← Back
BuildNYC
Miscellaneous hospital / health care facility
NH Lenox Health, Greenwich Village
20 7TH AVENUE · West Village · BIN 1011094
💬 Discuss this project
1963Year Built
6Stories
I9Building Class
C2-6Zoning
153,000 sfGross Floor Area
2Units
LL97 Covered3 Active Violations 2 unresolved · 1 paperwork only ▸FISP: UNSAFE
Miscellaneous hospital / health care facility · Owner of record: Lenox Hill Hospital · 36,147 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNorthwell Health, Lenox Hill HospitalUnder Construction27p · 5 filings · 19 docs
PenthouseLenox Hill Hospital6p · 2 filings · 17 docs
Floor 6Northwell Health41p · 2 filings · 18 docs
Floor 5Northwell Health, Lenox Hill Hospital183p · 11 filings · 18 docs
Floor 4Northwell Health, Lenox Hill Hospital169p · 11 filings · 18 docs
Floor 3Northwell Health31p · 2 filings · 17 docs
Floor 2
Floor 1
CellarNorthwell Health, Lenox Hill HospitalUnder Construction159p · 12 filings · 17 docs
Site & exteriorLenox Hill Hospital, Northwell HealthUnder Construction45p · 11 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Northwell Health Lenox Hill Hospita12110/04/2026
Lenox Hill Hospital4503/22/2026
NS-Lij Health System Physical A4403/21/2026
Nslij2003/21/2026
St Vincents Hospital1703/21/2026
North Shore Lij Health System303/21/2026
NYC Department of Housing Preservation and Development103/21/2026
7th Ave Playhouse103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Urban Integrations309/21/2026
360 Engineering109/21/2026
AKF Engineers1507/13/2026
Langan Engineering206/25/2026
Perkins Eastman512/05/2025
Cany Architecture & Engineering112/02/2025
Pamela A. Smith709/19/2025
Gilsanz Murray Steficek510/11/2024
Liro Engineers802/27/2023
Ewingcole103/23/2022
KZ Engineering208/21/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Upright Expediters6403/21/2026
All in Permit Consultants503/21/2026
Skyline Access103/21/2026
Support Buildings of New York503/21/2026
Synergy Building Consultants203/21/2026
Support Buildings503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Consulting & ContGeneral Contractor2607/08/2026
Carlitos ContractingScaffold1007/08/2026
Turner Construction CompanyGeneral Contractor907/08/2026
Sirina Fire ProtectionFire Protection607/08/2026
Capital Contracting P&HPlumbing507/08/2026
National MaintenanceSign hanger407/08/2026
Spring ScaffoldingScaffold309/25/2026
Stanco System Electrical ContElectrical103/21/2026
Abco-Peerless SprinklerFire Protection107/08/2026
Cardoza PlumbingPlumbing107/08/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
Par Plumbing CoPlumbing107/08/2026
ArbrisScaffold107/08/2026
Department of Hous Pres & DevelopmentElectrical103/21/2026
I. M. ElectricElectrical103/21/2026
NJS Electrical ServicesElectrical103/22/2026
Proff ElectricalElectrical103/22/2026
Americon ConstructionGeneral Contractor108/25/2026
Skyline Restorationspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
360 Engineering7496109/21/2026
CC@A Engineering18542507/13/2026
Langan Engineering, Env, Surveyin1265206/25/2026
Domani Inspection Service843112/02/2025
Gilsanz Murray Steficek240510/11/2024
Jack Green Associates422405/23/2022
Building Lifecycle
All (300)Filed (51)Permit Issued (54)Signed Off (25)Facade (FISP) (17)Violation (34)Inspection (31)Objection (58)Special Inspection (30)
09/24/2026
Permit issued — Sidewalk Shed
M01418401-I1-SH
09/21/2026
Filed — Alteration
Local Law 11/98 cycle 9B facade repairs with related parapet extension concrete work,. No change to use, egress or occupancy
M01199162-S1
09/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01418401-P1
09/21/2026
Special inspection requirement — Post-installed Anchors
PETER FOSTER
09/21/2026
Special inspection requirement — Post-installed anchors in masonry
PETER FOSTER
08/24/2026
Permit issued — Support of Excavation
M01417486-I1-SE
07/30/2026
Signed off — Alteration
Northwell Greenwich Village: STAT Lab project: modify Plumbing system at portion of existing cellar Lab space to conform with new hospital program, as per plans filed herewith.
