RoofMaterial hoist installation11p · 4 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Structural
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents · 1 drawing sheet
STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, ERESS OR OCCUPANCY.
On file for this project
19 documents · 2 drawing sheets
Installation of suspended scaffolding as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
BulkheadMaterial hoist installation1p · 1 filing · 6 docs
Architecture
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents · 1 drawing sheet
PenthouseUnit PH, Unit PHF34p · 6 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, ERESS OR OCCUPANCY.
On file for this project
19 documents · 1 drawing sheet
RENOVATION OF EXISTING APARTMENT PH-F. MINOR PLUMBING WORK. REMOVAL AND INSTALLATION OF NON LOAD BEARING WALLS IS FILLED IN CONJUNCTION WITH THIS PLUMBING APPLICATION. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
On file for this project
8 documents
Interior apartment renovation of PH-F on the 19th floor. No change to occupancy, use, or egress.
On file for this project
10 documents
Latest 3 of 6 filings on this floor.
Floor 212p · 1 filing · 10 docs
ArchitectureGeneral
Interior apartment renovation of PH-F on the 19th floor. No change to occupancy, use, or egress.
On file for this project
10 documents · 2 drawing sheets
Floor 20Leak and tank room repair5p · 1 filing · 19 docs
Architecture
Issued Permit Scope
General Construction
STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, ERESS OR OCCUPANCY.
On file for this project
19 documents
Floor 19Unit 19J6p · 2 filings · 17 docs
Plumbing
Issued Permit Scope
Plumbing
INSTALLATION OF (1) NEW 4.5 TON (59,000 BTUH, 1,900 CFM) AIR COOLED SPLIT SYSTEM.
On file for this project
13 documents · 1 drawing sheet
NEW, RELOCATE AND REPLACE PLUMBINGFIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 18Unit 18M, Unit 18DEUnder Construction11p · 2 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Removal of non load bearing partition wall, new partition wall for new powder room and laundry, new mechanical vent and new window in apartment 18m
On file for this project
15 documents
Alt2 plumbing work type to combine units 18DE on 18th floor per TPPN 3/97. Initial general construction has been filed (M008506991-I1). All conditions are according to submitted plans. No change in use, egress, or occupancy under this application.
On file for this project
9 documents · 4 drawing sheets
Floor 17Unit 17I12p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Replacement of plumbing fixtures as part of the interior apartment renovation as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
19 documents
Interior renovation of apartment including removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
4 documents
Floor 16Unit 16E5p · 2 filings · 14 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION OF EXISTING 2-BEDROOM APARTMENT. REPLACE /RELOCATE PARTITIONS, FIXTURES, FINISHES, APPLIANCES, AND LIGHTING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
PLUMBING FIXTURE REPLACEMENT & RELOCATION IN CONJUNCTION WITH ALT-GC INTERIOR RENOVATION OF EXISTING 2-BEDROOM APARTMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
Floor 15Unit 15C, Unit 15LM4p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
New alt2 for general construction work to be performed in existing unit 15C on the 15th fl. Subsequent plumbing application to be filed. All in accordance with submitted plans. No changes to use, egress, or occupancy under this application.
On file for this project
12 documents
Subsequent filing for providing new VRF DX split system. New exhaust fans will be provided servicing the new bathroom.
On file for this project
9 documents · 12 drawing sheets
Floor 14
Floor 13
Floor 12Unit 12A, Unit 12M11p · 2 filings · 18 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
work on apt 12A on the 12th floor only - gut renovate 1 kitchen and three bathrooms. minor partition removal and construction. replace wood floors in portion of apt. no change in use, egress or occupancy
On file for this project
11 documents
Apt. #12M, install new minor interior partitions. No change in egress, occupancy, or use.
On file for this project
7 documents
Floor 11
Floor 10
Floor 9Unit 9J, Unit 9K, Unit 9L9p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN CONNECTION WITH GENERAL CONSTRUCTION AT KITCHEN.
On file for this project
16 documents
Removal of non load bearing partition closet wall, new partition wall to create large closet, renovate kitchen
On file for this project
4 documents
PLUMBING WORK IN CONNECTION WITH GENERAL CONSTRUCTION AS INDICATED ON THE DRAWINGS.
On file for this project
10 documents
Floor 8
Floor 7
Floor 6
Floor 5Unit 5F, Unit 5EI20p · 3 filings · 17 docs
ArchitectureCivilDMPlumbing
Issued Permit Scope
General Construction · Plumbing
Minor partition wall moderations
On file for this project
3 documents
Plumbing work for renovations of apartment 5EI or 5th floor. No change in use, egress or occupancy.
On file for this project
8 documents · 4 drawing sheets
Architectural renovations with related plumbing work in Apt #5EI on the 5th floor. Apartments previously combined under application #101080731. No change in use, egress, or occupancy.
On file for this project
6 documents · 3 drawing sheets
Floor 4
Floor 3Unit 3K, Unit 3M11p · 4 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Herewith filing new ALT2 application for general construction work to be performed in existing unit 3K on the third floor. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
On file for this project
23 documents
Plumbing file in conjunction with apartment combination and renovation on second and third floors.
On file for this project
4 documents
PLUMBING WORK OF APARTMENT 3M ON 3RD FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 2Plumbing demolition and construction, 2nd and 3rd floors2p · 1 filing · 4 docs
Plumbing
Issued Permit Scope
Plumbing
Plumbing file in conjunction with apartment combination and renovation on second and third floors.
On file for this project
4 documents
Floor 1Storefront and Column Repair18p · 3 filings · 20 docs
ArchitectureCivilElectricalEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Sidewalk Shed
REINFORCEMENT OF EXISTING STEEL COLUMNS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 495' LONG AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
On file for this project
4 documents
PARAPET REBUILDING AND COURTYARD ROOF REPLACEMENT, COUNTERFLASHING REPLACEMENT, DOOR SILLREPLACEMENT, AND ROOF DRAIN REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 4 drawing sheets
CellarStorefront and Column Repair5p · 2 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
Structural
REINFORCEMENT OF EXISTING STEEL COLUMNS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
2 documents · 3 drawing sheets
BasementStorefront and Column Repair1p · 1 filing · 18 docs
Structural
REINFORCEMENT OF EXISTING STEEL COLUMNS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Sub-BasementStructural deck repairs1p · 2 filings · 14 docs
Structural
Issued Permit Scope
Structural
Demolish cellar roof/courtyard concrete slab between structural steel beams in one area approximately 9'-0 x 9'-0. Install new metal deck, reinforcing bars, concrete, roofing, and topping slab.
On file for this project
12 documents
No filed description on record for this project.
On file for this project
2 documents · 3 drawing sheets
Site & exteriorMaterial hoist installation106p · 7 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents · 12 drawing sheets
Installation of a temporarily heavy-duty sidewalk rated 600 PSF for material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
8 documents · 12 drawing sheets
Installation of a temporarily heavy-duty sidewalk rated 600 PSF for material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
8 documents · 12 drawing sheets
Latest 3 of 7 filings on this floor.