Miscellaneous hospital / health care facility
NH Lenox Health, Greenwich Village
20 7 AVENUE · BIN 1011094
💬 Discuss this project
1963Year Built
6Stories
I9Building Class
C2-6Zoning
153,000 sfGross Floor Area
2Units
LL97 Covered4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: UNSAFE
Miscellaneous hospital / health care facility · Owner of record: LENOX HILL HOSPITAL · 36,147 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 4 filings · 20 docs
Penthouse1p · 1 filing · 20 docs
Floor 614p · 2 filings · 20 docs
Floor 553p · 10 filings · 20 docs
Floor 435p · 8 filings · 20 docs
Floor 33p · 2 filings · 20 docs
Floor 2
Floor 12p · 1 filing · 20 docs
CellarUnder Construction23p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHWELL HEALTH2409/25/2026
NORTHWELL HEALTH LENOX HILL HOSPITA9009/13/2026
LENOX HILL HOSPITAL4803/22/2026
EB PROPERTY MANAGEMENT LL103/22/2026
26 SEVENTH AVENUE SOUTH L103/22/2026
ST VINCENTS HOSPITAL1403/22/2026
KRSTIC ZIVADIH 7TH AVE PL103/22/2026
ST.VINCENT HOSPITAL-LOUIS203/22/2026
ST. VINCENTS HOSPITAL FAC103/22/2026
SAINT VINCENTS HOSPITAL603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN INTEGRATIONS207/21/2026
AKF ENGINEERS, LLP1507/13/2026
LANGAN ENGINEERING206/25/2026
PERKINS EASTMAN512/05/2025
CANY ARCHITECTURE & ENGINEERING DPC112/02/2025
PAMELA A. SMITH709/19/2025
GILSANZ MURRAY STEFICEK LLP510/11/2024
LIRO ENGINEERS, INC.802/27/2023
EWINGCOLE103/23/2022
KZ ENGINEERING, P.C208/21/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UPRIGHT EXPEDITERS6403/21/2026
ALL IN PERMIT CONSULTANTS503/21/2026
SKYLINE ACCESS103/21/2026
SUPPORT BUILDINGS OF NEW YORK503/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
SUPPORT BUILDINGS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL CONSULTING & CONTGeneral Contractor2607/08/2026
CARLITOS CONTRACTING CORPGeneral Contractor1007/08/2026
TURNER CONSTRUCTION COMPANYGeneral Contractor907/08/2026
SIRINA FIRE PROT CORPFire Protection607/08/2026
CAPITAL CONTR P&H CORPPlumbing507/08/2026
NATIONAL SIGN LIGHTINGScaffold407/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor309/25/2026
PROFF ELECTRICAL LLCElectrical103/22/2026
ROTHENBERGER, ROBERTElectrical103/21/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
BERNARD JABLON PLMG CO.,Electrical103/21/2026
ARBRIS CORPGeneral Contractor107/08/2026
SKYLINE RESTORATION INCGeneral Contractor107/08/2026
CARDOZA PLUMBING CORPPlumbing107/08/2026
OLYMPIC PLBG & HTG SVC INPlumbing107/08/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
AMERICON CONSTRUCTION INC.General Contractor108/25/2026
CARDENAS, JUANElectrical103/21/2026
JOSHUA ANDERSONElectrical103/21/2026
LINCRAFT CONTRACTING OF NElectrical103/21/2026
MALDONADO, WElectrical103/21/2026
MANDOR, MElectrical103/21/2026
NJS ELEC'L SERVICES CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CC@A ENGINEERING P.C18542507/13/2026
LANGAN ENG, ENV, SURVEYIN1265206/25/2026
DOMANI INSPECTION SERVICE843112/02/2025
GILSANZ MURRAY STEFICEK240510/11/2024
JACK GREEN ASSOCIATES422405/23/2022
Building Lifecycle
All (300)Filed (49)Permit Issued (54)Signed Off (25)Facade (FISP) (17)Violation (39)Inspection (28)Objection (58)Special Inspection (30)
09/24/2026
Permit issued — Sidewalk Shed
M01418401-I1-SH
08/24/2026
Permit issued — Support of Excavation
M01417486-I1-SE
07/30/2026
Signed off — Alteration
Northwell Greenwich Village: STAT Lab project: modify Plumbing system at portion of existing cellar Lab space to conform with new hospital program, as per plans filed herewith.
