← Back
BuildNYC
Elevator cooperative
201 WEST 16TH STREET
MANHATTAN · BIN 1013813
💬 Discuss this project
1930Year Built
19Stories
D4Building Class
C6-3AZoning
101,221 sfGross Floor Area
115Units
LL97 CoveredRent Stabilized8 Active Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 201 West 16 Owners · 6,949 sf lot · 14.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofThe Shade Store20p · 8 filings · 20 docs
PenthouseUnit PH112p · 2 filings · 20 docs
Floor 18Unit 18E, Unit 19A, Unit 19D +135p · 7 filings · 20 docs
Floor 17
Floor 16
Floor 15Unit 15D10p · 2 filings · 10 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10Unit 10A, Unit 10E, Unit 10G14p · 4 filings · 20 docs
Floor 9
Floor 8Unit 8BC3p · 2 filings · 7 docs
Floor 7Unit 7C1 filing · 6 docs
Floor 6Unit 6C5p · 1 filing · 4 docs
Floor 5
Floor 4Unit 4A, Unit 4C7p · 4 filings · 20 docs
Floor 3Proposed Alteration at1 filing · 13 docs
Floor 2Unit 2A, Unit 2G27p · 5 filings · 20 docs
Floor 1New and modified mechanical system13p · 9 filings · 20 docs
CellarPartial cellar workUnder Construction19p · 5 filings · 20 docs
Site & exteriorThe Shade Store33p · 8 filings · 20 docs
Filed — no permit issuedEngineered enclosure system5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
201 West 16 Owner9003/22/2026
Time Equities1304/09/2026
201 W 16 St Owners Corp Tudorrea803/21/2026
Vesta Group703/21/2026
50 West Street Condominium607/08/2026
201 W 16th403/21/2026
Cooperative Equities Group IV203/21/2026
Goderich203/21/2026
Equities Time103/22/2026
16 Owners Corp 201 West103/22/2026
Aaron Bollman and Company103/22/2026
Wesbuilt103/22/2026
Telebeam Tele103/21/2026
Inspeco103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jon Libasci RA1003/21/2026
J Callahan Consulting2203/21/2026
Dynamic Building Consultants1003/21/2026
Jack Callahan Consulting603/21/2026
Housing Works303/21/2026
Municipal Building Consultants303/21/2026
ZV Drafting103/21/2026
Kma Designs603/21/2026
Arsenal Building Consultants203/21/2026
SMB Consultant203/21/2026
SKY Management Group403/21/2026
Edward F Zevallos Architect803/21/2026
Anthony Morali Architect603/21/2026
Kazam Consultants403/21/2026
Up Design Services103/21/2026
J.A.M. Associates403/21/2026
HS Design Studio203/21/2026
JMV Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Fine Interiors & WoodwGeneral Contractor1207/08/2026
Structural Preservation *General Contractor1104/09/2026
Kings Group NYScaffold707/08/2026
SPK/Lewis ConstructionGeneral Contractor707/08/2026
Winstar Restorationspecialty_contractor603/21/2026
AJ Renovation GroupGeneral Contractor603/21/2026
Kovic International ContractingGeneral Contractor403/21/2026
Andamio ScaffoldingScaffold407/08/2026
AV Brad ConstructionGeneral Contractor407/08/2026
Creo ProjectsGeneral Contractor407/08/2026
Z-Dar ContractingGeneral Contractor407/08/2026
Voltage ElectricElectrical403/22/2026
Wesbuilt Construction ManGeneral Contractor403/21/2026
Sonna HenryGeneral Contractor303/21/2026
Lawrence Exterior Restorationspecialty_contractor307/08/2026
