| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01464194 | 50 WEST STREET MANHATTAN | New Job Filing | Complete | 09/23/2026 | 09/22/2026 | — | APT 52BC- REMOVE REINSTALL FIXTURES |
| M01463398 | 1466 LEXINGTON AVENUE MANHATTAN | New Job Filing | Job in process | 09/22/2026 | 09/21/2026 | — | APARTMENT 1A- REPLACE PANEL BOX ,ADD NEW CIRCUITS AND OUTLETS. CORRECT VIOLATION 4967953 / 2960078 |
| M01456633 | 343 WEST 12 STREET MANHATTAN | New Job Filing | Job in process | 09/08/2026 | 09/07/2026 | — | 343 1/2 WEST 12TH STREET (REAR BUILDING). REWIRE THE ENTIRE HOUSE |
| M01445920 | 240 EAST 15 STREET MANHATTAN | New Job Filing | Job in process | 08/14/2026 | 08/13/2026 | — | ONE DEDICATED POWER LINE 110V/20 FOR SCAFFOLD LIGHTS INSTALLED BY OTHERS. TWO DEDICATED POWER LINES 110V/20AMPS FOR TWO OUTDOOR GFCI LOCATED… |
| M01443841 | 447 FT WASHINGTON AVENUE MANHATTAN | New Job Filing | Complete | 08/11/2026 | 08/10/2026 | — | Apt #42 - Replace 2 light fixtures |
| M01441172 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Job in process | 08/05/2026 | 08/04/2026 | — | LOBBY RENOVATION. ADD ADDITIONAL CIRCUITS, RETROFIT EXISTING LIGHTS & PANEL BOX, HVAC WIRING, |
| Name | Projects together | Most recent |
|---|---|---|
| Time Equities | 22 | — |
| Staten Island | 11 | — |
| New York | 8 | — |
| Pr | 7 | — |
| Te | 6 | — |
| Time Equites | 2 | — |
| 431 Ave P Equities Llc | 1 | — |
| Time Equities Inc. | 1 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01464194 | 50 WEST STREET MANHATTAN | New Job Filing | Complete | 09/23/2026 | 09/22/2026 | — | APT 52BC- REMOVE REINSTALL FIXTURES |
| M01463398 | 1466 LEXINGTON AVENUE MANHATTAN | New Job Filing | Job in process | 09/22/2026 | 09/21/2026 | — | APARTMENT 1A- REPLACE PANEL BOX ,ADD NEW CIRCUITS AND OUTLETS. CORRECT VIOLATION 4967953 / 2960078 |
| M01456633 | 343 WEST 12 STREET MANHATTAN | New Job Filing | Job in process | 09/08/2026 | 09/07/2026 | — | 343 1/2 WEST 12TH STREET (REAR BUILDING). REWIRE THE ENTIRE HOUSE |
| M01445920 | 240 EAST 15 STREET MANHATTAN | New Job Filing | Job in process | 08/14/2026 | 08/13/2026 | — | ONE DEDICATED POWER LINE 110V/20 FOR SCAFFOLD LIGHTS INSTALLED BY OTHERS. TWO DEDICATED POWER LINES 110V/20AMPS FOR TWO OUTDOOR GFCI LOCATED… |
| M01443841 | 447 FT WASHINGTON AVENUE MANHATTAN | New Job Filing | Complete | 08/11/2026 | 08/10/2026 | — | Apt #42 - Replace 2 light fixtures |
| M01441172 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Job in process | 08/05/2026 | 08/04/2026 | — | LOBBY RENOVATION. ADD ADDITIONAL CIRCUITS, RETROFIT EXISTING LIGHTS & PANEL BOX, HVAC WIRING, |
| M01441482 | 150 WEST 56 STREET MANHATTAN | New Job Filing | Job in process | 08/05/2026 | 08/04/2026 | — | APARTMENT 6703 - TEMPORARY LIGHT AND POWER |
| M01438524 | 84 CHARLES STREET MANHATTAN | New Job Filing | Complete | 07/30/2026 | 07/29/2026 | — | APT #7 - INSTALL ONE OUTLET FOR REFRIGERATOR |
