← Back
Office only, 7-19 stories
205 EAST 67 STREET
💬 Discuss this project
1950Year Built
7Stories
O3Building Class
R8BZoning
149,484 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFISP: SWARMP
Office only, 7-19 stories · 22,650 sf lot · 6.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 3 filings · 20 docs
Mezzanine1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY609/25/2026
ROCK GROUP NY2107/08/2026
SPRING SCAFFOLDING LLC503/22/2026
WNYW FOX FIVE CO203/22/2026
WNYW FIVE CO103/22/2026
WNYW FOX5703/22/2026
SL GREEN103/22/2026
FOX TV STATION INC503/21/2026
FOX 5303/21/2026
COLGATE ENTERPRISES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MBE CODE ZONING603/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
GREEN STUDIO1203/21/2026
SKYLINE ACCESS103/21/2026
BERTOLINI ARCHITECTURAL WORKS DPC203/21/2026
RIZZO GROUP103/21/2026
PREEMPTIVE SOLUTIONS & CONSULTING L203/21/2026
HIERARCH-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SID ULMElectrical903/21/2026
ROCK GROUP NY CORPGeneral Contractor707/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
TRI-STAR CONSTRUCTION CORPGeneral Contractor403/21/2026
KINGS GROUP NY CORPGeneral Contractor409/25/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
CITY/SUBURBAN PLBG CORPPlumbing207/08/2026
AIR STREAM AIR CONDITIONINGGeneral Contractor207/08/2026
NICHE WATERPROOFING LLCGeneral Contractor206/28/2026
ENOBRAC PLUMBING, INCPlumbing103/22/2026
POWER-TECH INSTALL. ELEC'Electrical103/22/2026
ROBERT PESTONEElectrical103/21/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
A & J CRANE SERVICE INCGeneral Contractor107/08/2026
TOTAL SECURITY SOLUTIONSGeneral Contractor107/08/2026
DEPAOLA, JR, FRANKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665112/02/2025
BERTOLINI ARCHITECUTRAL W6488105/28/2025
EP INSPECTIONS AND COMMIS7079105/28/2025
TROLYDIA TESTING & INSPEC4422110/23/2024
OBAID MIAN849401/13/2023
Building Lifecycle
All (199)Filed (21)Permit Issued (26)Signed Off (12)Facade (FISP) (13)Violation (60)Inspection (9)Objection (32)Special Inspection (26)
09/24/2026
Permit issued — Supported Scaffold
M01218079-S1-SH
08/10/2026
Permit issued — Suspended Scaffold
M01227007-I1-SC
07/02/2026
Permit issued — Sidewalk Shed
M01218079-S1-SH
06/22/2026
Permit issued — Structural
M01218079-I1-GC-CX
05/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2026
Permit issued — Sidewalk Shed
M01218079-S1-SF
03/17/2026
Permit issued — Sidewalk Shed
M01218079-S1-SH
03/16/2026
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, COPING REPLACEMENT, STUCCO INSTALLATION, ROOF REPAIRS, AND MISC. FACADE REPAIRS AS PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218079-S1
01/27/2026
Permit issued — General Construction
M01218079-I1-GC-CX
12/17/2025
Permit issued — Suspended Scaffold
M01327420-I1-SC
12/05/2025
Permit issued — Suspended Scaffold
M01327304-I1-SC
12/02/2025
Filed — Alteration
Installation of IRA for facade inspection
M01327304-I1
12/02/2025
Filed — Alteration
M01327420-I1
12/02/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
12/02/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/04/2025
Signed off — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-S2
08/19/2025
Signed off — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-S1
08/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2025
Filed — Alteration
SUSPENDED SCAFFOLD INSTALLATION FOR LOCAL LAW REPAIRS AND INSPECTION
M01227007-I1
08/07/2025
Permit issued — Suspended Scaffold
M01227007-I1-SC
08/06/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/30/2025
Signed off — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-I1
06/30/2025
Signed off — Alteration
IRA to assist with FISP
M00984356-I1
06/27/2025
Permit issued — Suspended Scaffold
M00984356-I1-SC
06/25/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
06/05/2025
Objection raised — Energy
06/05/2025
Objection raised — Scope
06/05/2025
Objection raised — Scope
05/28/2025
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, COPING REPLACEMENT, STUCCO INSTALLATION, ROOF REPAIRS, AND MISC. FACADE REPAIRS AS PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218079-I1
01/24/2025
Signed off — Alteration
Supporting steel modifications for the cooling tower replacement. Cooling towers replacement filed under dob job#M08018828-I1.