Winstar RestorationScaffold303/21/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
Voltage ElectricElectrical203/21/2026
Balaton ConsultingSign hanger207/08/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Aqua Plumbing & HeatingPlumbing107/08/2026
CC Controlled Plumbing CoPlumbing107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
G.P. MechanicalPlumbing107/08/2026
PipestylistsPlumbing107/08/2026
Procore MechanicalPlumbing107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
Star Cities PLB & HeatingPlumbing107/08/2026
Top Dog Plumbing & HeatingPlumbing107/08/2026
Unipipe Plumbing & HeatingPlumbing107/08/2026
Vertex P & HPlumbing107/08/2026
Accurate Electrical ContractorsElectrical103/22/2026
Zerega ContractingPlumbing107/08/2026
Arree ElectricElectrical103/22/2026
Avellino Electrical ContractingElectrical103/21/2026
Bronxdale ElectricElectrical103/22/2026
Walliccan Electrical ContractingElectrical103/21/2026
Denmar ElectricElectrical103/22/2026
Eis Electric Corp DbaElectrical103/22/2026
High-Light ElectricalElectrical103/22/2026
Roma ElectricElectrical103/21/2026
Jumper ElectricElectrical103/22/2026
Mutual ElectricElectrical103/21/2026
Moskowitz StuartElectrical103/21/2026
P.S. Marcato Elev. CoElectrical103/21/2026
Spectrum ElectricElectrical103/21/2026
Matros Automated ElectricalElectrical103/21/2026
Word of Light ElectricElectrical103/22/2026
360 General Contracting IGeneral Contractor107/08/2026
C C Controlled CombustionGeneral Contractor109/13/2026
MK ImprovementsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Robert F. Germain Jr. PE5100408/20/2026
Frank Nigro Architect3211108/08/2025
AK Engineering678206/05/2025
Luke Licalzi P.E3679505/28/2025
Solomon Rosenzweig P.E. P1801205/19/2025
Abs Engineering4835705/12/2025
Rodman Paul Architects PL7162405/09/2025
Outsource Special Inspection2827604/29/2025
Dean Mendez Architect, P8621106/11/2024
Engineering Solutions, PL6492405/29/2024
Alan Margolin & Associates423107/13/2023
Anthony Morali Architect4810306/01/2023
HRF Services5616202/06/2023
Jon Libasci3068202/15/2022
Catalpa Special Inspectio2004209/22/2021
Charles G Michel Engineering2871102/26/2020
Building Lifecycle
All (300)Filed (66)Permit Issued (53)Signed Off (40)Facade (FISP) (6)Violation (12)Inspection (36)Objection (57)Special Inspection (30)
10/05/2026
Filed — Alteration
FILING TO SHOW PLUMBING WORK THROUGHOUT AS PER PLANS IN APARTMENT 7C
M01440424-S1
10/05/2026
Filed — Alteration
FILING TO SHOW PLUMBING WORK THROUGHOUT AS PER PLANS IN APARTMENT 7C
M01440424-I1
09/11/2026
Permit issued — General Construction
M01178628-S1-GC
08/20/2026
Filed — Alteration
INSTALL NEW GAS FIRED HOT WATER HEATER WITH (2) NEW STORAGE TANKS. RECONNECT LOW PRESSURE GAS LINE. NO CHANGE IN MEANS IF EGRESS USE GROUP OR OCCUPANCY.
M01178628-S1
06/08/2026
Signed off — Alteration
FILING FOR INTERIOR RENOVATION OF EXISTING CLASS "A" APARTMENT (UNIT 2A) AS PER PLANS FILED HEREWITH. NO CHANGE INUSE, EGRESS OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION.