| B01427680 | 345 CLINTON AVENUE BROOKLYN | New Job Filing | Job in process | 07/08/2026 | 07/07/2026 | — | APT 7D. REPLACE PANEL BOX. REWIRE KITCHEN ONLY. REPLACE DEVICES THROUGHOUT THE APARTMENT |
| B01422736 | 233A CLINTON STREET BROOKLYN | New Job Filing | Job in process | 06/25/2026 | 06/25/2026 | — | NEW METER. NEW PANEL. MAIN BREAKER |
| B01419892 | 185 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 06/20/2026 | 06/20/2026 | — | APT 10CREPLACE PANEL BOXREWIRE KITCHEN ONLYREPLACE DEVICES THROUGHOUT THE APARTMENT |
| M01419898 | 76 WEST 3 STREET MANHATTAN | New Job Filing | Job in process | 06/20/2026 | 06/20/2026 | — | APT #30REPLACE PANEL BOX NEW WIRING |
| B01397849 | 185 CLINTON AVENUE BROOKLYN | PAA | Job in process | 05/06/2026 | 05/06/2026 | — | APT #11B REPLACE PANEL BOX.REWIRE KITCHEN ONLYREPLACE DEVICES THROUGHOUT THE APARTMENT |
| M01394494 | 76 WEST 3 STREET MANHATTAN | New Job Filing | Job in process | 04/29/2026 | 04/29/2026 | — | APT 30- TEMPORARY LIGHT & POWER |
| M00021193 | 425 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 04/08/2026 | 04/08/2026 | — | Apt #6J - Replace light fixture |
| M01365496 | 100 7 AVENUE MANHATTAN | New Job Filing | Job in process | 02/27/2026 | 02/27/2026 | — | BASEMENT- INSTALL LIGHT FIXTURES & EXIT SIGN (20 PCS) |
| B01364023 | 233A CLINTON STREET BROOKLYN | New Job Filing | Job in process | 02/25/2026 | 02/25/2026 | — | Rewire the entire house |
| M01361222 | 519 HUDSON STREET MANHATTAN | New Job Filing | Complete | 02/18/2026 | 02/18/2026 | — | APT #2RS- REWIRE ENTIRE APARTMENT- REPLACE PANEL BOX |
| M01351615 | 519 HUDSON STREET MANHATTAN | New Job Filing | Job in process | 01/27/2026 | 01/27/2026 | — | AOT 2RS - TEMPORARY LIGHT & POWER |
| M01349925 | 100 7 AVENUE MANHATTAN | New Job Filing | Complete | 01/22/2026 | 01/22/2026 | — | BASEMENT-TEMPORARY LIGHTSCORRECT VIOLATION #039163787M |
| B01342523 | 185 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 01/06/2026 | 01/06/2026 | — | APT 7C BATHROOM - REPLACE, REPAIR DEFECTIVE OUTLET & SWITHKITCHEN- REPLACE DEFECTIVE GFCI OUTLETS |
| B01340365 | 185 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 12/29/2025 | 12/29/2025 | — | APT 7CBATHROOM- REPLACE-REPAIR OUTLET- SWITCHKITCHEN- REPLACE DEFECTIVE GFCI OUTLETS |
| M01340411 | 100 7 AVENUE MANHATTAN | New Job Filing | Complete | 12/29/2025 | 12/29/2025 | — | BASEMENT- REPAIRS FOR UNSAFE CONDITIONS - OPEN SPLICES, LIGHTS, WIRES HANGING |
| B01338514 | 185 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 12/22/2025 | 12/22/2025 | — | Apt 7CRepair outlet on the bathroom- Check power loss |
| B01338515 | 210 CLINTON AVENUE BROOKLYN | New Job Filing | Job in process | 12/22/2025 | 12/22/2025 | — | APT 10CREPLACE PANEL BOX. REWIRE KITCHEN ONLY. REPLACE DEVICE THROUGHOUT THE APARTMENT |
