Roof1p · 1 filing · 6 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
SELECTIVE BRICK REPLACEMENT, BRICK PINNING, CONCRETE REPAIR, LINTEL REPAIR, MASONRY POINTING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 32Under Construction1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Filing herewith for the modifications to existing plumbing systems
On file for this project
22 documents
Floor 31
Floor 30
Floor 29
Floor 283 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
INTERIOR RENOVATION TO APARTMENT 28B. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
13 documents
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
15 documents
PROPOSE INTERIOR RENOVATIONS AT APT#28A, MINOR PARTITONS AND FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION
On file for this project
4 documents
Floor 27
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Floor 26
Floor 25
Floor 24Under Construction1p · 1 filing · 7 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Modifications to the existing plumbing system for Interior renovations to apartment 24A. No change in use, egress or occupancy
On file for this project
7 documents · 1 drawing sheet
Floor 23
Floor 22
Floor 21
Floor 205p · 3 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS OF EXISTING APARTMENT. 20C. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
INTERIOR RENOVATION OF APT #20G PER PLANS FILED HEREWITH. WORK INCLUDES REPLACEMENT OF EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 4 drawing sheets
Plumbing work on 20th floor as shown on plans.
On file for this project
5 documents
Floor 19Under Construction4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Filing herewith for the renovation at apt 19DEF. Modifications to existing plumbing system. There is no change to use, egress, or occupancy.
On file for this project
16 documents
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS OF EXISTING APARTMENT. 20C. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
18 documents
INTERIOR RENOVATION TO APARTMENT NUMBER 19H. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 18Under Construction1p · 2 filings · 20 docs
ArchitectureElectricalGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
HEREWITH FILE PLANS TO RENOVATE APARTMENT 18BC. WORK TO INCLUDE REMOVING AND INSTALLING NON LOAD BEARING PARTITIONS, FINISHES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
11 documents · 1 drawing sheet
HEREWITH FILE PLANS TO RENOVATE APARTMENT 18A. WORK TO INCLUDE REMOVING AND INSTALLING NON LOAD BEARING PARTITIONS, FINISHES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
11 documents · 1 drawing sheet
Floor 17Under Construction4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Respectfully request to file to Install new plumbing piping & fixtures for apartment renovation. No change in use, egress, or occupancy.
On file for this project
5 documents
RESPECTFULLY REQUEST TO FILE FOR THE REMOVAL OF 2 CHILLED WATER/HOT WATER FAN COIL UNITS (FCU) WITH ASSOCIATED CONTROLS, AND PROVIDE 2 NEW FCU WITH ASSOCIATED DUCT WORK, PIPING, CONTROLS, AND ACCESSORIES.
On file for this project
5 documents
Respectfully request to file gut renovation including non load bearing partitions, flooring, cabinetry & finishes. No change in use, egress, or occupancy.
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 161 filing · 14 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
HEREWITH FILE PLANS TO RENOVATE APT 16B. WORK TO INCLUDE THE REMOVING AND INSTALLING OF NON-BEARING PARTITIONS AND FINISHES. AND THE RELOCATION OF EXISTING BATH EXHAUST. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents
Floor 15
Floor 14Under Construction3 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
HEREWITH FILE PLANS FOR PLUMBING WORK ASSOCIATED WITH THE RENOVATION OF APT 14A; NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
9 documents
Subsequent Application for Plumbing fixture modification.
On file for this project
14 documents
HEREWITH FILED ALTERATION TYPE II FOR ALTERATION OF APARTMENT 14L IN EXISTING MULTIPLE DWELLING BUILDING AND OBTAIN LETTER OF COMPLETION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
Floor 13
Floor 126p · 5 filings · 20 docs
ArchitectureDMElectricalGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
PLUMBING FIXTURES IN 12J FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
14 documents
HEREBY FILING PLUMBING WORK ON 12TH FLOOR UNIT 12A & 12F AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
HEREBY FILING INTERIOR CONSTRUCTION TO 12TH FLOOR TO COMBINE APTS 12A & 12F PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 11Under Construction2p · 4 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REMOVAL, REPLACEMENT AND ADDITION OF NEW DOMESTIC PLUMBING FIXTURES
On file for this project
10 documents
HEREWITH SUBMIT APPLICATION FOR THE RENOVATION OF APT 11H, INCLUDING THE REMOVING AND INSTALLING OF NON-BEARING PARTITIONS AND FINISHES; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents
RENOVATE APARTMENT PER PLANS INCLUDING KITCHEN AND MASTER BATHROOM, ADDING SHOWER TO THE EXISTING POWDER ROOM, AND ADDING A SHOWER TO THE EXISTING MASTER BATHROOM
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 103 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
HEREBY FILING FOR THE INTERIOR RENOVATION OF APT #10G. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
INTERIOR RENOVATION OF DUPLEX AT 9I ON THE 9TH FLOOR AND 10I ON THE 10TH FLOOR ONLY. MINOR CONSTRUCTION OF NEW PARTITIONS AND INSTALL NEW FINISHES THROUGHTOUT. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
17 documents
DIRECT REPLACEMENT OF EXISTING PLUMBING FIXTURES ON 9TH AND 10TH FLOOR EXISTING DUPLEX APT 9I & 10I. NO CHANCE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 91p · 7 filings · 20 docs
ArchitectureDMMechanicalPlumbingOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Renovation of existing bathrooms in apt 9B, 9th & 8th floor. Work to include removal and replacement of finishes and plumbing fixtures. No change in use, egress, nor occupancy.