M01282947-I1
07/28/2026
Objection resolved — Resolved
07/22/2026
Permit issued — Supported Scaffold
M01418401-S1-SF
07/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01418401-S1
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CHAROULIS CHARALAMBOUS
07/13/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01418401-I1
07/13/2026
Filed — Alteration
Northwell Greenwich Village: STAT Lab project: modify Plumbing system at portion of existing cellar Lab space to conform with new hospital program, as per plans filed herewith.
M01282947-P1
07/13/2026
Permit issued — Sidewalk Shed
M01418401-I1-SH
07/06/2026
Permit issued — Structural
M01199162-I1-GC-CX
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CHAROULIS CHARALAMBOUS
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
06/28/2026
Objection raised — Other
06/25/2026
Filed — Alteration
M01417486-I1
06/16/2026
Special inspection requirement — Subgrade Inspections
Arthur Alzamora
06/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Arthur Alzamora
06/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Arthur Alzamora
06/16/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Arthur Alzamora
06/12/2026
Signed off — Alteration
Northwell Greenwich Village: STAT Lab project: Mechanical systems to remain. Re-balance existing air outlets and remove existing lab fume hood ductwork.
M01282001-I1
06/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/29/2026
Signed off — Alteration
M01281789-I1
05/29/2026
Permit issued — Plumbing
M01282947-I1-PL
05/28/2026
Permit issued — Structural
M01116242-I1-ST
05/27/2026
Signed off — Alteration
REFACE EXISTING MONUMENT GROUND SIGN. SIGN ACCESSORY TO NORTHWELL GREENWICH VILLAGE HOSPITAL.
M01187337-I1
03/16/2026
Signed off — Alteration
Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: modify mechanical systems to conform to new interior modifications as per plans filed herewith.
M00949016-I1
03/13/2026
Special inspection requirement — Mechanical Systems
CHAROULIS CHARALAMBOUS
03/13/2026
Special inspection requirement — Duct leakage testing, insulation and design
CHAROULIS CHARALAMBOUS
03/13/2026
Special inspection requirement — Ventilation and air distribution system
CHAROULIS CHARALAMBOUS
03/13/2026
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
02/19/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
12/12/2025
Signed off — Alteration
Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: modify plumbing & sprinkler systems to conform to new room layouts as per plans filed herewith (Non-CON scope).
M00949025-I1
12/09/2025
Special inspection requirement — Final
SUNG JONG PARK
12/05/2025
Filed — Alteration
REFACE (2) EXISTING ILLUMINATED GROUND SIGN FOR NORTHWELL GREENWICH VILLAGE HOSPITAL TO REPLACE TEMPORARY SIGNS FILED UNDER M01187349 & M01187337.
M01230598-P1
12/04/2025
Special inspection requirement — Final
SUNG JONG PARK
12/02/2025
Filed — Alteration
Local Law 11/98 cycle 9B facade repairs with related parapet extension concrete work,. No change to use, egress or occupancy
M01199162-I1
11/13/2025
Signed off — Alteration
Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: modify plumbing & sprinkler systems to conform to new room layouts as per plans filed herewith (CON scope).
M00924977-I1
11/10/2025
Signed off — Alteration
M01135780-I1
11/10/2025
Objection raised — Admin
11/06/2025
Signed off — Alteration
Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care: rearrange interior non-bearing partitions, install wall & floor finishes, hung ceiling @ portions of Cellar, 4th & 5th floors to accommodate new hospital program.