M01282947-I1
07/28/2026
Objection resolved — Resolved
07/22/2026
Permit issued — Supported Scaffold
M01418401-S1-SF
07/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01418401-S1
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CHAROULIS CHARALAMBOUS
07/13/2026
Filed — Alteration
Northwell Greenwich Village: STAT Lab project: modify Plumbing system at portion of existing cellar Lab space to conform with new hospital program, as per plans filed herewith.
M01282947-P1
07/13/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01418401-I1
07/13/2026
Permit issued — Sidewalk Shed
M01418401-I1-SH
07/06/2026
Permit issued — Structural
M01199162-I1-GC-CX
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CHAROULIS CHARALAMBOUS
06/28/2026
Objection raised — Other
06/25/2026
Filed — Alteration
M01417486-I1
06/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Arthur Alzamora
06/16/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Arthur Alzamora
06/16/2026
Special inspection requirement — Subgrade Inspections
Arthur Alzamora
06/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Arthur Alzamora
06/12/2026
Signed off — Alteration
Northwell Greenwich Village: STAT Lab project: Mechanical systems to remain. Re-balance existing air outlets and remove existing lab fume hood ductwork.
M01282001-I1
06/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/29/2026
Signed off — Alteration
M01281789-I1
05/29/2026
Permit issued — Plumbing
M01282947-I1-PL
05/28/2026
Permit issued — Structural
M01116242-I1-ST
05/27/2026
Signed off — Alteration
REFACE EXISTING MONUMENT GROUND SIGN. SIGN ACCESSORY TO NORTHWELL GREENWICH VILLAGE HOSPITAL.
M01187337-I1
03/16/2026
Signed off — Alteration
Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: modify mechanical systems to conform to new interior modifications as per plans filed herewith.
M00949016-I1
03/13/2026
Special inspection requirement — Duct leakage testing, insulation and design
CHAROULIS CHARALAMBOUS
03/13/2026
Special inspection requirement — Mechanical Systems
CHAROULIS CHARALAMBOUS
03/13/2026
Special inspection requirement — Ventilation and air distribution system
CHAROULIS CHARALAMBOUS
03/13/2026
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
02/19/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
12/12/2025
Signed off — Alteration
Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: modify plumbing & sprinkler systems to conform to new room layouts as per plans filed herewith (Non-CON scope).
M00949025-I1
12/09/2025
Special inspection requirement — Final
SUNG JONG PARK
12/05/2025
Filed — Alteration
REFACE (2) EXISTING ILLUMINATED GROUND SIGN FOR NORTHWELL GREENWICH VILLAGE HOSPITAL TO REPLACE TEMPORARY SIGNS FILED UNDER M01187349 & M01187337.
M01230598-P1
12/04/2025
Special inspection requirement — Final
SUNG JONG PARK
12/02/2025
Filed — Alteration
Local Law 11/98 cycle 9B facade repairs with related parapet extension concrete work,. No change to use, egress or occupancy
M01199162-I1
11/13/2025
Signed off — Alteration
Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: modify plumbing & sprinkler systems to conform to new room layouts as per plans filed herewith (CON scope).
M00924977-I1
11/12/2025
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
11/12/2025
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
11/12/2025
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
11/10/2025
Signed off — Alteration
M01135780-I1
11/10/2025
Objection raised — Admin
11/06/2025
Signed off — Alteration
Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care: rearrange interior non-bearing partitions, install wall & floor finishes, hung ceiling @ portions of Cellar, 4th & 5th floors to accommodate new hospital program.