M08019509-I1
12/09/2024
Permit issued — Plumbing
M01125572-S2-PL
12/03/2024
Permit issued — Mechanical Systems
M01125572-S1-MS
12/02/2024
Permit issued — General Construction
M01125572-I1-GC
11/21/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
11/04/2024
Objection raised — Scope
11/04/2024
Objection raised — Energy
11/04/2024
Objection raised — Inspections
11/04/2024
Objection raised — Accessibility
11/04/2024
Objection raised — Energy
11/04/2024
Objection raised — Scope
11/04/2024
Objection raised — Structural
11/04/2024
Objection raised — Scope
11/04/2024
Objection raised — Admin
10/23/2024
Filed — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-S2
10/23/2024
Filed — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-S1
10/23/2024
Filed — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-I1
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP09/24/2026
DOB NOWSuspended ScaffoldPermit IssuedJC SANTANA CONTRACTING CO08/10/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP07/02/2026
DOB NOWStructuralPermit IssuedNICHE WATERPROOFING LLC06/22/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP03/17/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP03/17/2026
DOB NOWGeneral ConstructionPermit IssuedNICHE WATERPROOFING LLC01/27/2026
DOB NOWSuspended ScaffoldPermit IssuedJC SANTANA CONTRACTING CO12/17/2025
DOB NOWSuspended ScaffoldPermit IssuedJC SANTANA CONTRACTING CO12/05/2025
DOB NOWSuspended ScaffoldPermit IssuedJC SANTANA CONTRACTING CO08/07/2025
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC06/27/2025
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP12/09/2024
DOB NOWMechanical SystemsSigned-offTRI-STAR CONSTRUCTION COR12/03/2024
DOB NOWGeneral ConstructionSigned-offTRI-STAR CONSTRUCTION COR12/02/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC01/26/2024
DOB NOWStructuralSigned-offA & J CRANE SERVICE INC02/16/2023
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP01/06/2023
DOB NOWMechanical SystemsSigned-offAIR STREAM AIR CONDITIONI12/09/2022
DOB NOWGeneral ConstructionSigned-offTOTAL SECURITY SOLUTIONS11/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC04/19/2022
DOB NOWMechanical SystemsSigned-offAIR STREAM AIR CONDITIONI04/15/2022
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC10/21/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/12/2021
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP06/15/2021
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/30/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP04/14/2020
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT09/07/2022
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT08/27/2021
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT05/07/2021
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT08/27/2020
BISOTISSUEDJOHN GALLIN & SON, INC09/24/2019
BISMHISSUEDJOHN GALLIN & SON, INC09/24/2019
BISMHISSUEDJOHN GALLIN & SON, INC09/24/2019
BISMHISSUEDJOHN GALLIN & SON, INC09/24/2019
BISOTISSUEDJOHN GALLIN & SON, INC09/24/2019
BISMHISSUEDJOHN GALLIN & SON, INC09/13/2019
BISMHISSUEDJOHN GALLIN & SON, INC06/20/2019
BISMHISSUEDJOHN GALLIN & SON, INC02/27/2019
BISOTISSUEDJOHN GALLIN & SON, INC02/27/2019
BISFPISSUEDUNITED FIRE PROT CORP01/18/2019
+ 36 more permits on file
12 projects · most recent 03/11/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
03/11/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
12/05/2024CompleteP.E. STONE INCGeneral Wiring
01/19/2023Permit IssuedFOX TV STATIONS INC-FOX 5—
04/29/2020CompleteILLUMINOUS ELECTRIC CORP.—
12/15/2019Permit IssuedPOWER-TECH INSTALL. ELEC'General Wiring
10/09/2019CompletePOWER-TECH INSTALL. ELEC'General Wiring
10/09/2019CompletePOWER-TECH INSTALL. ELEC'General Wiring
