Roof18p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Leak repairs as per plans filed here with. No change in use, occupancy or egress.
On file for this project
7 documents · 1 drawing sheet
INTERIOR RENOVATIONS FOR A PROPOSED FOOD MARKET ON THE 1ST AND CELLAR FLOORS. INSTALL NEW REFRIGERATION COMPRESSORS. PLUMBING WORK FILED UNDER APP #M00889730
On file for this project
19 documents
Floor 20Unit 20D, Unit 20JUnder Construction10p · 2 filings · 9 docs
Architecture
Issued Permit Scope
General Construction
Modification to doors to increase height (non load bearing partitions) and general refinishing of kitchen. Minor additional modifications as illustrated in drawings.
On file for this project
1 document · 4 drawing sheets
Interior renovation to apartment 20D as per plans. No change in use egress or occupancy.
On file for this project
8 documents
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15Unit 15C, Unit 15MUnder Construction18p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
IN UNIT 15C ON 15TH FLOOR, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
10 documents
in apartment 15M, relocate one sink, one gas stove, install one dishwasher, one shower, remove one tub, replace one lavatory, one toilet, no change to use, exits or occupancy
On file for this project
12 documents
renovation apartment 15M, no change to use, exits or occupancy
On file for this project
4 documents
Floor 14
Floor 13
Floor 12Unit 12A, Unit 12F, Unit 12S12p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction
IN UNIT 12A AND 12S, DEMOLITION AND INSTALLATIO OF NON-LOADBEARING PARTITIONS AS SHOWN IN PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES (APT 12F) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Floor 11Unit 11M, Unit 11N, Unit 11MN19p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Propose plumbing modifications for apartment 11MN combination all as per plans herewith filed.
On file for this project
12 documents
Floor 10
Floor 9
Floor 8
Floor 7Unit 7E6p · 2 filings · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION OF UNIT #7E AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
On file for this project
4 documents
PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FILED UNDER JOB #M00515742.
On file for this project
3 documents
Floor 6
Floor 5Unit 5J, Unit 5KUnder Construction10p · 1 filing · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing work related to the combination of apartments 5K and 5J into a single apartment. General plumbing fixture changes.
On file for this project
15 documents
Floor 4
Floor 3Akam Associates, INC.4p · 2 filings · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - EDEN GARDEN MARKETPLACE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
APARTMENT 2E: REPLACE LAV, WC. REMOVE TUB ADD SHOWER.
On file for this project
5 documents
Floor 2Unit 2E, Unit 2H11p · 3 filings · 20 docs
ArchitectureDMGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
Apt 2H: Interior renovations as per plans filed herewith, No change to use, egress or occupancy
On file for this project
12 documents · 6 drawing sheets
NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - EDEN GARDEN MARKETPLACE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
APARTMENT 2E: REPLACE LAV, WC. REMOVE TUB ADD SHOWER.
On file for this project
5 documents
Floor 1Akam Associates, INC.13p · 10 filings · 20 docs
ArchitectureDMEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Cellar and courtyard wall repairs in conjunction with sidewalk replacement at west of property.
On file for this project
6 documents
INTERIOR RENOVATIONS FOR A PROPOSED FOOD MARKET ON THE 1ST AND CELLAR FLOORS. INSTALL NEW REFRIGERATION COMPRESSORS. PLUMBING WORK FILED UNDER APP #M00889730
On file for this project
19 documents · 4 drawing sheets
NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - EDEN GARDEN MARKETPLACE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 10 filings on this floor.
CellarAkam Associates, INC.13p · 5 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingOther
Issued Permit Scope
General Construction · Plumbing
Cellar and courtyard wall repairs in conjunction with sidewalk replacement at west of property.
On file for this project
6 documents · 1 drawing sheet
INTERIOR RENOVATIONS FOR A PROPOSED FOOD MARKET ON THE 1ST AND CELLAR FLOORS. INSTALL NEW REFRIGERATION COMPRESSORS. PLUMBING WORK FILED UNDER APP #M00889730
On file for this project
19 documents · 6 drawing sheets
NEW PLUMBING FIXTURES FOR PROPOSED MARKET ON CELLAR & 1ST FLOORS. IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER APP #M00889577.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Site & exteriorAkam Associates, INC.14p · 6 filings · 20 docs
ArchitectureCivilEquipmentGeneralStructural
Issued Permit Scope
General Construction · Sidewalk Shed · Sign · Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
2 documents · 4 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCBC
On file for this project
2 documents · 4 drawing sheets
Leak repairs as per plans filed here with. No change in use, occupancy or egress.
On file for this project
7 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.