M00944864-I1
11/06/2025
Permit issued — General Construction
M01281789-I1-GC
11/06/2025
Permit issued — Mechanical Systems
M01282001-I1-MS
10/23/2025
Cycle 9 facade report submitted
10/23/2025
Cycle 9 facade report signed — UNSAFE
10/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/23/2025
Objection resolved — Addressed
10/21/2025
Cycle 9 facade inspection completed
10/21/2025
Objection raised — Cost
10/14/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC09/24/2026
DOB NOWSupport of ExcavationPermit IssuedAMERICON CONSTRUCTION INC.08/24/2026
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC07/22/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC07/13/2026
DOB NOWStructuralPermit IssuedSKYLINE RESTORATION INC07/06/2026
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP05/29/2026
DOB NOWStructuralPermit IssuedCENTRAL CONSULTING & CONT05/28/2026
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSULTING & CONT11/06/2025
DOB NOWMechanical SystemsSigned-offCENTRAL CONSULTING & CONT11/06/2025
DOB NOWSignPermit IssuedNATIONAL MAINTENANCE, INC07/31/2025
DOB NOWSupport of ExcavationSigned-offCENTRAL CONSULTING & CONT06/30/2025
DOB NOWStructuralPermit IssuedCENTRAL CONSULTING & CONT06/27/2025
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC03/19/2025
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC03/19/2025
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC03/14/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP02/25/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP01/21/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC07/08/2024
DOB NOWSprinklersSigned-offCAPITAL CONTR P&H CORP07/05/2024
DOB NOWSprinklersSigned-offCAPITAL CONTR P&H CORP07/05/2024
DOB NOWMechanical SystemsSigned-offCENTRAL CONSULTING & CONT07/03/2024
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSULTING & CONT07/02/2024
DOB NOWStructuralSigned-offCENTRAL CONSULTING & CONT07/02/2024
DOB NOWMechanical SystemsSigned-offCENTRAL CONSULTING & CONT07/02/2024
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSULTING & CONT07/02/2024
DOB NOWStructuralSigned-offCENTRAL CONSULTING & CONT07/02/2024
DOB NOWStructuralSigned-offCENTRAL CONSULTING & CONT06/21/2024
DOB NOWPlumbingSigned-offSIRINA FIRE PROT CORP02/27/2024
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP02/06/2024
DOB NOWSprinklersSigned-offCAPITAL CONTR P&H CORP01/26/2024
DOB NOWPlumbingSigned-offSIRINA FIRE PROT CORP01/26/2024
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSULTING & CONT01/02/2024
DOB NOWStructuralSigned-offCENTRAL CONSULTING & CONT11/30/2023
DOB NOWMechanical SystemsSigned-offCENTRAL CONSULTING & CONT11/29/2023
DOB NOWMechanical SystemsSigned-offCENTRAL CONSULTING & CONT11/09/2023
DOB NOWStructuralSigned-offCENTRAL CONSULTING & CONT10/23/2023
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSULTING & CONT10/17/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP04/04/2022
DOB NOWGeneral ConstructionSigned-offTURNER CONSTRUCTION COMPANY03/30/2022
DOB NOWMechanical SystemsSigned-offTURNER CONSTRUCTION COMPANY03/30/2022
+ 60 more permits on file
1 project · most recent 07/13/2026
Water/Sanitary
FiledStatusContractorScope
07/13/2026Signed-offCAPITAL CONTR P&H CORPWater/Sanitary
12 projects · most recent 05/29/2026
General Wiring
FiledStatusContractorScope
05/29/2026Permit IssuedTOP SHELF ELECTRIC CORP—
08/29/2025CompletePROFF ELECTRICAL LLC—
08/29/2025CompletePROFF ELECTRICAL LLC—
03/18/2025CompletePROFF ELECTRICAL LLC—
11/20/2024Permit IssuedNJS ELEC'L SERVICES CORP.General Wiring
11/07/2024Permit IssuedNJS ELEC'L SERVICES CORP.1 meters, 1 new_meters
05/28/2024Permit IssuedNJS ELEC'L SERVICES CORP.General Wiring
04/04/2022Permit IssuedNJS ELEC'L SERVICES CORP.General Wiring
08/18/2021CompleteNJS ELEC'L SERVICES CORP.General Wiring
08/18/2021CompleteNJS ELEC'L SERVICES CORP.General Wiring
02/19/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
04/12/2019Permit IssuedNJS ELEC'L SERVICES CORP.General Wiring
2 projects · most recent 12/02/2025
Concrete Steel
FiledStatusContractorScope
12/02/2025Permit IssuedSKYLINE RESTORATION INCConcrete
10/11/2024Permit IssuedCENTRAL CONSULTING & CONTSteel, Concrete
1 project · most recent 07/21/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/21/2026Permit IssuedSPRING SCAFFOLDING LLCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
