| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01114011 ↗ | 336 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 10/30/2024 | 05/27/2026 | PLUMBING IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 17AF ON THE 17TH FLOOR. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, AND OCCUPANCY… | |
| M01338544 ↗ | 315 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 12/29/2025 | 04/27/2026 | Design ADAL ENGINEERING PLLC | Modification to interior partitions related to the minor renovation of apartment 2A on the 2nd floor. |
| M01316520 ↗ | 290 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 03/10/2026 | 04/23/2026 | Design POP ARCHITECTURE DPC Filer BOUTIQKEY LLC | INTERIOR PLUMBING FOR KITCHEN AND BATHROOMS WITH THE RENOVATION OF APARTMENT 3D ON THE 3RD FLOOR. PAA P2 TO AMEND PLUMBING SCHEDULE TO REFLE… |
| M01099931 ↗ | 2511 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/07/2025 | 09/29/2025 | Design ARCHETYPE ARCHITECTURE | Proposed plumbing work in existing unit #3B on the 3rd floor. Initial general construction application to be filed. As per the submitted pla… |
| M01161197 ↗ | 33 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/06/2025 | 09/25/2025 | Design SGM ENGINEERING | Mechanical work will be performed in existing unit #10CD on the 10th floor. The initial general construction application is to be filed. All… |
| M01227772 ↗ | 33 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 06/10/2025 | 06/30/2025 | Design BIG ARCHITECTURE DPC Filer BROOKBRIDGE CONSULTING | Interior demolition and minor, non-load-bearing partition work for the combination of units 4DA and 4E. No change to egress, use, occupancy,… |
| Name | Projects together | Most recent |
|---|---|---|
| ARCHETYPE ARCHITECTURE | 7 | 08/10/2026 |
| ADAL ENGINEERING PLLC | 2 | 12/29/2025 |
| SGM ENGINEERING | 2 | 02/07/2025 |
| ANZ CONSULTING ENGINEERING, PLLC | 1 | 10/30/2024 |
| BIG ARCHITECTURE DPC | 1 | 02/04/2026 |
| CO ADAPTIVE ARCHITECTURE, PLLC | 1 | 02/11/2022 |
| DAVID MANN ARCHITECT | 1 | 04/23/2021 |
| EDWARD F ZEVALLOS ARCHITECT, PC | 1 | 06/13/2024 |
| POP ARCHITECTURE DPC | 1 | 08/10/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| HYDROKINETIC PLBG & HTG I | 5 | 05/26/2023 |
| PEGASUS P&H CORP | 3 | 08/10/2026 |
| NAMRON, INC | 2 | 02/07/2025 |
| AMN PLUMBING CORP | 1 | 08/10/2026 |
| RENWOOD INTERIORS CORP | 1 | 08/29/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| AKAM ASSOCIATES, INC. | 1 | 04/23/2021 |
| TUDOR REALTY SERVICES CORP | 1 | 08/20/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| NEXUS CONSULTING NYC, INC | 7 | 08/10/2026 |
| BOUTIQKEY LLC | 1 | 08/10/2026 |
| BROOKBRIDGE CONSULTING | 1 | 02/04/2026 |
| PROCESS WERKSHOP LLC | 1 | 04/23/2021 |
| SYNCHRON EXPEDITING, LLC | 1 | 11/08/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01114011 ↗ | 336 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 10/30/2024 | 05/27/2026 | PLUMBING IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 17AF ON THE 17TH FLOOR. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, AND OCCUPANCY… | |
| M01338544 ↗ | 315 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 12/29/2025 | 04/27/2026 | Design ADAL ENGINEERING PLLC | Modification to interior partitions related to the minor renovation of apartment 2A on the 2nd floor. |
