204 WEST HOUSTON STREET
MANHATTAN · West Village · BIN 1080058
💬 Discuss this project
1869Year Built
5Stories
D4Building Class
R6Zoning
37,968 sfGross Floor Area
29Units
Rent Stabilized1 Active Violation ▸
Elevator cooperative · Owner of record: 200 West Houston Owners · 10,559 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofExterior repair and facade restorationUnder Construction6p · 3 filings · 20 docs
Floor 5Unit 5CUnder Construction6p · 2 filings · 20 docs
Floor 4Unit 4A, Unit 4B, Unit 4CUnder Construction7p · 4 filings · 20 docs
Floor 3
Floor 2
Floor 1Unit 1A5p · 2 filings · 11 docs
Cellar5p · 2 filings · 11 docs
Site & exteriorHeavy duty sidewalk shed installation10p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Berkowners603/22/2026
200 West Houston Owners403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adal Engineering110/26/2026
BLD Lab Architecture309/23/2026
Fred W. Torrico Architect103/31/2026
Sandeep Gunnala Engineering101/28/2022
Inm Architects109/28/2021
Versai109/13/2021
David Silberman, P.E.308/17/2021
Morozov208/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WJ Professional Expediting203/21/2026
BMB Building Consulting203/21/2026
Scarano Architect603/21/2026
Top Out Consultants203/21/2026
Highrise Group NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Romo ConstructionGeneral Contractor603/21/2026
Romo ConstructionScaffold303/21/2026
Kairi SolutionsGeneral Contractor303/21/2026
J.K. RemodelingGeneral Contractor211/08/2026
Proud Build ConstructionGeneral Contractor203/21/2026
Signore & Sons PlumbingPlumbing207/08/2026
A.M.N.Plumbing107/28/2026
High Quality ElectricElectrical103/21/2026
Tap PlumbingPlumbing107/08/2026
Cresco ElectricalElectrical103/21/2026
A.S.P. for HireGeneral Contractor106/02/2026
Brochi ConstructionGeneral Contractor107/08/2026
Coolquest Mechanicalspecialty_contractor110/30/2026
Kairi Solutionsspecialty_contractor107/08/2026
Amer-A-Pipe Plumbing & HeatingPlumbing111/27/2017
MetrobuildGeneral Contractor111/03/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Adal Engineering4205110/26/2026
The Rajiv9613209/23/2026
Mohammad Ahead - Professi9286103/31/2026
Versai8133109/13/2021
Greenline Developers3447308/17/2021
Richmond Testing Lab263108/19/2019
Building Lifecycle
11/04/2026
Permit renewed — General Construction
Renewed without changes
M01347040-I1-GC
10/29/2026
Permit issued — Mechanical Systems
M01347040-S3-MS
10/26/2026
Filed — Alteration
Replace existing access stair with new access stair in existing floor opening. No change to egress, use, or occupancy
M01347040-S3
10/08/2026
Corrective action plan req'd-bldgis out of plumb & leaning towards EXP2. Obsvd deteriorated mortar joints and cracked/bulging brick masonry @ EXP1…
DOB violation · open
09/23/2026
Filed — Alteration
Replace existing access stair with new access stair in existing floor opening. No change to egress, use, or occupancy
M01347040-P1
92 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ.K. Remodeling11/04/2026
DOB NOWMechanical SystemsPermit IssuedCoolquest Mechanical10/29/2026
DOB NOWPlumbingPermit IssuedA.M.N.07/27/2026
DOB NOWGeneral ConstructionPermit IssuedJ.K. Remodeling07/02/2026
DOB NOWGeneral ConstructionPermit IssuedA.S.P. for Hire04/28/2026
DOB NOWSidewalk ShedSigned-offRomo Construction01/28/2022
DOB NOWGeneral ConstructionSigned-offRomo Construction10/01/2021