| B01323582 | 185 CLINTON AVENUE BROOKLYN | PAA | Job in process | 11/23/2025 | 11/23/2025 | — | APT 7AREPLACE PANEL BOX.REWIRE KITCHEN ONLY. REPLACE DEVICES THROUGHOUT THE APARTMENT |
| M01319817 | 100 7 AVENUE MANHATTAN | New Job Filing | Job in process | 11/16/2025 | 11/16/2025 | — | BASEMENT - TEMPORARY LIGHTSCORRECT VIOLATION #039163787M |
| M01316045 | 230 THOMPSON STREET MANHATTAN | New Job Filing | Job in process | 11/08/2025 | 11/08/2025 | — | APT 29 - REWIRE THE ENTIRE APARTMENTNEW PANEL BOX |
| B01306752 | 233A CLINTON STREET BROOKLYN | New Job Filing | Complete | 10/22/2025 | 10/22/2025 | — | Temporary light & power |
| M01303601 | 494 AMSTERDAM AVENUE MANHATTAN | New Job Filing | Complete | 10/16/2025 | 10/16/2025 | — | APT 3B - REPAIR BATHROOM LIGHT FIXTURE |
| M01303602 | 169 AVENUE A MANHATTAN | New Job Filing | Complete | 10/16/2025 | 10/16/2025 | — | MAIN ENTRANCE- INSTALL LIGHT FIXTURE IN EXISTING BOX |
| M01300902 | 52 BEAVER STREET | New Job Filing | Complete | 10/10/2025 | 10/10/2025 | — | APT 101 - 3 OUTLETS, 1 SWITCH, 1 LIGHT |
| M01300199 | 50 WEST STREET MANHATTAN | New Job Filing | Complete | 10/09/2025 | 10/09/2025 | — | Main front entrance- replace 4 lights |
| X01291571 | 4410 CAYUGA AVENUE BRONX | New Job Filing | Complete | 09/23/2025 | 09/23/2025 | — | APT 2E. REPLACE 2 LIGHT FIXTURES |
| B01283189 | 345 CLINTON AVENUE BROOKLYN | New Job Filing | Job in process | 09/07/2025 | 09/08/2025 | — | APT 12C- REPLACE PANEL BOX.REWIRE KITCHEN ONLY. REPLACE DEVICES THROUGHOUT THE APARTMENT |
| M01267198 | 230 THOMPSON STREET MANHATTAN | New Job Filing | Complete | 08/06/2025 | 08/06/2025 | — | APT 28- INSTALL 5 LIGHTS |
| M01264256 | 343 WEST 12 STREET MANHATTAN | New Job Filing | Job in process | 07/31/2025 | 07/31/2025 | — | 343 1/2 W 12 STREET- COTTAGE (REAR BUILDING)NEW SERVICE SWITCH, METER AND FEEDERS / PANEL BOX |
| M01253119 | 9 DUTCH STREET MANHATTAN | New Job Filing | Complete | 07/09/2025 | 07/09/2025 | — | APT 302- REPLACE OUTLETS, 1 SWITCH AND ONE LIGHT |
| M01248508 | 170 SPRING STREET MANHATTAN | New Job Filing | Complete | 07/02/2025 | 07/02/2025 | — | APT 11 - ADD 5 OUTLETS IN THE KITCHEN |
| M01244936 | 150 WEST 56 STREET MANHATTAN | New Job Filing | Job in process | 06/22/2025 | 06/22/2025 | — | APT 5804 - REPLACE PANEL BOX, NEW DEVICES, NEW CIRCUITS |
| M01242980 | 52 BEAVER STREET | New Job Filing | Complete | 06/18/2025 | 06/18/2025 | — | Apt 101 - Replace 6 lights, 2 outlets and 2 switches |
| M01242037 | 425 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 06/16/2025 | 06/16/2025 | — | Combined Apartments 7C+7D. Replace 2 panels. New wiring. No change in occupancy. |
| M01240853 | 100 7 AVENUE MANHATTAN | New Job Filing | Complete | 06/13/2025 | 06/13/2025 | — | APT 15D - REPLACE PANEL AND REWIRE THE ENTIRE APARTMENT |
| B01237109 | 345 CLINTON AVENUE BROOKLYN | New Job Filing | Job in process | 06/05/2025 | 06/05/2025 | — | APT 6E- REPLACE PANELREWIRE KITCHEN ONLYREPLACE DEVICES THROUGHOUT THE APARTMENT |