| M01316520 ↗ | 290 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 03/10/2026 | 04/23/2026 | Design POP ARCHITECTURE DPC Filer BOUTIQKEY LLC | INTERIOR PLUMBING FOR KITCHEN AND BATHROOMS WITH THE RENOVATION OF APARTMENT 3D ON THE 3RD FLOOR. PAA P2 TO AMEND PLUMBING SCHEDULE TO REFLE… |
| M01099931 ↗ | 2511 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/07/2025 | 09/29/2025 | Design ARCHETYPE ARCHITECTURE | Proposed plumbing work in existing unit #3B on the 3rd floor. Initial general construction application to be filed. As per the submitted pla… |
| M01161197 ↗ | 33 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/06/2025 | 09/25/2025 | Design SGM ENGINEERING | Mechanical work will be performed in existing unit #10CD on the 10th floor. The initial general construction application is to be filed. All… |
| M01227772 ↗ | 33 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 06/10/2025 | 06/30/2025 | Design BIG ARCHITECTURE DPC Filer BROOKBRIDGE CONSULTING | Interior demolition and minor, non-load-bearing partition work for the combination of units 4DA and 4E. No change to egress, use, occupancy,… |
| M01107476 ↗ | 304 EAST 65 STREET MANHATTAN | Alteration | Permit Issued | 09/12/2024 | 09/25/2024 | — | INTERIOR RENOVATION AT 304 East 65th St, APARTMENT#11A kitchen and bathroom renovation, hardwood floor installation, lighting upgrade. . NO … |
| M01034849 ↗ | 336 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 06/13/2024 | 07/18/2024 | Bathroom renovation in APT. 2BC, turn closet into a shower. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | |
| M00714128 ↗ | 123 WEST 93 STREET MANHATTAN | Alteration | Permit Issued | 08/16/2022 | 04/29/2024 | Design ARCHETYPE ARCHITECTURE | Herewith filing new alt2 for plumbing work to be performed in existing unit 8F on the 8th floor. All in accordance with submitted plans. No … |
| M00958468 ↗ | 352 EAST 69 STREET MANHATTAN | Alteration | Signed-off | 11/08/2023 | 12/19/2023 | Design ADAL ENGINEERING PLLC Filer SYNCHRON EXPEDITING, LLC | Plumbing work related to the installation of (2) new bathrooms on the 1st and 2nd floors in an existing single-family residence. |
| M00856991 ↗ | 530 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 04/24/2023 | 06/09/2023 | Design ARCHETYPE ARCHITECTURE | Alt2 plumbing work type to combine units 18DE on 18th floor per TPPN 3/97. Initial general construction has been filed (M008506991-I1). All … |
| M00853006 ↗ | 60 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 04/19/2023 | 06/05/2023 | Design ARCHETYPE ARCHITECTURE | Alt2 PL work type to combine units 16D/16E on 15th floor per TPPN 3/97 Under Prior to 1968 code. Please view CO (1965) in documents. All con… |
| M08016126 ↗ | 590 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 01/25/2023 | 03/17/2023 | Design ARCHETYPE ARCHITECTURE | Application filed for plumbing work of apartment 12D on the 12th Floor. No change in use, egress, or occupancy under this application |
| M00604755 ↗ | 336 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 12/08/2021 | 04/15/2022 | Design ARCHETYPE ARCHITECTURE | Herewith filing new Alt2 application for general construction work to be performed in existing unit 19C on the 19th floor. All in accordance… |