M00944864-I1
11/06/2025
Permit issued — Mechanical Systems
M01282001-I1-MS
11/06/2025
Permit issued — General Construction
M01281789-I1-GC
10/23/2025
Cycle 9 facade report submitted
10/23/2025
Cycle 9 facade report signed — UNSAFE
10/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/23/2025
Objection resolved — Addressed
10/21/2025
Cycle 9 facade inspection completed
10/21/2025
Objection raised — Cost
10/14/2025
Objection resolved — Addressed
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding09/24/2026
DOB NOWSupport of ExcavationPermit IssuedAmericon Construction08/24/2026
DOB NOWSupported ScaffoldPermit IssuedSpring Scaffolding07/22/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding07/13/2026
DOB NOWStructuralPermit IssuedSkyline Restoration07/06/2026
DOB NOWPlumbingSigned-offCapital Contracting P&H05/29/2026
DOB NOWStructuralPermit IssuedCentral Consulting & Cont05/28/2026
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont11/06/2025
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont11/06/2025
DOB NOWSignPermit IssuedNational Maintenance07/31/2025
DOB NOWSupport of ExcavationSigned-offCentral Consulting & Cont06/30/2025
DOB NOWStructuralPermit IssuedCentral Consulting & Cont06/27/2025
DOB NOWSignSigned-offNational Maintenance03/19/2025
DOB NOWSignSigned-offNational Maintenance03/19/2025
DOB NOWSignSigned-offNational Maintenance03/14/2025
DOB NOWSprinklersSigned-offSirina Fire Protection02/25/2025
DOB NOWSprinklersSigned-offSirina Fire Protection01/21/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration07/08/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H07/05/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H07/05/2024
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont07/03/2024
DOB NOWStructuralSigned-offCentral Consulting & Cont07/02/2024
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont07/02/2024
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont07/02/2024
DOB NOWStructuralSigned-offCentral Consulting & Cont07/02/2024
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont07/02/2024
DOB NOWStructuralSigned-offCentral Consulting & Cont06/21/2024
DOB NOWSprinklersSigned-offSirina Fire Protection02/27/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H02/06/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H01/26/2024
DOB NOWSprinklersSigned-offSirina Fire Protection01/26/2024
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont01/02/2024
DOB NOWStructuralSigned-offCentral Consulting & Cont11/30/2023
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont11/29/2023
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont11/09/2023
DOB NOWStructuralSigned-offCentral Consulting & Cont10/23/2023
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont10/17/2023
DOB NOWSprinklersSigned-offSirina Fire Protection04/04/2022
DOB NOWGeneral ConstructionSigned-offTurner Construction Company03/30/2022
DOB NOWMechanical SystemsSigned-offTurner Construction Company03/30/2022
+ 60 more permits on file
1 project · most recent 07/13/2026
Water/Sanitary
FiledStatusContractorScope
07/13/2026Signed-offCapital Contracting P&HWater/Sanitary
12 projects · most recent 05/29/2026
General Wiring
FiledStatusContractorScope
05/29/2026Permit IssuedTop Shelf Electric—
08/29/2025CompleteProff Electrical—
08/29/2025CompleteProff Electrical—
03/18/2025CompleteProff Electrical—
11/20/2024Permit IssuedNJS Electrical ServicesGeneral Wiring
11/07/2024Permit IssuedNJS Electrical Services1 meters, 1 new_meters
05/28/2024Permit IssuedNJS Electrical ServicesGeneral Wiring
04/04/2022Permit IssuedNJS Electrical ServicesGeneral Wiring
08/18/2021CompleteNJS Electrical ServicesGeneral Wiring
08/18/2021CompleteNJS Electrical ServicesGeneral Wiring
02/19/2021CompleteE-J Electric Installation CoGeneral Wiring
04/12/2019Permit IssuedNJS Electrical ServicesGeneral Wiring
2 projects · most recent 09/21/2026
Concrete Steel
FiledStatusContractorScope
09/21/2026Permit IssuedSkyline RestorationConcrete
10/11/2024Permit IssuedCentral Consulting & ContSteel, Concrete
1 project · most recent 09/21/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/21/2026Permit IssuedSpring ScaffoldingScaffold, Sidewalk Shed
1 project · most recent 09/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/21/2026Permit IssuedSkyline RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
06/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/12/2025Certified Medical Gas - MG - PL - FinishCertifiedView ↗
11/12/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
11/12/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
10/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2022Certified Medical Gas - MG - PL - FinishCertifiedView ↗
