← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Wavecrest Gardens
20-06 SEAGIRT BOULEVARD · BIN 4440804
💬 Discuss this project
1952Year Built
6Stories
D7Building Class
R5Zoning
242,771 sfGross Floor Area
257Units
LL97 CoveredRent Stabilized4 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: Rockaway One Company · 141,125 sf lot · 1.72 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarPelican Management INC.40p · 1 filing · 20 docs
Site & exteriorCommercial kitchen HVAC and piping1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rockaway One Co303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gerald Caliendo Architects803/06/2023
Robak Architecture102/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gerald J Caliendo Architect1603/21/2026
Pelican Management203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aron ConstructionGeneral Contractor603/21/2026
Cottam Heating & Air Conditspecialty_contractor203/21/2026
Express PL SWR & WTR APlumbing207/08/2026
A J Ianni Electrical ContsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Franklin & Oak5758303/06/2023
J C Professionals1431703/06/2023
Benazzi Engineering5603302/13/2023
Robak Architecture7952102/13/2023
Building Lifecycle
All (95)Filed (9)Permit Issued (5)Signed Off (3)Violation (20)Inspection (6)Objection (26)Special Inspection (26)
05/08/2025
Violation issued (HPD, closed)
A
05/08/2025
Violation issued (HPD, closed)
A
05/08/2025
Violation issued (HPD, closed)
C
05/08/2025
Violation issued (HPD, closed)
A
05/08/2025
Violation issued (HPD, closed)
A
03/24/2024
Violation issued (HPD, closed)
C
03/24/2024
Violation issued (HPD, closed)
C
03/24/2024
Violation issued (HPD, closed)
C
10/13/2023
Signed off — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES & SPRINKLERS . ALSO TO CAP & REMOVE EXISTING WASHERS, DRYERS, AND SLOP SINK.
Q00692522-S1
06/14/2023
Signed off — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES & SPRINKLERS . ALSO TO CAP & REMOVE EXISTING WASHERS, DRYERS, AND SLOP SINK.
Q00692522-I1
04/05/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
03/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Benazzi
03/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
OSAM GAYED
03/13/2023
Special inspection requirement — Energy Code Compliance Inspections
OSAM GAYED
03/13/2023
Special inspection requirement — Interior lighting power
OSAM GAYED
03/13/2023
Special inspection requirement — Lighting controls
OSAM GAYED
03/06/2023
Filed — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES & SPRINKLERS . ALSO TO CAP & REMOVE EXISTING WASHERS, DRYERS, AND SLOP SINK.
Q00692522-P4
03/06/2023
Filed — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES & SPRINKLERS . ALSO TO CAP & REMOVE EXISTING WASHERS, DRYERS, AND SLOP SINK.
Q00692522-P5
03/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
02/24/2023
Signed off — Alteration
Q00808569-I1
02/15/2023
Permit issued — Mechanical Systems
Q00808569-I1-MS
02/13/2023
Filed — Alteration
Q00808569-I1
02/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Benazzi
02/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Robak
02/09/2023
Special inspection requirement — Energy Code Compliance Inspections
David Robak
01/06/2023
Special inspection requirement — Final
David Robak
01/06/2023
Special inspection requirement — Mechanical Systems
David Robak
12/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
OSAM GAYED
12/23/2022
Special inspection requirement — Energy Code Compliance Inspections
OSAM GAYED
12/23/2022
Special inspection requirement — Interior lighting power
OSAM GAYED
12/23/2022
Special inspection requirement — Lighting controls
OSAM GAYED
12/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
09/15/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
09/09/2022
Objection resolved — Addressed
09/09/2022
Objection resolved — Addressed
09/07/2022
Objection resolved — Addressed
09/01/2022
Objection raised — Structural
09/01/2022
Objection raised — Scope
09/01/2022
Objection raised — Scope
08/30/2022
Filed — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES & SPRINKLERS . ALSO TO CAP & REMOVE EXISTING WASHERS, DRYERS, AND SLOP SINK.
Q00692522-P3
08/25/2022
Special inspection requirement — Sprinkler Systems
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
08/17/2022
Permit issued — Sprinklers
Q00692522-S2-EW-SP
08/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/15/2022
Objection raised — Structural
07/15/2022
Objection resolved — Addressed
07/15/2022
Objection raised — Structural
07/15/2022
Objection resolved — Addressed
07/15/2022
Objection raised — Admin
07/15/2022
Objection resolved — Addressed
07/08/2022
Filed — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES & SPRINKLERS . ALSO TO CAP & REMOVE EXISTING WASHERS, DRYERS, AND SLOP SINK.