| M01217564 | 447 FT WASHINGTON AVENUE MANHATTAN | New Job Filing | Complete | 04/29/2025 | 04/29/2025 | — | APT #43 - REPLACE 2 LIGHT FIXTURES |
| M01213811 | 70 WEST 36 STREET MANHATTAN | New Job Filing | Job in process | 04/22/2025 | 04/22/2025 | — | POWER FOR FIRE ALARM SYSTEM FROM CELLAR TO 16TH FLOOR |
| M00062774 | 306 WEST 97 STREET MANHATTAN | New Job Filing | Complete | 04/16/2025 | 04/16/2025 | — | Apt 31 - Repair light + switch |
| M01210201 | 425 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 04/14/2025 | 04/14/2025 | — | APT 5G- REPLACE 2 OUTLETS |
| M01209559 | 425 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 04/11/2025 | 04/11/2025 | — | APT 5G - REPAIR LIGHTS AND OUTLET |
| M01207123 | 48 BEAVER STREET MANHATTAN | New Job Filing | Complete | 04/08/2025 | 04/08/2025 | — | REPLACE DEFECTIVE LIGHTS |
| M01207124 | 48 BEAVER STREET MANHATTAN | New Job Filing | Complete | 04/08/2025 | 04/08/2025 | — | REPLACE LIGHTING STAIR ""C"" |
| M01207125 | 48 BEAVER STREET MANHATTAN | New Job Filing | Complete | 04/08/2025 | 04/08/2025 | — | APT 102 -REPLACE LIGHTS |
| M01205059 | 76 WEST 3 STREET MANHATTAN | New Job Filing | Complete | 04/03/2025 | 04/03/2025 | — | replace 2 outdoor lights main entrance and install one light service door |
| M01205061 | 230 THOMPSON STREET MANHATTAN | New Job Filing | Complete | 04/03/2025 | 04/03/2025 | — | REPLACE 2 LIGHTS MAIN ENTRANCE AND INSTALL ONE LIGHT SERVICE ENTRANCE |
| M01203045 | 41 JOHN STREET MANHATTAN | New Job Filing | Complete | 03/31/2025 | 03/31/2025 | — | Replace EXIT EM AND INSTALL LIGHT ABOVE EXIT EM DOOR |
| M01203046 | 9 DUTCH STREET MANHATTAN | New Job Filing | Complete | 03/31/2025 | 03/31/2025 | — | INSTALL 2 LED FIXTURES ABOVE DOOR AND SUPPLY AND INSTALL 1 LED LIGHT SERVICE ENTRANCE |
| B01199682 | 210 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 03/24/2025 | 03/24/2025 | — | APT #7BREPLACE PANEL BOX, REWIRE APARTMENT |
| M01166642 | 170 SPRING STREET MANHATTAN | New Job Filing | Complete | 01/14/2025 | 01/14/2025 | — | Apt #3 |
| M01166645 | 170 SPRING STREET MANHATTAN | New Job Filing | Complete | 01/14/2025 | 01/14/2025 | — | APT #9 - REPLACE 1 LIGHT FIXTURE |
| M01157426 | 130 WILLIAM STREET MANHATTAN | New Job Filing | Complete | 12/18/2024 | 12/18/2024 | — | APT 55B - INSTALL CHANDELIER LIVING ROOM |
| M01156163 | 316 BLEECKER STREET MANHATTAN | New Job Filing | Job in process | 12/16/2024 | 12/16/2024 | — | SERVICE UPGRADE. REWIRE APARTMENTS AND STAIRWAY AND MECHANICAL ROOMADD ONE WATER HEATER IN THE CELLAR/BASEMENT |
| M01136007 | 9 DUTCH STREET MANHATTAN | New Job Filing | Job in process | 11/01/2024 | 11/01/2024 | — | DEDICATED POWER LINE 110V/20AMPS FROM PLP OWNER PANEL AND 30 AMP BREAKER WITH PIGTAIL FOR SCAFFOLDING LIGHTS TO BE INSTALLED BY OTHERS |
