprogress
05/08/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
05/08/2025Post-installed AnchorsLeo Leespecial
05/06/2025Post-installed AnchorsLeo Leespecial
05/06/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/23/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/23/2025Post-installed AnchorsLeo Leespecial
05/13/2024FinalRobert Divilioprogress
05/13/2024Mechanical SystemsGregory Perottospecial
11/15/2022Tenant Protection Plan ComplianceSandeep Gunnalaspecial
08/30/2022Fire-Resistant Penetrations and JointsBRETT POLINSKYspecial
08/25/2022Fire-Resistant Penetrations and JointsBRETT POLINSKYspecial
07/12/2022Structural Steel - DetailsJASON APTOWITZspecial
07/11/2022Structural Steel - WeldingJASON APTOWITZspecial
07/11/2022Structural Stability – Alterations of existing buildingsJASON APTOWITZspecial
07/11/2022FinalJASON APTOWITZprogress
05/31/2022Energy Code Compliance InspectionsRebecca Grunwaldprogress
05/31/2022FinalRebecca Grunwaldprogress
05/31/2022Interior lighting powerRebecca Grunwaldenergy_progress
05/17/2022FinalJOEL PHAGOOprogress
11/12/2021Air barrier - visual inspectionChristopher Capobiancoenergy_progress
Latest 25 of 37.
▾Documents — 987 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch24
09/03/2026M00477709-I1Request digital key ↗
09/03/2026M00477709-P1Request digital key ↗
09/03/2026M00477709-P2Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00374131-I1Request digital key ↗
09/03/2026M00466703-I1Request digital key ↗
08/15/2026M00466703-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00459163-P1Request digital key ↗
09/04/2026M00459163-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00205585-I1Request digital key ↗
09/05/2026M00231415-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00405273-I1Request digital key ↗
08/15/2026M00466697-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00235738-I1Request digital key ↗
▸Applications & Permits204
▸BISWORK PERMIT APPLICATION99
11/09/2020140840865Open ↗
11/09/2020140840865Open ↗
09/16/2020140923017Open ↗
Showing 3 of 99 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION85
02/18/2026123207546Open ↗
10/07/2022140840865Open ↗
09/15/2022140840865Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWLPC Approval/Permit20
09/04/2026M00459163-P1Open ↗
09/04/2026M00459163-I1Open ↗
09/03/2026M00488992-I1Open ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications216
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION129
10/04/2019122986242Open ↗
06/06/2019122728227Open ↗
04/26/2019123191027Open ↗
Showing 3 of 129 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/05/2026M00205585-I1Open ↗
09/05/2026M00231415-I1Open ↗
09/04/2026M00459163-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/20/2026M01050569-I1Open ↗
09/02/2026M00466697-I1Open ↗
09/02/2026M00459163-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/20/2026M01050569-I1Open ↗
09/02/2026M00466697-I1Open ↗
09/02/2026M00459163-P1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/21/2021141001476Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/13/2020140923017Open ↗
04/16/2019140840865Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/21/2021141001476Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/21/2021141001476Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment84
▸BISSELF-CERT PLUMBING NOTICE24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING21
02/05/2021140840865Open ↗
09/16/2020140840865Open ↗
09/16/2020140840865Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
09/16/2020140840865Open ↗
08/01/2019122986242Open ↗
05/15/2019123207546Open ↗
Showing 3 of 21 on file for this type
▸BISEQUIPMENT USE PERMITS8
06/06/2019122728227Open ↗
Showing 1 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
04/18/2024123207546Open ↗
06/06/2019122728227Open ↗
Showing 2 of 8 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
09/16/2020140840865Open ↗
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes7
04/02/2018123207546Open ↗
08/27/2020140923017Open ↗
04/16/2019140840865Open ↗
Showing 3 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
04/27/2018123207546Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWTenant Protection Plan5
09/05/2026M00231415-I1Open ↗
08/13/2026M00205585-I1Open ↗
08/13/2026M00235738-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos54
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/04/2026M00459163-P1Open ↗
09/04/2026M00459163-I1Open ↗
09/03/2026M00488992-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
07/13/2020140923017Open ↗
04/16/2019140840865Open ↗
Showing 2 of 19 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026M01157623-I1Open ↗
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
06/06/2019122728227Open ↗
02/11/2019122986242Open ↗
06/27/2018122986242Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
04/18/2024123207546Open ↗
02/09/2021140923017Open ↗
06/06/2019122728227Open ↗
Showing 3 of 13 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/04/2026M00459163-I1Open ↗
09/03/2026M00488992-I1Open ↗
08/15/2026M00466697-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/09/2021140923017Open ↗
07/13/2020140923017Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY13
05/04/2024123207546Open ↗
04/30/2024123207546Open ↗
04/18/2024123207546Open ↗
Showing 3 of 13 on file for this type
▸BISMECHANICAL SYSTEMS1
12/22/2022140840865Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs104
▸BISLANDMARKS APPROVAL37
04/21/2021141001476Open ↗
07/13/2020140923017Open ↗
04/30/2019140840865Open ↗
Showing 3 of 37 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST36
04/07/2023140840865Open ↗
02/09/2021140923017Open ↗
10/04/2019122986242Open ↗
Showing 3 of 36 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
11/14/2019123207546Open ↗
04/16/2019140840865Open ↗
02/11/2019122986242Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF2
12/27/2022140840865Open ↗
02/09/2021140923017Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
10/29/2018123207546Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership73
▸BISCOST AFFIDAVIT66
04/18/2024123207546Open ↗
04/21/2021141001476Open ↗
02/09/2021140923017Open ↗
Showing 3 of 66 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
10/23/2018123207546Open ↗
Showing 1 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/22/2022140840865Open ↗
▸Filing & Intake Forms114
▸BISADDITIONAL INFORMATION48
11/15/2022140840865Open ↗
10/28/2022140840865Open ↗
10/28/2022140840865Open ↗
Showing 3 of 48 on file for this type
▸BISEFILING COVER SHEET40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISBOROUGH INTAKE FORM22
10/04/2019122986242Open ↗
10/02/2019122986242Open ↗
06/06/2019122728227Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
04/21/2021141001476Open ↗
07/13/2020140923017Open ↗
04/16/2019140840865Open ↗
Showing 3 of 4 on file for this type
▸Other Documents26
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
05/02/2018122214479Open ↗
Showing 1 of 8 on file for this type
▸BISSupporting Document: Fee Exempt4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M01050545-I1Open ↗
08/13/2026M01050569-I1Open ↗
08/13/2026M01050557-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01197078-I1Open ↗
08/13/2026M01197078-P1Open ↗
08/13/2026M01197078-P2Open ↗
▸DOB NOWCalculations3
08/13/2026M01197078-P2Open ↗
08/13/2026M01197078-P1Open ↗
08/13/2026M01197078-I1Open ↗