10/09/2019CompletePOWER-TECH INSTALL. ELEC'HVAC Wiring
07/10/2019CompletePOWER-TECH INSTALL. ELEC'—
07/10/2019CompletePOWER-TECH INSTALL. ELEC'General Wiring
10/04/2018CompletePOWER-TECH INSTALL. ELEC'General Wiring
10/04/2018CompletePOWER-TECH INSTALL. ELEC'HVAC Wiring
1 project · most recent 03/16/2026
Steel
FiledStatusContractorScope
03/16/2026Permit IssuedKINGS GROUP NY CORPSteel
1 project · most recent 03/16/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/16/2026Permit IssuedKINGS GROUP NY CORPScaffold, Sidewalk Shed
2 projects · most recent 12/02/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/02/2025Permit IssuedJC SANTANA CONTRACTING CO—
08/07/2025Permit IssuedJC SANTANA CONTRACTING COSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/25/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/02/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
12/02/2025Post-installed AnchorsKarol Zdancewiczspecial
10/10/2024Duct leakage testing, insulation and designEDWARD TOROSSIANenergy_progress
10/10/2024Lighting controlsEDWARD TOROSSIANenergy_progress
10/10/2024HVAC-R and service water heating equipmentEDWARD TOROSSIANenergy_progress
10/10/2024Maintenance informationEDWARD TOROSSIANenergy_progress
10/10/2024HVAC-R and service water heating system controlsEDWARD TOROSSIANenergy_progress
10/10/2024Interior lighting powerEDWARD TOROSSIANenergy_progress
10/10/2024Mechanical SystemsEDWARD TOROSSIANspecial
10/10/2024Energy Code Compliance InspectionsEDWARD TOROSSIANprogress
10/10/2024FinalEDWARD TOROSSIANprogress
01/06/2023Structural Stability – Alterations of existing buildingsObaid Mianspecial
11/23/2022Construction Operations Influencing Adjacent StructuresObaid Mianspecial
10/12/2022Structural Steel - DetailsObaid Mianspecial
10/12/2022FinalObaid Mianprogress
10/12/2022Structural Steel - High Strength BoltingObaid Mianspecial
10/12/2022Structural Steel - WeldingObaid Mianspecial
10/11/2022Mechanical SystemsObaid Mianspecial
10/11/2022FinalObaid Mianprogress
10/11/2022Maintenance informationObaid Mianenergy_progress
10/11/2022HVAC-R and service water heating system controlsObaid Mianenergy_progress
10/11/2022HVAC-R and service water heating equipmentObaid Mianenergy_progress
10/11/2022HVAC-R and service water piping design and insulationObaid Mianenergy_progress
04/05/2022Mechanical SystemsObaid Mianspecial
04/05/2022FinalObaid Mianprogress
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
WNYW-FOX TelevisionOtherRoof
Project M08018828 Alteration · LOC Issued · 12/09/2022
Fox TV StudiosOfficeFloor 1
Project M00726113 Alteration · LOC Issued · 05/26/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 801 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch15
09/02/2026M00712791-I1Request digital key ↗
09/02/2026M00719378-I1Request digital key ↗
09/02/2026M00726113-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/03/2026M00340795-I1Request digital key ↗
08/15/2026M00340795-P2Request digital key ↗
08/15/2026M00340795-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00340791-I1Request digital key ↗
08/15/2026M00340791-P2Request digital key ↗
08/15/2026M00340791-P1Request digital key ↗
▸Applications & Permits154
▸BISPLAN / WORK APPROVAL APPLICATION81
03/11/2024140930955Open ↗
11/20/2023121991434Open ↗
02/24/2021122233564Open ↗
Showing 3 of 81 on file for this type
▸BISWORK PERMIT APPLICATION65
08/27/2020140930955Open ↗
Showing 1 of 65 on file for this type
▸BISPLACE OF ASSEMBLY8
10/06/2023121991434Open ↗
Showing 1 of 8 on file for this type
▸Seals & Professional Certifications204
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION88
03/02/2020123850939Open ↗
03/02/2020123850939Open ↗
03/02/2020123850939Open ↗