Q00692522-S2
07/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2022
Filed — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES & SPRINKLERS . ALSO TO CAP & REMOVE EXISTING WASHERS, DRYERS, AND SLOP SINK.
Q00692522-P2
06/21/2022
Filed — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES & SPRINKLERS . ALSO TO CAP & REMOVE EXISTING WASHERS, DRYERS, AND SLOP SINK.
Q00692522-P1
06/14/2022
Special inspection requirement — Interior lighting power
OSAM GAYED
06/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
OSAM GAYED
06/14/2022
Special inspection requirement — Lighting controls
OSAM GAYED
06/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCottam Heating Air Cond02/15/2023
DOB NOWSprinklersPermit IssuedExpress Plumbing SWR & WTR Ma08/17/2022
DOB NOWGeneral ConstructionSigned-offAron Construction06/13/2022
DOB NOWPlumbingSigned-offExpress Plumbing SWR & WTR Ma05/19/2022
DOB NOWGeneral ConstructionSigned-offAron Construction05/06/2022
1 project · most recent 03/06/2023
FiledStatusContractorScope
03/06/2023——13 heads
1 project · most recent 03/06/2023
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
03/06/2023Permit IssuedExpress PL SWR & WTR AGas, Plumbing-Sprinkler, Water/Sanitary
11 projects · most recent 10/15/2021
General Wiring
FiledStatusContractorScope
10/15/2021CompleteLuna NYC ElectricGeneral Wiring
01/27/2020CompleteA J Ianni Electrical ContsGeneral Wiring
01/27/2020CancelledA J Ianni Electrical ContsGeneral Wiring
01/08/2020Permit IssuedVlashava Electric ContractingGeneral Wiring
11/26/2019CompleteA J Ianni Electrical ContsGeneral Wiring
11/26/2019CompleteA J Ianni Electrical ContsGeneral Wiring
08/05/2019CompleteVlashava Electric Contracting—
08/05/2019CompleteVlashava Electric Contracting—
07/14/2019Permit IssuedVlashava Electric ContractingGeneral Wiring
04/05/2019CompleteA J Ianni Electrical ContsGeneral Wiring
02/06/2019CompleteA J Ianni Electrical ContsGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/05/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/15/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
03/13/2023Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
03/13/2023Tenant Protection Plan ComplianceGregory Benazzispecial
03/13/2023Fire-Resistance Rated ConstructionOSAM GAYEDprogress
03/13/2023Energy Code Compliance InspectionsOSAM GAYEDprogress
03/13/2023Interior lighting powerOSAM GAYEDenergy_progress
03/13/2023Lighting controlsOSAM GAYEDenergy_progress
03/06/2023Tenant Protection Plan Compliance—special
02/13/2023Tenant Protection Plan ComplianceGregory Benazzispecial
02/09/2023Fire-Resistant Penetrations and JointsDavid Robakspecial
02/09/2023Energy Code Compliance InspectionsDavid Robakprogress
01/06/2023FinalDavid Robakprogress
01/06/2023Mechanical SystemsDavid Robakspecial
12/23/2022Fire-Resistance Rated ConstructionOSAM GAYEDprogress
12/23/2022Energy Code Compliance InspectionsOSAM GAYEDprogress
12/23/2022Interior lighting powerOSAM GAYEDenergy_progress
12/23/2022Lighting controlsOSAM GAYEDenergy_progress
12/23/2022Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
08/25/2022Sprinkler Systems—special
08/24/2022Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
06/14/2022Interior lighting powerOSAM GAYEDenergy_progress
06/14/2022Fire-Resistance Rated ConstructionOSAM GAYEDprogress
06/14/2022Lighting controlsOSAM GAYEDenergy_progress
06/14/2022Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
06/14/2022Energy Code Compliance InspectionsOSAM GAYEDprogress
06/02/2022Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
Latest 25 of 26.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026Q00692522-P5Request digital key ↗
08/26/2026Q00692522-P2Request digital key ↗
08/26/2026Q00692522-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature14
10/04/2026Q00692522-P2Open ↗
10/04/2026Q00692522-P2Open ↗
10/04/2026Q00692522-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026Q00692522-S2Open ↗
08/13/2026Q00692522-P5Open ↗
08/13/2026Q00692522-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/04/2026Q00692522-P2Open ↗
09/29/2026Q00692522-I1Open ↗
09/29/2026Q00692522-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026Q00692522-P5Open ↗
08/13/2026Q00692522-I1Open ↗
08/13/2026Q00692522-P1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00692522-I1Open ↗