06/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2022Certified Medical Gas - MG - PL - FinishCertifiedView ↗
01/21/2022Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
01/21/2022Certified Medical Gas - MG - PL - TestCertifiedView ↗
01/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
07/16/2026HVAC-R and service water piping design and insulationCHAROULIS CHARALAMBOUSenergy_progress
07/16/2026Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
06/29/2026Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
06/29/2026HVAC-R and service water piping design and insulationCHAROULIS CHARALAMBOUSenergy_progress
06/16/2026Subsurface Investigations (Borings/Test Pits)Arthur Alzamoraspecial
06/16/2026Subgrade InspectionsArthur Alzamoraspecial
06/16/2026Excavations - Sheeting, Shoring, and BracingArthur Alzamoraspecial
06/16/2026Subsurface Conditions – Fill Placement & In-Place DensityArthur Alzamoraspecial
03/13/2026FinalCHAROULIS CHARALAMBOUSprogress
03/13/2026Duct leakage testing, insulation and designCHAROULIS CHARALAMBOUSenergy_progress
03/13/2026Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
03/13/2026Ventilation and air distribution systemCHAROULIS CHARALAMBOUSenergy_progress
12/09/2025FinalSUNG JONG PARKprogress
12/04/2025FinalSUNG JONG PARKprogress
09/15/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
09/10/2025Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
09/10/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
08/21/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
07/18/2025Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
07/18/2025FinalCHAROULIS CHARALAMBOUSprogress
07/18/2025Duct leakage testing, insulation and designCHAROULIS CHARALAMBOUSenergy_progress
07/18/2025Ventilation and air distribution systemCHAROULIS CHARALAMBOUSenergy_progress
06/30/2025Ventilation and air distribution systemCHAROULIS CHARALAMBOUSenergy_progress
06/30/2025Duct leakage testing, insulation and designCHAROULIS CHARALAMBOUSenergy_progress
06/23/2025FinalCHAROULIS CHARALAMBOUSprogress
Latest 25 of 120.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Northwell - Lenox Health Greenwich VillageMedical / Healthcare—
Project M01417486 Alteration · Permit Entire · 06/25/2026
Project M01135780 Alteration · LOC Issued · 12/11/2024
Lenox Health Greenwich VillageMedical / HealthcareCellar, Floors 4, 5
Project M01281789 Alteration · LOC Issued · 09/18/2025
Project M00949016 Alteration · LOC Issued · 11/22/2023
Project M00439609 Alteration · LOC Issued · 03/09/2021
Northwell HealthMedical / HealthcareCellar, Floors 3–5
Project M01282947 Alteration · LOC Issued · 09/18/2025
Project M00949025 Alteration · LOC Issued · 01/02/2024
Project M00924977 Alteration · LOC Issued · 10/18/2023
Northwell Greenwich Village HospitalMedical / Healthcare—
Project M01230598 Alteration · Permit Entire · 06/04/2025
Project M01187349 Alteration · Permit Entire · 03/11/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,536 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch38
09/06/2026M00000968-I1Request digital key ↗
09/06/2026M00072445-I1Request digital key ↗
09/04/2026M00486000-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026M00439583-P1Request digital key ↗
09/02/2026M00431999-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00433573-I1Request digital key ↗
09/04/2026M00439609-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00433573-I1Request digital key ↗
09/04/2026M00439609-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/04/2026M00431794-P1Request digital key ↗
09/04/2026M00431794-I1Request digital key ↗
▸Applications & Permits296
▸BISPLAN / WORK APPROVAL APPLICATION150
09/12/2025121324520Open ↗
07/08/2025121324520Open ↗
06/27/2025121324520Open ↗
Showing 3 of 150 on file for this type
▸BISWORK PERMIT APPLICATION102
11/27/2024121324520Open ↗
01/28/2021123692584Open ↗
02/28/2020123763659Open ↗
Showing 3 of 102 on file for this type
▸DOB NOWLPC Approval/Permit42
09/04/2026M00431794-P1Open ↗
09/04/2026M00431794-I1Open ↗
09/04/2026M00439609-I1Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications430
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION174
02/24/2020123763659Open ↗
01/29/2020123763659Open ↗
01/02/2020123692584Open ↗
Showing 3 of 174 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature64
09/30/2026M00431794-I1Open ↗
09/30/2026M00431794-I1Open ↗