| B00666603 ↗ | 711 GREENWOOD AVENUE BROOKLYN | Alteration | Signed-off | 02/11/2022 | 02/18/2022 | INTERIOR ALTERATION OF EXISTING 2-FAMILY BUILDING TO INCLUDE THE REMOVAL AND INSTALLATION OF FIRE-RATED NON-LOAD BEARING PARTITIONS. ALL WOR… | |
| M00499291 ↗ | 1408 2 AVENUE MANHATTAN | Alteration | Signed-off | 04/23/2021 | 05/21/2021 | Design DAVID MANN ARCHITECT Owner AKAM ASSOCIATES Filer PROCESS WERKSHOP LLC | Remove/install non-bearing interior partitions and finishes in Apt 12E. Plumbing work filed under separate application. No change in occupan… |
| 140968898BIS | 12 WEST 96 STREET MANHATTAN | — | ISSUED | 02/02/2021 | 04/21/2021 | — | OT |
| 140991602BIS | 465 WEST END AVENUE MANHATTAN | — | ISSUED | 03/10/2021 | 04/21/2021 | — | OT |
| 140932427BIS | 124 EAST 79 STREET MANHATTAN | — | ISSUED | 09/10/2020 | 09/10/2020 | — | OT |
| M00219513 ↗ | 12 WEST 120 STREET MANHATTAN | Alteration | Signed-off | 10/10/2019 | 07/21/2020 | Design SGM ENGINEERING Filer KATARIA BUILDERS L.L.C | FILING HEREWITH PLANS AND APPLICATION TO INSTALL (2)A/C CONDENSER ON ROOF AND (1)A/C CONDENSER ON SECOND FLOOR, ON EXISTING STEEL DUNNAGE. … |
| 123725718BIS | 203 WEST 81 STREET MANHATTAN | — | ISSUED | 06/25/2020 | 06/25/2020 | — | OT |
| 123844028BIS | 1408 2 AVENUE MANHATTAN | — | ISSUED | 02/26/2020 | 06/08/2020 | — | OT |
| 140700276BIS | 2669 BROADWAY MANHATTAN | — | ISSUED | 04/06/2018 | 06/25/2019 | — | OT, PL |
| 123681051BIS | 2162 BROADWAY MANHATTAN | — | ISSUED | 06/06/2019 | 06/13/2019 | — | MH, PL |
| 123444923BIS | 203 WEST 81 STREET MANHATTAN | — | ISSUED | 08/15/2018 | 08/20/2018 | — | MH, OT, PL |
| 340545510BIS | 525 2 STREET BROOKLYN | — | ISSUED | 01/18/2018 | 01/18/2018 | — | OT |
| 321677075BIS | 18 POWERS STREET BROOKLYN | — | ISSUED | 01/09/2018 | 01/12/2018 | — | PL |
| 123203639BIS | 33 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 12/11/2017 | 12/19/2017 | — | OT, PL |
| 321646117BIS | 18 POWERS STREET BROOKLYN | — | ISSUED | 08/31/2017 | 09/26/2017 | — | OT, PL |
| 321630188BIS | 18 POWERS STREET BROOKLYN | — | ISSUED | 09/07/2017 | 09/18/2017 | — | OT |
| 121283734BIS | 197 EAST 76 STREET MANHATTAN | — | ISSUED | 05/19/2017 | 05/23/2017 | — | OT, PL |
| 122983432BIS | 315 WEST END AVENUE MANHATTAN | — | ISSUED | 01/11/2017 | 03/13/2017 | — | OT, PL |
| 122668586BIS | 197 EAST 76 STREET MANHATTAN | — | ISSUED | 05/03/2016 | 06/23/2016 | — | BL, MH, OT, PL |
| 122131031BIS | 1200 5 AVENUE MANHATTAN | — | ISSUED | 10/27/2015 | 03/16/2016 | — | OT, PL |
| Building | Filings | Most Recent |
|---|---|---|
| 315 WEST END AVENUE ↗ | 1 | 07/08/2026 |
| 123 WEST 93 STREET ↗ | 1 | 07/08/2026 |
| 352 EAST 69 STREET ↗ | 1 | 07/08/2026 |
| 530 AMSTERDAM AVENUE ↗ | 1 | 07/08/2026 |
| 711 GREENWOOD AVENUE ↗ | 1 | 07/08/2026 |
| 1408 2 AVENUE ↗ | 1 | 07/08/2026 |
| 590 WEST END AVENUE ↗ | 4 | 07/08/2026 |
| 33 RIVERSIDE DRIVE ↗ | 1 | 07/08/2026 |
| 304 EAST 65 STREET ↗ | 1 | 07/08/2026 |
| 290 WEST END AVENUE ↗ | 1 | 04/09/2026 |
| 2511 BROADWAY ↗ | 1 | 04/09/2026 |
| 33 5 AVENUE ↗ | 1 | 04/09/2026 |
| 60 RIVERSIDE DRIVE ↗ | 3 | 03/21/2026 |
| 336 WEST END AVENUE ↗ | 9 | 03/21/2026 |
| 12 WEST 120 STREET ↗ | 3 | 03/21/2026 |