RoofUnder Construction46p · 13 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural · Supported Scaffold
MODIFICATION TO EXISTING TMO SITE. REMOVE EXISTING EQUIPMENT PLATFORM. INSTALL NEW EQUIPMENT PLATFORM. REPLACE 2 ANTENNA SECTORS ON ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.. ORIGINAL APP# 104592530.
On file for this project
2 documents
INSTALLATION OF A TEMPORARY ROOF ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ENCLOSURE SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
Project M01306990Permit Issued · 07/27/2026
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 13 filings on this floor.
Floor 59Under Construction14p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Structural
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
21 documents · 4 drawing sheets
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents
Floor 58Under Construction80p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
21 documents · 2 drawing sheets
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents
PLUMBING WORK IN CONJUNCTION WITH INTERIOR OFFICE RENOVATION ON THE 58TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 57Under Construction37p · 6 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
21 documents · 3 drawing sheets
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
Floor 56102p · 12 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Filing herewith interior renovation of existing 56th floor space, Magnitude Capital. No change in use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets
Filing herewith sprinkler work on existing 56th floor space, Magnitude Capital. No change in use, egress or occupancy.
On file for this project
3 documents
Filing herewith mechanical work at existing 56th floor space, Magnitude Capital. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 12 filings on this floor.
Floor 55
Floor 5421p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Sprinklers
Modification to existing Sprinkler & Plumbing Systems as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
14 documents · 4 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
14 documents · 2 drawing sheets
Installation of temporary loop as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Floor 5337p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Filing herewith Plumbing on the 51st to 53rd FLS. as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Filing herewith Mechanical Work on the 51st, 52nd and 53rd FLS. as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
21 documents · 1 drawing sheet
Filing herewith modification to the existing sprinkler system on the 51st to 53rd FL. as per plans filed herewith. No change to use, egress occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 5246p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this project
19 documents · 2 drawing sheets
Filing herewith Plumbing on the 51st to 53rd FLS. as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Filing herewith Mechanical Work on the 51st, 52nd and 53rd FLS. as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
21 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 5139p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Filing herewith Plumbing on the 51st to 53rd FLS. as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Filing herewith Mechanical Work on the 51st, 52nd and 53rd FLS. as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
21 documents · 2 drawing sheets
Filing herewith modification to the existing sprinkler system on the 51st to 53rd FL. as per plans filed herewith. No change to use, egress occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 5011p · 3 filings · 11 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
3 documents
MODIFICATION TO EXISTING SPRINKLER SYSTEM
On file for this project
5 documents
MODIFICATION TO EXISTING PLUMBING FIXTURES
On file for this project
3 documents
Floor 49
Floor 4811p · 3 filings · 9 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
MODIFICATION TO THE EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
MECHANICAL DUCT WORK AND RELATED FINISHES AS PER PLANS FILED. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
3 documents
REMOVAL AND INSTALLATION OF PL FIXTURES AND RELATED FININHES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Floor 4722p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this project
19 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
3 documents
MODIFICATION TO EXISTING SPRINKLER SYSTEM
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 46Under Construction36p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
23 documents · 11 drawing sheets
Floor 45Under Construction88p · 12 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications and related finishes as per plans. There will be no change in use, egress, or occupancy.
On file for this project
24 documents · 1 drawing sheet
Plumbing modifications taking place on the 45th floor as per plans filed herewith. No change in use, egress nor occupancy.
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications taking place on the 45th floor as per plans filed herewith. No change in use, egress nor occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 44Under Construction59p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
880 SF CONSTRUCTION OF NEW PARTITIONS AND DOORS ON THE 44TH FL EAST MULTI-PURPOSE ROOM AS PER PLANS AND INCREASE IN OCCUPANCY AND PA SPACE. ALL RELATED FILINGS TO BE SUBMITTED INDIVIDUALLY.
On file for this project
11 documents
Structural modifications and related finishes as per plans. There will be no change in use, egress, or occupancy.
On file for this project
24 documents · 5 drawing sheets
Interior tenant fit-out and related finishes as per plans.