01/21/2022Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
01/21/2022Certified Medical Gas - MG - PL - TestCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 122
DateRequirementInspectorRole
09/21/2026Post-installed AnchorsPETER FOSTERspecial
09/21/2026Post-installed anchors in masonryPETER FOSTERspecial
07/16/2026HVAC-R and service water piping design and insulationCHAROULIS CHARALAMBOUSenergy_progress
07/16/2026Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
06/29/2026HVAC-R and service water piping design and insulationCHAROULIS CHARALAMBOUSenergy_progress
06/29/2026Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
06/16/2026Subsurface Conditions – Fill Placement & In-Place DensityArthur Alzamoraspecial
06/16/2026Excavations - Sheeting, Shoring, and BracingArthur Alzamoraspecial
06/16/2026Subgrade InspectionsArthur Alzamoraspecial
06/16/2026Subsurface Investigations (Borings/Test Pits)Arthur Alzamoraspecial
03/13/2026FinalCHAROULIS CHARALAMBOUSprogress
03/13/2026Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
03/13/2026Ventilation and air distribution systemCHAROULIS CHARALAMBOUSenergy_progress
03/13/2026Duct leakage testing, insulation and designCHAROULIS CHARALAMBOUSenergy_progress
12/09/2025FinalSUNG JONG PARKprogress
12/04/2025FinalSUNG JONG PARKprogress
09/15/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
09/10/2025Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
09/10/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
08/21/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
07/18/2025Duct leakage testing, insulation and designCHAROULIS CHARALAMBOUSenergy_progress
07/18/2025FinalCHAROULIS CHARALAMBOUSprogress
07/18/2025Ventilation and air distribution systemCHAROULIS CHARALAMBOUSenergy_progress
07/18/2025Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
06/30/2025Ventilation and air distribution systemCHAROULIS CHARALAMBOUSenergy_progress
Latest 25 of 122.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lenox Hill HospitalMedical / HealthcareCellar, Floors 1–5, Penthouse, Roof
Project M01418401 Alteration · Permit Entire · 07/13/2026
Project M01071999 Alteration · Permit Entire · 06/26/2024
Project M00944864 Alteration · LOC Issued · 10/25/2023
Project M00923711 Alteration · LOC Issued · 10/23/2023
Project M00923653 Alteration · LOC Issued · 09/27/2023
Project M00917131 Alteration · LOC Issued · 09/26/2023
Project M00684660 Alteration · LOC Issued · 03/23/2022
Project M00684676 Alteration · LOC Issued · 03/17/2022
Project M00684715 Alteration · LOC Issued · 03/17/2022
Project M00684723 Alteration · LOC Issued · 03/17/2022
Project M00431794 Alteration · LOC Issued · 02/26/2021
Project M00072445 Alteration · LOC Issued · 08/21/2018
Northwell HealthMedical / HealthcareCellar, Floors 3–6, Roof
Project M01417486 Alteration · Permit Entire · 06/25/2026
Project M01199162 Alteration · Permit Entire · 12/02/2025
Project M01281789 Alteration · LOC Issued · 09/18/2025
Project M01282001 Alteration · LOC Issued · 09/18/2025
Project M01282947 Alteration · LOC Issued · 09/18/2025
Project M01230598 Alteration · Permit Entire · 06/04/2025
Project M01187337 Alteration · LOC Issued · 03/11/2025
Project M01187343 Alteration · Permit Entire · 03/11/2025
Project M01187349 Alteration · Permit Entire · 03/11/2025
Project M01135780 Alteration · LOC Issued · 12/11/2024
Project M01116242 Alteration · Permit Entire · 10/11/2024
Project M00949025 Alteration · LOC Issued · 01/02/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,543 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch38
09/06/2026M00000968-I1Request digital key ↗
09/06/2026M00072445-I1Request digital key ↗
09/04/2026M00486000-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026M00439583-P1Request digital key ↗
09/02/2026M00431999-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00433573-I1Request digital key ↗
09/04/2026M00439609-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00433573-I1Request digital key ↗
09/04/2026M00439609-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/04/2026M00431794-I1Request digital key ↗
09/04/2026M00431794-P1Request digital key ↗
▸Applications & Permits296
▸BISPLAN / WORK APPROVAL APPLICATION150
09/12/2025121324520Open ↗
07/08/2025121324520Open ↗
06/27/2025121324520Open ↗
Showing 3 of 150 on file for this type
▸BISWORK PERMIT APPLICATION102
11/27/2024121324520Open ↗
01/28/2021123692584Open ↗
02/28/2020123763659Open ↗
Showing 3 of 102 on file for this type
▸DOB NOWLPC Approval/Permit42
09/04/2026M00431794-P1Open ↗
09/04/2026M00431794-I1Open ↗
09/04/2026M00439609-I1Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications434
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION174