Showing 3 of 88 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST31
03/04/2021122233564Open ↗
03/04/2021122233564Open ↗
02/18/2020123850939Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/03/2026M00340791-P1Open ↗
09/03/2026M00340791-P2Open ↗
09/03/2026M00340791-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M01125572-S1Open ↗
09/01/2026M01125572-S1Open ↗
09/01/2026M01125572-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M01125572-S1Open ↗
09/01/2026M08018828-I1Open ↗
08/29/2026M08019509-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/28/2020140930955Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/28/2020140930955Open ↗
▸Trade Schedules & Equipment58
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
09/10/2019123579626Open ↗
Showing 1 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS14
02/18/2020123850939Open ↗
02/18/2020123850939Open ↗
02/18/2020123850939Open ↗
Showing 3 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
05/25/2023123826155Open ↗
06/24/2020123583808Open ↗
06/24/2020123586841Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
01/29/2020123579635Open ↗
01/16/2020123579243Open ↗
12/31/2019123809511Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos46
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
07/28/2020140930955Open ↗
Showing 1 of 25 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/02/2026M00712791-I1Open ↗
09/01/2026M08018828-I1Open ↗
09/01/2026M08020292-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance48
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
03/02/2020123850939Open ↗
03/02/2020123850939Open ↗
02/28/2020123850939Open ↗
Showing 3 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
03/04/2021122233564Open ↗
02/28/2020123850939Open ↗
02/24/2020123850939Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/04/2021122233564Open ↗
07/28/2020140930955Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/25/2024140930955Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/25/2024140930955Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/28/2020140930955Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08018828-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00712791-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY9
06/25/2024140930955Open ↗
03/04/2021122233564Open ↗
03/04/2021122233564Open ↗
Showing 3 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMASONRY1
06/25/2024140930955Open ↗
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
06/25/2024140930955Open ↗
03/04/2021122233564Open ↗
12/04/2020121736666Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL1
06/25/2024140930955Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership89
▸BISCOST AFFIDAVIT87
03/04/2021122233564Open ↗
03/04/2021122233564Open ↗
12/04/2020121736666Open ↗
Showing 3 of 87 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/25/2024140930955Open ↗
06/25/2024140930955Open ↗
▸Filing & Intake Forms91
▸BISEFILING COVER SHEET42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISBOROUGH INTAKE FORM36
04/27/2020123155361Open ↗
04/24/2020123155361Open ↗
03/19/2020123423580Open ↗
Showing 3 of 36 on file for this type
▸BISADDITIONAL INFORMATION12
04/23/2024140930955Open ↗
11/20/2023121991434Open ↗
01/09/2020123579635Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/28/2020140930955Open ↗
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSTREET: UNMAPPED-NOTIFY EMERG. AGENCIES2
08/11/2020140930955Open ↗
06/25/2024140930955Open ↗
▸DOB NOWIRA Certification2
08/13/2026M00984356-I1Open ↗
08/13/2026M01327304-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01227007-I1Open ↗
08/13/2026M01327420-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01327420-I1Open ↗
08/13/2026M01227007-I1Open ↗