On file for this project
3 documents
Floor 43
Floor 4221p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
SPRINKLER MODIFICATIONS TO OFFICE SPACE LOCATED ON THE 42ND FL
On file for this project
10 documents
plumbing modifications to existing commercial space located on the 42nd floor
On file for this project
3 documents
mechanical modifications to commercial space located on the 42nd fl
On file for this project
14 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 41108p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler modifications and associated piping and related finishes for tenant fit-out as per plans. There will be no change in use, egress, or occupancy.
On file for this project
45 documents · 7 drawing sheets
Interior sprinkler demo and related piping with a sprinkler temp loop install as per plans. There will be no change in use, egress, or occupancy.
On file for this project
24 documents · 3 drawing sheets
Floor 40
Floor 39152p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and renovation of interior non-load bearing partitions on 38th & 39th Floors and Construction Floor 2 (Marketing Mezzanine Level) as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Modification to existing HVAC system on 38th & 39th Floors and Mezzanine (1st floor) as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
New slab opening & floor reinforcement and new stair (Modification to existing structural system) as per plans filed herewith. No change in use egress, or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 38144p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and renovation of interior non-load bearing partitions on 38th & 39th Floors and Construction Floor 2 (Marketing Mezzanine Level) as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modification to existing HVAC system on 38th & 39th Floors and Mezzanine (1st floor) as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
New slab opening & floor reinforcement and new stair (Modification to existing structural system) as per plans filed herewith. No change in use egress, or occupancy under this application.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 37
Floor 3629p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this project
19 documents · 2 drawing sheets
Renovation of existing office space with conversion of constant air volume system to a variable air volume within new space as shown on drawings filed herewith. No change in use egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Modify sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 2 drawing sheets
Floor 35
Floor 34Under Construction52p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby to remove fire hose cabinet as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
27 documents · 16 drawing sheets
Floor 33Under Construction48p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby filing to remove and install new plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 4 drawing sheets
Hereby filing for demo of communicating stair at 32nd floor (32 to 33) and slab infill on the 33rd floor as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Floor 32Under Construction71p · 14 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Project M01450585Permit Issued · 09/10/2026
Hereby filing to remove and install plumbing fixtures with related piping for bathroom renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
15 documents
DISCONNECT AND REMOVE EXISTING WATER COOLED CONDENSER UNIT AND AIR HANDLER UNIT ON 32ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
hereby filing to remove, relocate, and install sprinkler heads with related piping for elevator lobby renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents
Latest 3 of 14 filings on this floor.
Floor 31Under Construction89p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to existing HVAC systems and ductwork as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Modification to existing sprinkler systems. No change in use,, egress or occupancy.
On file for this project
3 documents
Removal and renovation of non-load bearing interior partitions
On file for this project
6 documents
Latest 3 of 11 filings on this floor.
Floor 30Under Construction72p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this project
19 documents · 2 drawing sheets
Floor 29Under Construction38p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove, relocate, and install new sprinkler heads with related piping for office renovation as shown on plans filed herewith.
On file for this project
21 documents · 3 drawing sheets
Hereby filing to remove plumbing fixtures and sprinkler heads with related piping on the 16th floor a shown on plans filed herewith.
On file for this project
7 documents · 1 drawing sheet
Floor 28Under Construction61p · 1 filing · 18 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents
Floor 27Under Construction115p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents · 3 drawing sheets
Installation of new plumbing fixtures and sprinkler & temporary sprinkler heads/standpipe fixtures and modification of existing plumbing/sprinkler/standpipe fixtures. No change in use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Removal and renovation of interior non-load bearing partitions, fixtures, suspended ceilings, floors and finishes.
On file for this project
10 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 26Under Construction62p · 1 filing · 18 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents · 1 drawing sheet
Floor 252p · 1 filing · 3 docs
Fire ProtectionPlumbing
Issued Permit Scope
Standpipe
Modification to existing Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
Floor 2413p · 2 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Standpipe
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this project
19 documents · 1 drawing sheet
Modification to existing Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
Floor 23Under Construction37p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
5 documents
Filing herewith interior demo. and renovations for the 23rd FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
3 documents · 7 drawing sheets
filing herewith Mechanical work on the 23rd FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
16 documents
Latest 3 of 5 filings on this floor.