02/24/2020123763659Open ↗
01/29/2020123763659Open ↗
01/02/2020123692584Open ↗
Showing 3 of 174 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature66
10/05/2026M01199162-S1Open ↗
10/05/2026M01199162-S1Open ↗
09/30/2026M00431794-I1Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
10/05/2026M01199162-S1Open ↗
10/05/2026M01418401-P1Open ↗
09/04/2026M00431794-P1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWProgress Inspector Seal & Signature49
09/30/2026M00431794-I1Open ↗
09/23/2026M00923653-I1Open ↗
09/11/2026M01116242-I1Open ↗
Showing 3 of 49 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment66
▸BISSELF-CERT PLUMBING NOTICE23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
11/28/2018123461878Open ↗
Showing 1 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
09/05/2019123536236Open ↗
01/31/2018122146347Open ↗
01/08/2018122530751Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
12/05/2025121324520Open ↗
08/24/2020123763659Open ↗
08/24/2020123763659Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
10/18/2017122140049Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos92
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/29/2026M00923653-I1Open ↗
08/28/2026M00944864-I1Open ↗
08/28/2026M00944864-P1Open ↗
Showing 3 of 22 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM18
02/21/2020123763659Open ↗
04/02/2019123535852Open ↗
12/21/2018123461878Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)18
01/28/2021123692584Open ↗
Showing 1 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
09/04/2026M00431794-I1Open ↗
09/04/2026M00439609-I1Open ↗
09/02/2026M00684676-I1Open ↗
Showing 3 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance39
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
01/02/2020123692584Open ↗
12/24/2019123763659Open ↗
09/25/2019123535852Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
08/20/2020123763659Open ↗
09/25/2019123535852Open ↗
04/09/2019123461878Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/02/2026M00684676-I1Open ↗
09/02/2026M00684660-I1Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/04/2022123692584Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/04/2022123692584Open ↗
08/20/2020123763659Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPILES: FINAL PILE PLAN/CREOSOTE LETTER1
12/04/2025121324520Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
10/08/2021123692584Open ↗
▸Approvals, Objections & Sign-offs219
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST84
04/04/2022123692584Open ↗
01/12/2021121324520Open ↗
09/10/2020121324520Open ↗
Showing 3 of 84 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter46
10/05/2026M01199162-S1Open ↗
09/04/2026M00431794-I1Open ↗
09/04/2026M00431794-P1Open ↗
Showing 3 of 46 on file for this type
▸BISLANDMARKS APPROVAL40
01/26/2021123692584Open ↗
09/25/2019123535852Open ↗
12/19/2018123461878Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
01/02/2020123692584Open ↗
Showing 1 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
07/08/2025121324520Open ↗
06/27/2025121324520Open ↗
11/29/2017121324520Open ↗
Showing 3 of 13 on file for this type
▸BISCURB CUT (CC) SIGNOFF1
12/05/2025121324520Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
06/07/2023121324520Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
12/05/2025121324520Open ↗
▸Cost, Insurance & Ownership99
▸BISCOST AFFIDAVIT96
08/20/2020123763659Open ↗
01/02/2020123692584Open ↗
12/24/2019123763659Open ↗
Showing 3 of 96 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
01/05/2026121324520Open ↗
06/02/2025121324520Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/31/2022123692584Open ↗
▸Filing & Intake Forms153
▸BISEFILING COVER SHEET66
01/02/2020123692584Open ↗
12/24/2019123763659Open ↗
12/21/2018123535852Open ↗
Showing 3 of 66 on file for this type
▸BISADDITIONAL INFORMATION48
08/12/2025121324520Open ↗
06/02/2020123763659Open ↗
05/16/2019123461878Open ↗
Showing 3 of 48 on file for this type
▸BISBOROUGH INTAKE FORM33
11/27/2024121324520Open ↗
03/04/2020121324520Open ↗
12/09/2019121324520Open ↗
Showing 3 of 33 on file for this type
▸BISeFiling Job Application Cover Sheet6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents47
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION27
12/24/2019123763659Open ↗
06/21/2019123763659Open ↗
11/28/2018123461878Open ↗
Showing 3 of 27 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSupporting Document: Fee Deferment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FILING CLUSTER DETAILS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
10/05/2026M01199162-S1Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
10/05/2026M01199162-S1Open ↗