| M01115357 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Complete | 09/23/2024 | 09/23/2024 | — | 17th Floor- Replaced (7) EXIT/EM lights |
| M01111040 | 80 NASSAU STREET MANHATTAN | New Job Filing | Job in process | 09/13/2024 | 09/13/2024 | — | SUPPLY & INSTALL DEDICATED CIRCUIT 110V/20A FROM PLP PANEL FOR SCAFFOLDING LIGHTS to be install by othersInstall 30 AMP Breaker with pigtail… |
| M01107936 | 48 BEAVER STREET MANHATTAN | New Job Filing | Complete | 09/09/2024 | 09/09/2024 | — | APT 204 - REPLACE 10 LIGHTS |
| M01107979 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Complete | 09/09/2024 | 09/09/2024 | — | 5th floor - replace (8) exit/em lights |
| M01106523 | 327 WEST 52 STREET MANHATTAN | New Job Filing | Complete | 09/05/2024 | 09/05/2024 | — | Lobby- Install 10 recessed lights |
| M01105806 | 327 WEST 52 STREET MANHATTAN | New Job Filing | Complete | 09/04/2024 | 09/04/2024 | — | 1st floor hallway- replace 7 lights and add 3 lights |
| M01091782 | 75 KENMARE STREET MANHATTAN | New Job Filing | Complete | 08/06/2024 | 08/06/2024 | — | 8th floor (roof)- install one outlet |
| M01089712 | 55 5 AVENUE MANHATTAN | New Job Filing | Complete | 08/01/2024 | 08/01/2024 | — | 17th Floor- Replacement of EXIT/EM lights |
| M01089723 | 55 5 AVENUE MANHATTAN | New Job Filing | Complete | 08/01/2024 | 08/01/2024 | — | 16,18,19 FLOORS REPLACEMENT OF EXIT/EM LIGHTS |
| M01089745 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Complete | 08/01/2024 | 08/01/2024 | — | 12 floor (AG consulting) - Install 6 outlets |
| M01090063 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Complete | 08/01/2024 | 08/01/2024 | — | 11TH AND 12 FLOORS COMMON AREAS- REPLACE EXIT/EM LIGHTS |
| M01090088 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Complete | 08/01/2024 | 08/01/2024 | — | 15TH FLOOR DRUG POLICY ALLIANCE-REPLACE 6 EM AND (2) EXIT/EM LIGHTS |
| M01089039 | 55 5 AVENUE MANHATTAN | New Job Filing | Complete | 07/31/2024 | 07/31/2024 | — | 13TH FLOOR- REPLACE 6 LIGHTS + 4 LED BULBS |
| M01089050 | 55 5 AVENUE MANHATTAN | New Job Filing | Complete | 07/31/2024 | 07/31/2024 | — | 14th floor- replace exit-em lights |
| M01085603 | 519 HUDSON STREET MANHATTAN | New Job Filing | Complete | 07/24/2024 | 07/24/2024 | — | APT 5FN- REMOVE 2 OUTLETS AND 1 SWITCH. ADD ONE OUTLET |
| M01085899 | 502 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 07/24/2024 | 07/24/2024 | — | APT 8J - ADD LIGHT FIXTURES. REPLACE EXISTING OUTLETS, SWITCHES.feeders for washer-drier |
| M01083776 | 100 7 AVENUE MANHATTAN | New Job Filing | Complete | 07/22/2024 | 07/22/2024 | — | APT 5C - REPLACE 2 LIGHTS - BATHROOM AND CLOSET |
| M01081307 | 425 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 07/16/2024 | 07/16/2024 | — | Apt 6H- Install 1 new outlet for stove using existing power |
| B01080557 | 185 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 07/14/2024 | 07/14/2024 | — | APT 11G- REPLACE PANEL BOX- REWIRE |