M01212913-S1
06/04/2026
Filed — Alteration
REPLACEMENT OF 4 TON ROOFTOP CONDENSING UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01392593-I1
04/24/2026
Special inspection requirement — Final
04/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
04/24/2026
Special inspection requirement — Maintenance information
Vincent Liotta
04/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
04/24/2026
Special inspection requirement — Mechanical Systems
04/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
04/20/2026
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT. 2G ON 2ND FLOOR AS INDICATED ON PLAN. NO CHANGE IN USE OCCUPANCY, EGRESS OR BUILDING BULK
M01256195-P1
04/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING BATHROOM AT CELLAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01114120-I1
03/28/2026
Objection raised — Scope
03/12/2026
Filed — Alteration CO
Structural work in conjunction with DOB Job #M01309850-I1
M01309850-S1
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/11/2026
Special inspection requirement — Post-installed Anchors
03/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/11/2026
Special inspection requirement — Structural Steel - Details
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/11/2026
Special inspection requirement — Concrete - Cast-In-Place
03/11/2026
Special inspection requirement — Structural Steel - Welding
03/11/2026
Special inspection requirement — Structural Cold-Formed Steel
01/30/2026
Filed — Alteration
INSTALL NEW GAS FIRED HOT WATER HEATER WITH (2) NEW STORAGE TANKS. RECONNECT LOW PRESSURE GAS LINE. NO CHANGE IN MEANS IF EGRESS USE GROUP OR OCCUPANCY.
M01178628-P2
01/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
01/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2026
Special inspection requirement — Final
12/30/2025
Signed off — Alteration
PLUMBING FIXTURES INSTALLATION AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01218573-I1
12/30/2025
Signed off — Alteration
INTERIOR RENOVATION OF APARTMENT 15D AS PER PLANS FILD HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01218517-I1
11/24/2025
Filed — Alteration
INSTALL NEW GAS FIRED HOT WATER HEATER WITH (2) NEW STORAGE TANKS. RECONNECT LOW PRESSURE GAS LINE. NO CHANGE IN MEANS IF EGRESS USE GROUP OR OCCUPANCY.
M01178628-P1
11/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/29/2025
Signed off — Alteration
MINOR DUCTWORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01114197-I1
10/16/2025
Violation issued (ECB, open)
Unknown
10/16/2025
Violation issued (ECB, closed)
Unknown
09/12/2025
Permit issued — Plumbing
M01256195-S1-PL
09/09/2025
Permit issued — General Construction
M01256195-I1-GC
08/14/2025
Signed off — Alteration
interior renovation of apt 10g, no change of use , egress or occupancy
M01217689-I1
08/08/2025
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT. 2G ON 2ND FLOOR AS INDICATED ON PLAN. NO CHANGE IN USE OCCUPANCY, EGRESS OR BUILDING BULK
M01256195-I1
08/08/2025
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT. 2G ON 2ND FLOOR AS INDICATED ON PLAN. NO CHANGE IN USE OCCUPANCY, EGRESS OR BUILDING BULK
M01256195-S1
08/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/31/2025
Signed off — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M01099204-I1
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK NIGRO
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANK NIGRO
07/15/2025
Special inspection requirement — Insulation placement and R values
FRANK NIGRO
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK NIGRO
07/15/2025
Special inspection requirement — Metering
FRANK NIGRO
07/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
FRANK NIGRO
07/15/2025
Special inspection requirement — Final
FRANK NIGRO
07/15/2025
Special inspection requirement — Lighting in dwelling units
FRANK NIGRO
07/10/2025
Signed off — Alteration
Filing herewith plumbing work for the partial renovations of apartments 19A & 19D
M00849816-I1
07/07/2025
Permit issued — Structural
M01212913-S2-ST