Floor 22Under Construction21p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Standpipe · Structural
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
68 documents · 6 drawing sheets
Floor 21Under Construction29p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
68 documents · 1 drawing sheet
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS ANDRELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
58 documents · 6 drawing sheets
Hereby filing a heat rejection system for tenants as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents · 2 drawing sheets
Floor 20Under Construction45p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
68 documents · 6 drawing sheets
Supplemental framing at the 20th floor as indicated on drawings.
On file for this project
5 documents
Plumbing changes on the 20th floor as indicated on drawings.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 19Under Construction45p · 1 filing · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
25 documents · 10 drawing sheets
Floor 18
Floor 1797p · 10 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
FILING STRUCTURAL WORK FOR INSTALLATION OF ADDITIONAL STEEL FOR EXISTING FRAMING REINFORCEMENT AND MOVEABLE PARTITIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
43 documents · 5 drawing sheets
FILING IN ORDER TO REMOVE AND REPLACE FIRE HOSE STANDPIPE AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
hereby filing to remove and install sprinkler heads with related piping as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents
Latest 3 of 10 filings on this floor.
Floor 16170p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to replace and install new fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
19 documents · 8 drawing sheets
Installation of interior, non-load bearing partitions, doors, ceilings, and related finishes as per plans filed herewith. No change in use, egress, or occupancy under this application.
On file for this project
8 documents · 15 drawing sheets
Hereby filing to remove plumbing fixtures and sprinkler heads with related piping on the 16th floor a shown on plans filed herewith.
On file for this project
7 documents
Latest 3 of 10 filings on this floor.
Floor 15137p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
modifications to the existing plumbing, sprinkler, standpipe systems as per plans filed herewith. no change to use egress or occupancy.
On file for this project
9 documents · 18 drawing sheets
interior renovations and modifications to existing partitions, fixtures, and finishes as per plans filed herewith. no change to use egress or occupancy.
On file for this project
8 documents · 6 drawing sheets
Modifications to mechanical systems. No change in use, occupancy, or egress.
On file for this project
12 documents · 11 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1479p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
General construction work in conjunction with partial Floor interior fit out. No change to use, egress, or occupancy.
On file for this project
8 documents · 5 drawing sheets
Mechanical work filed in conjunction with partial Floor interior fit out. No change to use, egress, or occupancy.
On file for this project
15 documents · 2 drawing sheets
Modification to existing sprinkler & standpipe work, installation of new plumbing fixtures/equipment & associated piping. No change to use, egress, or occupancy.
On file for this project
7 documents
Latest 3 of 9 filings on this floor.
Floor 13
Floor 12106p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Filing herewith plumbing work on the 12th FL. space as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Filing herewith interior renovation to the 12th FL. space as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Filing herewith mechanical work on the 12th FL. space as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
16 documents
Latest 3 of 9 filings on this floor.
Floor 1127p · 4 filings · 17 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Filing herewith plumbing work on existing 11th floor space. No change in use, egress or occupancy.
On file for this project
3 documents · 4 drawing sheets
Filing herewith sprinkler work on existing 11th floor space. No change in use, egress or occupancy.
On file for this project
8 documents · 4 drawing sheets
Filing herewith interior renovation to existing 11 floor space. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 10Under Construction88p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Hereby filing to install new streel framing for raised deck as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
12 documents · 3 drawing sheets
Project M01306990Permit Issued · 07/27/2026
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
On file for this project
2 documents
FILING HEREWITH SPRINKLER AND STANDPIPE WORK AS PER PLANS.
On file for this project
4 documents
Latest 3 of 10 filings on this floor.
Floor 9Under Construction66p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Modification to existing plumbing and sprinkler systems and fixtures and head. No changes in use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Modification to existing HVAC systems as per plans filed. No change in use, egress or occupancy.
On file for this project
6 documents
Renovation of existing tenant space to add additional offices / meeting rooms into a vacant portion of their floor area. No change in use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 8Under Construction12p · 34 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
21 documents · 5 drawing sheets
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents
Hereby filing Removal and installation of exterior doors and security devices as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 25 filings on this floor.
Floor 7Under Construction149p · 17 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Hereby filing to remove and install sprinkler heads with related piping for 7th floor renovation as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
8 documents · 8 drawing sheets
Removal and renovation of non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
TEMPORARY SYSTEM SCAFFOLD IN UTILITY SHAFT AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 17 filings on this floor.