| M01079177 | 48 BEAVER STREET MANHATTAN | New Job Filing | Complete | 07/11/2024 | 07/11/2024 | — | CELLAR COMPACTOR ROOM- INSTALL (10) OUTLETS |
| M01077576 | 154 PERRY STREET MANHATTAN | New Job Filing | Complete | 07/08/2024 | 07/08/2024 | — | APT 1A- REPLACE PANEL BOX. REWIREGC PERMIT M01037967 |
| B01075721 | 345 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 07/02/2024 | 07/02/2024 | — | APT 6G- REPLACE PANEL BOX- NEW WIRING |
| M01075193 | 48 BEAVER STREET MANHATTAN | New Job Filing | Complete | 07/02/2024 | 07/02/2024 | — | APT #503 - REPLACE 6 LIGHTS SAME LOCATION |
| M01075196 | 502 AMSTERDAM AVENUE MANHATTAN | New Job Filing | Complete | 07/02/2024 | 07/02/2024 | — | APT 8- REPLACE 5 OUTLETS , ADD 2 OUTLETS. REPLACE 1 LIGHT |
| M01074479 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Complete | 07/01/2024 | 07/01/2024 | — | LOBBY 1 EXIT EM LIGHT REPLACE10TH FLOOR REPLACE (4) EXIT EM LIGHTS |
| M01072357 | 2552 BROADWAY MANHATTAN | New Job Filing | Complete | 06/26/2024 | 06/26/2024 | — | APT 5J - ADD NEW OUTLET AND NEW SWITCH |
| M01070843 | 130 WILLIAM STREET MANHATTAN | New Job Filing | Complete | 06/24/2024 | 06/24/2024 | — | apt 55b - REPLACE 4 LIGHTS AND 3 SWITCHES |
| M01068753 | 2552 BROADWAY MANHATTAN | New Job Filing | Complete | 06/19/2024 | 06/19/2024 | — | APT 5J-REPLACE 5 OUTLETSAPT 6C- ADD ONE OUTLET |
| B01065788 | 345 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 06/12/2024 | 06/12/2024 | — | APT 1C- rewire kitchen. replace panel box. replace devices throughout the apartment |
| M01065249 | 129 EAST 82 STREET MANHATTAN | New Job Filing | Complete | 06/12/2024 | 06/12/2024 | — | STORE 1212A SMOKE SHOP - REPAIR (4) LIGHT FIXTURES |
| M01061517 | 48 BEAVER STREET MANHATTAN | New Job Filing | Complete | 06/05/2024 | 06/05/2024 | — | Apt 702 - Replace lights, outlets, switch |
| M01059511 | 519 HUDSON STREET MANHATTAN | New Job Filing | Complete | 05/31/2024 | 05/31/2024 | — | Apt 1E - Replace 5 outlets and 1 switch |
| M01054910 | 132 WEST 32 STREET MANHATTAN | New Job Filing | Complete | 05/22/2024 | 05/22/2024 | — | 16th Floor- Replace 5 EXIT/EM lights |
| M01053024 | 129 EAST 82 STREET MANHATTAN | New Job Filing | Complete | 05/17/2024 | 05/17/2024 | — | SMOKE SHOP-STORE # 1212A |
| M01045554 | 76 WEST 3 STREET MANHATTAN | New Job Filing | Complete | 05/03/2024 | 05/03/2024 | — | Apt 10. Replace 6 outlets and 2 switches |
| M01044927 | 129 EAST 82 STREET MANHATTAN | New Job Filing | Complete | 05/02/2024 | 05/02/2024 | — | store- replace outlets |
| B01027000 | 185 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 03/28/2024 | 03/28/2024 | — | Apt 3G- Replace outlets and switches |
| B01027001 | 210 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 03/28/2024 | 03/28/2024 | — | APT 10D - REPLACE PANEL- NEW WIRING |