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedC C Controlled Combustion09/11/2026
DOB NOWPlumbingSigned-offAqua Plumbing & Heating09/12/2025
DOB NOWGeneral ConstructionPermit IssuedStructural Preservation *09/09/2025
DOB NOWStructuralPermit IssuedStructural Preservation *07/07/2025
DOB NOWMechanical SystemsSigned-offStructural Preservation *07/02/2025
DOB NOWGeneral ConstructionPermit IssuedStructural Preservation *06/30/2025
DOB NOWPlumbingSigned-offVertex P & H06/13/2025
DOB NOWGeneral ConstructionSigned-offAV Brad Construction06/09/2025
DOB NOWGeneral ConstructionSigned-offStructural Preservation *05/21/2025
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co04/28/2025
DOB NOWMechanical SystemsSigned-offStructural Preservation *03/27/2025
DOB NOWGeneral ConstructionSigned-offStructural Preservation *03/13/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating02/28/2025
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical01/27/2025
DOB NOWMechanical SystemsPermit IssuedWesbuilt Construction Man12/27/2024
DOB NOWPlumbingSigned-offZerega Contracting11/20/2024
DOB NOWGeneral ConstructionPermit IssuedWesbuilt Construction Man11/13/2024
DOB NOWSuspended ScaffoldSigned-offWinstar Contracting10/04/2024
DOB NOWSidewalk ShedSigned-offKings Group NY08/29/2024
DOB NOWSupported ScaffoldSigned-offKings Group NY08/29/2024
DOB NOWGeneral ConstructionSigned-offNY Fine Interiors & Woodw07/29/2024
DOB NOWMechanical SystemsSigned-offNY Fine Interiors & Woodw07/29/2024
DOB NOWStructuralSigned-offNY Fine Interiors & Woodw07/29/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction09/15/2023
DOB NOWGeneral ConstructionSigned-offWinstar Restoration09/06/2023
DOB NOWGeneral ConstructionSigned-offWinstar Restoration09/06/2023
DOB NOWStructuralSigned-offNY Fine Interiors & Woodw08/21/2023
DOB NOWMechanical SystemsSigned-offNY Fine Interiors & Woodw08/21/2023
DOB NOWSidewalk ShedSigned-offKings Group NY08/17/2023
DOB NOWGeneral ConstructionSigned-offNY Fine Interiors & Woodw08/16/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating08/09/2023
DOB NOWStructuralPermit IssuedLawrence Exterior Restoration07/27/2023
DOB NOWGeneral ConstructionSigned-offAV Brad Construction05/02/2023
DOB NOWPlumbingSigned-offUnipipe Plumbing & Heating04/19/2023
DOB NOWMechanical SystemsSigned-offZ-Dar Contracting04/14/2023
DOB NOWGeneral ConstructionSigned-offZ-Dar Contracting04/14/2023
DOB NOWGeneral ConstructionSigned-offAJ Renovation Group02/02/2023
DOB NOWPlumbingSigned-offG.P. Mechanical11/10/2022
DOB NOWGeneral ConstructionSigned-offAV Brad Construction11/10/2022
DOB NOWGeneral ConstructionSigned-offAJ Renovation Group09/28/2022
+ 60 more permits on file
4 projects · most recent 06/04/2026
Air Conditioning Systems Heating Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
06/04/2026——Air Conditioning Systems
Cooling
Daikin WGCV048E1RTCMT 4 tons · Wshp ×1
06/05/2025Permit IssuedStructural Preservation *Air Conditioning Systems
Cooling
Mitsubishi Electric MITSUBISHI MXZ-SM36NL 41,000 BTU · Condensing Unit ×1
11/05/2024Permit IssuedWesbuilt Construction ManAir Conditioning Systems, Heating Systems
Cooling
Climatemaster TCH036AH 36,000 BTU · Wshp ×3
Heating
Indeeco QUA 10 kW · Electric Heater ×3
12/16/2020——Associated Ducts and Piping
Ducts & Piping
Juniper Elbow P0430 -  4” 1,780 CFM · Ductwork ×9
1 project · most recent 12/16/2020
FiledStatusContractorScope
12/16/2020——2 heads
5 projects · most recent 10/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/05/2026——Gas, Water/Sanitary
08/20/2026Signed-offCC Controlled Plumbing CoGas
04/20/2026Signed-offAqua Plumbing & HeatingGas, Water/Sanitary
11/05/2024Signed-offAdvanced Plumbing MechanicalWater/Sanitary
12/16/2020——Gas, Water/Sanitary
25 projects · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedL&B Electrical InternationalGeneral Wiring
06/09/2026Permit IssuedLina ElectricGeneral Wiring
03/16/2026CompletePower Surge ElectricGeneral Wiring
02/27/2026Permit IssuedVoltage ElectricGeneral Wiring
01/22/2026CompleteVoltage Electric—
01/20/2026CancelledVoltage Electric—