DOB NOWGeneral ConstructionSigned-offKairi Solutions09/30/2021
DOB NOWGeneral ConstructionSigned-offRomo Construction09/20/2021
DOB NOWPlumbingSigned-offSignore & Sons Plumbing09/20/2021
DOB NOWPlumbingSigned-offSignore & Sons Plumbing08/23/2021
DOB NOWGeneral ConstructionSigned-offProud Build Construction05/20/2021
DOB NOWGeneral ConstructionSigned-offBrochi Construction05/18/2021
DOB NOWMechanical SystemsPermit IssuedKairi Solutions03/12/2020
DOB NOWPlumbingSigned-offTap Plumbing12/11/2019
BISOTISSUEDKairi Solutions08/21/2020
BISOTISSUEDKairi Solutions09/10/2019
BISPLISSUEDAmer-A-Pipe Plumbing & Heating11/27/2017
BISOTISSUEDMetrobuild11/03/2017
1 project · most recent 08/19/2019
Ventilation Systems
FiledStatusContractorScope
08/19/2019Permit IssuedKairi SolutionsVentilation Systems
2 projects · most recent 10/26/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/26/2026Permit IssuedA.M.N.Gas, Water/Sanitary
08/19/2019Signed-offTap PlumbingWater/Sanitary
7 projects · most recent 07/16/2026
General Wiring
FiledStatusContractorScope
07/16/2026Permit IssuedJumper ElectricGeneral Wiring
06/21/2026Permit IssuedHorsepower ElectricGeneral Wiring
02/08/2022Permit IssuedHigh Quality Electric—
11/08/2021CompleteCresco ElectricalGeneral Wiring
06/15/2021CompleteCresco ElectricalGeneral Wiring
10/26/2020Permit IssuedSmitson ElectricGeneral Wiring
09/17/2019CompleteStar Electrical Contractors—
2 projects · most recent 10/26/2026
FiledStatusContractorScope
10/26/2026Permit IssuedJ.K. Remodeling—
03/31/2026Permit IssuedA.S.P. for Hire—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/26/2026Fail-Final General Construction Non-Directive 14FailView ↗
10/25/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/24/2021Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/23/2026Fire-Resistant Penetrations and JointsRajiv Fernandezspecial
09/23/2026Energy Code Compliance InspectionsLuca Farinelliprogress
09/08/2026Tenant Protection Plan Compliance—special
09/01/2026Final—progress
09/01/2026Mechanical Systems—special
03/31/2026HVAC-R and service water heating system controlsLuca Farinellienergy_progress
03/31/2026Tenant Protection Plan ComplianceMOHAMMAD AHEADspecial
03/31/2026HVAC-R and service water piping design and insulationLuca Farinellienergy_progress
03/05/2026Energy Code Compliance InspectionsLuca Farinelliprogress
02/16/2026Fire-Resistance Rated ConstructionLuca Farinelliprogress
02/12/2026Interior lighting powerRajiv Fernandezenergy_progress
02/12/2026Lighting controlsRajiv Fernandezenergy_progress
02/12/2026Lighting in dwelling unitsRajiv Fernandezenergy_progress
02/12/2026MeteringRajiv Fernandezenergy_progress
02/12/2026Energy Code Compliance InspectionsRajiv Fernandezprogress
02/09/2026Fire-Resistant Penetrations and JointsRajiv Fernandezspecial
01/15/2026FinalRajiv Fernandezprogress
09/22/2021Energy Code Compliance InspectionsNikola Martinovicprogress
09/22/2021Lighting in dwelling unitsNikola Martinovicenergy_progress
09/22/2021Lighting controlsNikola Martinovicenergy_progress
09/22/2021FinalNikola Martinovicprogress
08/27/2021FinalKlodian Pepajprogress
08/27/2021MasonryKlodian Pepajspecial
08/27/2021Structural Stability – Alterations of existing buildingsKlodian Pepajspecial
08/17/2021Fire-Resistant Penetrations and JointsDAVID SILBERMANspecial
Latest 25 of 30.
110 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account