09/30/2026M00431794-I1Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWProgress Inspector Seal & Signature49
09/30/2026M00431794-I1Open ↗
09/23/2026M00923653-I1Open ↗
09/11/2026M01116242-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/04/2026M00431794-I1Open ↗
09/04/2026M00431794-P1Open ↗
09/04/2026M00439609-I1Open ↗
Showing 3 of 47 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment66
▸BISSELF-CERT PLUMBING NOTICE23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
11/28/2018123461878Open ↗
Showing 1 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
09/05/2019123536236Open ↗
01/31/2018122146347Open ↗
01/08/2018122530751Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
12/05/2025121324520Open ↗
08/24/2020123763659Open ↗
08/24/2020123763659Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
10/18/2017122140049Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos92
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/29/2026M00923653-I1Open ↗
08/28/2026M00944864-P1Open ↗
08/28/2026M00944864-I1Open ↗
Showing 3 of 22 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM18
02/21/2020123763659Open ↗
04/02/2019123535852Open ↗
12/21/2018123461878Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)18
01/28/2021123692584Open ↗
Showing 1 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
09/04/2026M00431794-I1Open ↗
09/04/2026M00439609-I1Open ↗
09/02/2026M00684676-I1Open ↗
Showing 3 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance39
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
01/02/2020123692584Open ↗
12/24/2019123763659Open ↗
09/25/2019123535852Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
08/20/2020123763659Open ↗
09/25/2019123535852Open ↗
04/09/2019123461878Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/02/2026M00684676-I1Open ↗
09/02/2026M00684660-I1Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/04/2022123692584Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/04/2022123692584Open ↗
08/20/2020123763659Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPILES: FINAL PILE PLAN/CREOSOTE LETTER1
12/04/2025121324520Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
10/08/2021123692584Open ↗
▸Approvals, Objections & Sign-offs218
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST84
04/04/2022123692584Open ↗
01/12/2021121324520Open ↗
09/10/2020121324520Open ↗
Showing 3 of 84 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter45
09/04/2026M00431794-P1Open ↗
09/04/2026M00431794-I1Open ↗
09/04/2026M00439609-I1Open ↗
Showing 3 of 45 on file for this type
▸BISLANDMARKS APPROVAL40
01/26/2021123692584Open ↗
09/25/2019123535852Open ↗
12/19/2018123461878Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
01/02/2020123692584Open ↗
Showing 1 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
07/08/2025121324520Open ↗
06/27/2025121324520Open ↗
11/29/2017121324520Open ↗
Showing 3 of 13 on file for this type
▸BISCURB CUT (CC) SIGNOFF1
12/05/2025121324520Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
06/07/2023121324520Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
12/05/2025121324520Open ↗
▸Cost, Insurance & Ownership99
▸BISCOST AFFIDAVIT96
08/20/2020123763659Open ↗
01/02/2020123692584Open ↗
12/24/2019123763659Open ↗
Showing 3 of 96 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
01/05/2026121324520Open ↗
06/02/2025121324520Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/31/2022123692584Open ↗
▸Filing & Intake Forms153
▸BISEFILING COVER SHEET66
01/02/2020123692584Open ↗
12/24/2019123763659Open ↗
12/21/2018123535852Open ↗
Showing 3 of 66 on file for this type
▸BISADDITIONAL INFORMATION48
08/12/2025121324520Open ↗
06/02/2020123763659Open ↗
05/16/2019123461878Open ↗
Showing 3 of 48 on file for this type
▸BISBOROUGH INTAKE FORM33
11/27/2024121324520Open ↗
03/04/2020121324520Open ↗
12/09/2019121324520Open ↗
Showing 3 of 33 on file for this type
▸BISeFiling Job Application Cover Sheet6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents45
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION27
12/24/2019123763659Open ↗
06/21/2019123763659Open ↗
11/28/2018123461878Open ↗
Showing 3 of 27 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSupporting Document: Fee Deferment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FILING CLUSTER DETAILS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type