12/29/2025CompleteVoltage Electric—
10/19/2025CompletePower Surge ElectricGeneral Wiring
09/12/2025Permit IssuedPower Surge ElectricGeneral Wiring
08/25/2025CompleteM & M Control Wiring—
07/07/2025CompletePower Surge ElectricGeneral Wiring
06/13/2025CompleteVoltage ElectricGeneral Wiring
05/07/2025CompletePower Surge ElectricGeneral Wiring
04/16/2025CompleteAccurate Electrical ContractorsGeneral Wiring
03/30/2025CompletePower Surge ElectricGeneral Wiring
2 projects · most recent 08/20/2026
FiledStatusContractorScope
08/20/2026Permit IssuedC C Controlled Combustion1 scope_items
06/05/2025Permit IssuedStructural Preservation *1 scope_items
▾Field Inspections (DOB CAP) — 37
DateTypeResultReport
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 37.
▾Special Inspection Requirements (DOB NOW) — 145
DateRequirementInspectorRole
04/24/2026HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
04/24/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
04/24/2026Maintenance informationVincent Liottaenergy_progress
04/24/2026Final—progress
04/24/2026Mechanical Systems—special
04/24/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
03/11/2026Structural Steel - Welding—special
03/11/2026Tenant Protection Plan Compliance—special
03/11/2026Concrete - Cast-In-Place—special
03/11/2026Post-installed Anchors—special
03/11/2026Structural Cold-Formed Steel—special
03/11/2026Structural Steel - Details—special
03/11/2026Structural Steel - High Strength Bolting—special
03/11/2026Structural Stability – Alterations of existing buildings—special
01/30/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/30/2026Tenant Protection Plan Compliance—special
01/20/2026Tenant Protection Plan Compliance—special
01/20/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/02/2026Final—progress
07/15/2025Fire-Resistance Rated ConstructionFRANK NIGROprogress
07/15/2025FinalFRANK NIGROprogress
07/15/2025MeteringFRANK NIGROenergy_progress
07/15/2025Insulation placement and R valuesFRANK NIGROenergy_progress
07/15/2025HVAC-R and service water piping design and insulationFRANK NIGROenergy_progress
07/15/2025Lighting in dwelling unitsFRANK NIGROenergy_progress
Latest 25 of 145.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Shade StoreRetailRoof
Project M01392593 Alteration · Approved · 06/04/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,033 on file (BIS + DOB NOW)
▸Plans & Drawings78
▸DOB NOWPlans/Sketch72
10/06/2026M01440424-S1Request digital key ↗
10/06/2026M01440424-I1Request digital key ↗
09/04/2026M00486376-I1Request digital key ↗
Showing 3 of 72 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00343893-I1Request digital key ↗
09/04/2026M00317199-I1Request digital key ↗
09/04/2026M00440009-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00285191-I1Request digital key ↗
09/04/2026M00440012-I1Request digital key ↗
▸Applications & Permits144
▸BISPLAN / WORK APPROVAL APPLICATION75
05/01/2024103804634Open ↗
04/23/2024103804634Open ↗
06/03/2022100693251Open ↗
Showing 3 of 75 on file for this type
▸BISWORK PERMIT APPLICATION69
03/09/2022123572295Open ↗
06/02/2021123833780Open ↗
04/06/2021140974701Open ↗
Showing 3 of 69 on file for this type
▸Seals & Professional Certifications311
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION84
03/20/2020123833780Open ↗
03/09/2020123572295Open ↗
03/06/2020123856201Open ↗
Showing 3 of 84 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature77
10/06/2026M01440424-I1Open ↗
10/06/2026M01440424-S1Open ↗
09/04/2026M00343893-I1Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWProgress Inspector Seal & Signature71
09/10/2026M00440012-I1Open ↗
09/10/2026M00440012-I1Open ↗
09/01/2026M00622618-I1Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature44
09/01/2026M01212913-S2Open ↗
09/01/2026M00285191-I1Open ↗
09/01/2026M01212913-I1Open ↗
Showing 3 of 44 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
03/06/2020123856201Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/09/2020140974701Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