Floor 688p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modifications to the existing plumbing system on the (4th and 6th Floors- MetLife) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Relocate (35) heads, Remove (12), Install (2) on 3rd; Relocate (4) and Install (1) new on 4th; Relocate (37) heads, Remove (2), Install (2) new on 5th and Relocate (18) heads, Rem (5) on 6th and assoc sprinkler piping (MetLife Demise Separation Project.)
On file for this project
8 documents
Modifications to the existing HVAC System on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 11 filings on this floor.
Floor 5Under Construction97p · 10 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Hereby filing to remove and relocate sprinkler heads for bathroom renovation with related piping as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
19 documents · 10 drawing sheets
Relocate (35) heads, Remove (12), Install (2) on 3rd; Relocate (4) and Install (1) new on 4th; Relocate (37) heads, Remove (2), Install (2) new on 5th and Relocate (18) heads, Rem (5) on 6th and assoc sprinkler piping (MetLife Demise Separation Project.)
On file for this project
8 documents
Modifications to the existing HVAC System on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 4Under Construction124p · 15 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modification to existing HVAC systems as per plans filed. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Hereby filing to remove existing ductwork and fans, install new DX split unit with associated ductwork and piping as part of water heater upgrade as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
7 documents · 3 drawing sheets
HEREBY FILING TO REMOVE AND INSTALL SPRINKLER HEADS WITH RELATED PIPING FOR 4TH AND 5TH FLOOR AS SHOWN ON PLANS FILED HEREWITH.
On file for this project
19 documents · 11 drawing sheets
Latest 3 of 15 filings on this floor.
Floor 3148p · 12 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural · Supported Scaffold
Relocate (35) heads, Remove (12), Install (2) on 3rd; Relocate (4) and Install (1) new on 4th; Relocate (37) heads, Remove (2), Install (2) new on 5th and Relocate (18) heads, Rem (5) on 6th and assoc sprinkler piping (MetLife Demise Separation Project.)
On file for this project
8 documents
Modifications to the existing HVAC System on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this project
11 documents · 11 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 2Under Construction13p · 21 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
HEREBY FILING TO RELOCATE AND INSTALL SPRINKLER HEADS WITH RELATED PIPING FOR LOBBY AMENITY SPACE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
30 documents · 13 drawing sheets
Hereby filing repair of the existing concrete slab and steel beam encasement from below, and remediation at the existing parking garage expansion joint from above as shown on plans filed herewith. No change to use, occupancy, or egress.
On file for this project
5 documents
Hereby filing to remove and install sprinkler heads with related piping for storefront modification as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 21 filings on this floor.
Floor 1Under Construction10p · 58 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Hereby filing to remove existing ductwork and fans, install new DX split unit with associated ductwork and piping as part of water heater upgrade as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
7 documents · 3 drawing sheets
Hereby filing installation of interior millwork on partial 33rd floor and document new place of assembly spaces as per drawings filed herewith.
On file for this project
11 documents
Hereby filing to install sprinkler heads and related piping for restaurant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
45 documents · 15 drawing sheets
Latest 3 of 25 filings on this floor.
Mezzanine13p · 27 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to remove and install sprinkler heads with related piping for the Vanderbilt suite as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 3 drawing sheets
Hereby filing Concrete spall and crack repairs and local slab replacement as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
20 documents
Provide new exhaust fan and associated ductwork and connect to existing louver as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 25 filings on this floor.
Site & exterior7p · 9 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralStructural
Issued Permit Scope
Construction Fence · Earth Work · General Construction · Sidewalk Shed · Supported Scaffold
HEREBY FILING TO INSTALL NEW PLANTERS AND LANDSCAPE AROUND 200 PARK AVE WITH IN THE PROPERTY LINE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE OCCUPACNY OR EGRESS.
On file for this project
3 documents · 6 drawing sheets
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION OF PUBLIC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 3 drawing sheets
Filing herewith for Facade repairs as per plans. No change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Filed — no permit issued78p · 20 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralSC
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
20 documents · 1 drawing sheet
Hereby filing to modify and install exhaust ductwork, diffuser, fan, louver to provide air to the new grab and go area as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
11 documents · 7 drawing sheets
Latest 3 of 20 filings on this floor.