On file for this project
13 documents · 1 drawing sheet
INTERIOR RENOVATION TO APARTMENT 9Q INCLUDING EXISTING KITCHEN AND BATHROOMS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
7 documents
INTERIOR RENOVATION TO APARTMENT 9Q. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 83p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Renovation of existing bathrooms in apt 9B, 9th & 8th floor. Work to include removal and replacement of finishes and plumbing fixtures. No change in use, egress, nor occupancy.
On file for this project
13 documents · 3 drawing sheets
Minor Interior alteration of existing dwelling unit 8M. Proposed General Construction. Relevant plumbing work is filed through DOB Now Job#M00575884. No change of Use, Egress or Occupancy.
On file for this project
4 documents
Proposed Plumbing Work in conjunction with interior renovation (Job#M00575880) in residential unit 8M. No change of Use, Egress or Occupancy.
On file for this project
4 documents
Floor 7
Floor 614p · 4 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
This application is being herewith for plumbing work in unit 6P. Work to include the installation of new plumbing fixtures in conjunction with DOB #M00962385.
On file for this project
10 documents · 2 drawing sheets
This application is being herewith for the renovation of unit 6P. Work to include interior non-structural partitions, flooring, millwork, doors. No change in use, egress or occupancy.
On file for this project
18 documents · 6 drawing sheets
Plumbing work file in conjunction with apartment renovation.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 51p · 1 filing · 6 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
SELECTIVE BRICK REPLACEMENT, BRICK PINNING, CONCRETE REPAIR, LINTEL REPAIR, MASONRY POINTING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 4Under Construction1 filing · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
INTERIOR RENOVATION TO APARTMENT NUMBER 4H. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
On file for this project
19 documents
Floor 3
Floor 2
Floor 1Under Construction3p · 10 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
MINOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Subsequent is filed only for compliance with energy conservation for lighting
On file for this project
20 documents
Install AC split system & associated ducting and diffusers for renovation of residential lobby at 1st floor. Work is in conjunction with M01006382.
On file for this project
10 documents
Latest 3 of 10 filings on this floor.
Cellar3 filings · 16 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
INSTALLATION OF VENTIALLATION AIR FAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents
REINFORCED CONCRETE STRUCTURE REPAIRS AND TRAFFIC COATINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
PARKING GARAGE BEAM & SLAB REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Sub-Cellar2 filings · 9 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
REINFORCED CONCRETE STRUCTURE REPAIRS AND TRAFFIC COATINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
PARKING GARAGE BEAM & SLAB REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Site & exteriorUnder Construction9 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural · Supported Scaffold
Subsequent is filed only for compliance with energy conservation for lighting
On file for this project
20 documents · 12 drawing sheets
Install AC split system & associated ducting and diffusers for renovation of residential lobby at 1st floor. Work is in conjunction with M01006382.
On file for this project
10 documents · 3 drawing sheets
Replace existing PL fixtures. Replace and install in open space area by lobby entrance floor/area drains and gutters. Work is in conjunction with GC M01006382
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Filed — no permit issued7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
REMOVAL, REPLACEMENT AND ADDITION OF NEW DOMESTIC PLUMBING FIXTURES
On file for this project
6 documents · 4 drawing sheets
SPRINKLER ALT APPLICATION TO INSTALL NEW SPRINKLERS SYSTEM AT COMMERCIAL BIKE RENTAL SHOP ON THE 1ST FLOOR. NO CHANGE IN USE, EGRESS , OR OCCUPANCY.
On file for this project
2 documents · 5 drawing sheets
ALT APPLICATION TO INSTALL NEW MECHANICAL SYSTEM AT 1ST FLOOR COMMERCIAL BIKE RENTAL SHOP. NO CHANGE IS USE, EGRESS OR OCCUPANCY
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.