11/09/2020140974701Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment51
▸BISSELF-CERT PLUMBING NOTICE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING16
08/14/2020123564730Open ↗
Showing 1 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
06/18/2018123564730Open ↗
03/28/2018122857275Open ↗
08/30/2017122857275Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS2
08/17/2021123564730Open ↗
08/11/2021123564730Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/17/2021123564730Open ↗
08/11/2021123564730Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes9
07/18/2020123833780Open ↗
05/26/2020123572295Open ↗
06/18/2018123564730Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTenant Protection Plan6
09/04/2026M00343893-I1Open ↗
Showing 1 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos103
▸DOB NOWDEP ACP-5: Asbestos Assessment Report62
10/06/2026M01440424-S1Open ↗
10/06/2026M01440424-I1Open ↗
09/04/2026M00343893-I1Open ↗
Showing 3 of 62 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
11/09/2020140974701Open ↗
04/29/2020123833780Open ↗
04/17/2020123833780Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/02/2026M00730494-I1Open ↗
▸Energy Compliance82
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS41
03/20/2020123833780Open ↗
05/14/2019123564730Open ↗
08/29/2018122857275Open ↗
Showing 3 of 41 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS19
10/18/2021140974701Open ↗
09/01/2021123833780Open ↗
08/11/2021123564730Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
10/18/2021140974701Open ↗
09/01/2021123833780Open ↗
08/11/2021123564730Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/04/2026M00490635-I1Open ↗
09/03/2026M00547368-I1Open ↗
09/03/2026M00591244-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/09/2020140974701Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
03/14/2022123572295Open ↗
03/04/2022123572295Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/14/2022123572295Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY12
05/10/2024103804634Open ↗
06/23/2022100693251Open ↗
06/23/2022100693251Open ↗
Showing 3 of 12 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/08/2022123572295Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/30/2020123833780Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/14/2022123572295Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
05/10/2024103804634Open ↗
▸Approvals, Objections & Sign-offs64
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
12/01/2025123833780Open ↗
05/21/2024103804634Open ↗
06/27/2022100693251Open ↗
Showing 3 of 37 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
05/17/2024103804634Open ↗
02/16/2021140974701Open ↗
Showing 2 of 9 on file for this type
▸BISFINAL1
03/14/2022123572295Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership69
▸BISCOST AFFIDAVIT62
05/21/2024103804634Open ↗
10/18/2021140974701Open ↗
09/01/2021123833780Open ↗
Showing 3 of 62 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
03/08/2022123572295Open ↗
Showing 1 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/14/2022123572295Open ↗
▸Filing & Intake Forms78
▸BISEFILING COVER SHEET36
04/06/2020123833780Open ↗
03/20/2020123833780Open ↗
03/09/2020123572295Open ↗
Showing 3 of 36 on file for this type
▸BISBOROUGH INTAKE FORM18
04/29/2020123833780Open ↗
04/27/2020123564730Open ↗
04/06/2020123833780Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION17
08/05/2021123564730Open ↗
06/07/2021123564730Open ↗
02/16/2021140974701Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
11/09/2020140974701Open ↗
Showing 1 of 7 on file for this type
▸Other Documents19
▸DOB NOWDHCR Document6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISUnknown5
03/06/2020123856201Open ↗
03/06/2020123856201Open ↗
03/06/2020123856201Open ↗
Showing 3 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDHCR DOCUMENT1
05/17/2024103804634Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/26/2020123572295Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type