← Back
BuildNYC
Office only, 7-19 stories
205 EAST 67TH STREET
MANHATTAN · BIN 1081220
💬 Discuss this project
1950Year Built
7Stories
O3Building Class
R8BZoning
149,484 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Office only, 7-19 stories · 22,650 sf lot · 6.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofWNYW-FOX TelevisionUnder Construction15p · 4 filings · 20 docs
PenthouseSidewalk shed and work platform4p · 2 filings · 9 docs
Floor 1Fox TV Studios11p · 2 filings · 20 docs
MezzanineCooling tower replacement steel modifications1p · 1 filing · 9 docs
Site & exteriorCoating removal and masonry repairsUnder Construction27p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fox TV Station503/21/2026
FOX 5303/21/2026
WNYW Fox5303/21/2026
SL Green Realty103/22/2026
WNYW103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs103/16/2026
Ospino Engineering108/07/2025
Bertolini Architectural Works105/28/2025
Designtech610/23/2024
Desimone Consulting Engineering101/13/2023
A/R Environetics Architects105/26/2022
Urban Integrations104/18/2022
Asif Jamil, RA609/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mbe Code Zoning603/21/2026
Synergy Building Consultants203/21/2026
Green Studio1203/21/2026
Skyline Access103/21/2026
Bertolini Architectural Works203/21/2026
Codegreen103/21/2026
Preemptive Solutions & Consulting203/21/2026
Hierarch-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fox TV Stations Inc-Fox 5Electrical903/21/2026
Rock Group NYScaffold707/08/2026
Tri-Star ConstructionGeneral Contractor403/21/2026
Platinum Services NYScaffold407/08/2026
Kings Group NYScaffold409/25/2026
Spring ScaffoldingScaffold303/21/2026
City/Suburban PlumbingPlumbing207/08/2026
Niche Waterproofingspecialty_contractor206/28/2026
Air Stream Air Conditioningspecialty_contractor207/08/2026
Enobrac PlumbingPlumbing103/22/2026
Power-Tech Installation ElectricElectrical103/22/2026
P. E. StoneElectrical103/21/2026
A & J Crane ServiceGeneral Contractor107/08/2026
Total Security SolutionsGeneral Contractor107/08/2026
Abco-Peerless SprinklerFire Protection107/08/2026
Depaola, JR, FrankElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665112/02/2025
Bertolini Architecutral W6488105/28/2025
EP Inspections and Commis7079105/28/2025
Trolydia Testing & Inspec4422110/23/2024
Obaid Mian849401/13/2023
Building Lifecycle
All (196)Filed (21)Permit Issued (26)Signed Off (12)Facade (FISP) (13)Violation (60)Inspection (6)Objection (32)Special Inspection (26)
09/24/2026
Permit issued — Supported Scaffold
M01218079-S1-SH
08/10/2026
Permit issued — Suspended Scaffold
M01227007-I1-SC
07/02/2026
Permit issued — Sidewalk Shed
M01218079-S1-SH
06/22/2026
Permit issued — Structural
M01218079-I1-GC-CX
05/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2026
Permit issued — Sidewalk Shed
M01218079-S1-SH
03/17/2026
Permit issued — Sidewalk Shed
M01218079-S1-SF
03/16/2026
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, COPING REPLACEMENT, STUCCO INSTALLATION, ROOF REPAIRS, AND MISC. FACADE REPAIRS AS PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218079-S1
01/27/2026
Permit issued — General Construction
M01218079-I1-GC-CX
12/17/2025
Permit issued — Suspended Scaffold
M01327420-I1-SC
12/05/2025
Permit issued — Suspended Scaffold
M01327304-I1-SC
12/02/2025
Filed — Alteration
Installation of IRA for facade inspection
M01327304-I1
12/02/2025
Filed — Alteration
M01327420-I1
12/02/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
12/02/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
09/04/2025
Signed off — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-S2
08/19/2025
Signed off — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-S1
08/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2025
Filed — Alteration
SUSPENDED SCAFFOLD INSTALLATION FOR LOCAL LAW REPAIRS AND INSPECTION
M01227007-I1
08/07/2025
Permit issued — Suspended Scaffold
M01227007-I1-SC
07/30/2025
Signed off — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-I1
06/30/2025
Signed off — Alteration
IRA to assist with FISP
M00984356-I1
06/27/2025
Permit issued — Suspended Scaffold
M00984356-I1-SC
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
06/05/2025
Objection raised — Scope
06/05/2025
Objection raised — Energy
06/05/2025
Objection raised — Scope
05/28/2025
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, COPING REPLACEMENT, STUCCO INSTALLATION, ROOF REPAIRS, AND MISC. FACADE REPAIRS AS PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218079-I1
01/24/2025
Signed off — Alteration
Supporting steel modifications for the cooling tower replacement. Cooling towers replacement filed under dob job#M08018828-I1.
M08019509-I1
12/09/2024
Permit issued — Plumbing
M01125572-S2-PL
12/03/2024
Permit issued — Mechanical Systems
M01125572-S1-MS
12/02/2024
Permit issued — General Construction
M01125572-I1-GC
11/21/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
11/04/2024
Objection raised — Accessibility
11/04/2024
Objection raised — Scope
11/04/2024
Objection raised — Structural
11/04/2024
Objection raised — Scope
11/04/2024
Objection raised — Admin
11/04/2024
Objection raised — Inspections
11/04/2024
Objection raised — Energy
11/04/2024
Objection raised — Energy
11/04/2024
Objection raised — Scope
10/23/2024
Filed — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-S2
10/23/2024
Filed — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-S1
10/23/2024
Filed — Alteration
MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01125572-I1
10/10/2024
Special inspection requirement — Duct leakage testing, insulation and design
EDWARD TOROSSIAN
10/10/2024
Special inspection requirement — Lighting controls
EDWARD TOROSSIAN
10/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
EDWARD TOROSSIAN
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedKings Group NY09/24/2026
DOB NOWSuspended ScaffoldPermit IssuedJC Santana Contracting Co08/10/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY07/02/2026
DOB NOWStructuralPermit IssuedNiche Waterproofing06/22/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/17/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/17/2026
DOB NOWGeneral ConstructionPermit IssuedNiche Waterproofing01/27/2026
DOB NOWSuspended ScaffoldPermit IssuedJC Santana Contracting Co12/17/2025
DOB NOWSuspended ScaffoldPermit IssuedJC Santana Contracting Co12/05/2025
DOB NOWSuspended ScaffoldPermit IssuedJC Santana Contracting Co08/07/2025
DOB NOWSuspended ScaffoldSigned-offSkyline Restoration06/27/2025
DOB NOWPlumbingSigned-offCity/Suburban Plumbing12/09/2024
DOB NOWMechanical SystemsSigned-offTri-Star Construction12/03/2024
DOB NOWGeneral ConstructionSigned-offTri-Star Construction12/02/2024
DOB NOWSuspended ScaffoldSigned-offSkyline Restoration01/26/2024
DOB NOWStructuralSigned-offA & J Crane Service02/16/2023
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler01/06/2023
DOB NOWMechanical SystemsSigned-offAir Stream Air Conditioni12/09/2022
DOB NOWGeneral ConstructionSigned-offTotal Security Solutions11/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding04/19/2022
DOB NOWMechanical SystemsSigned-offAir Stream Air Conditioni04/15/2022
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY10/21/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/12/2021
DOB NOWSupported ScaffoldSigned-offRock Group NY06/15/2021
DOB NOWSidewalk ShedSigned-offRock Group NY09/30/2020
DOB NOWSidewalk ShedSigned-offRock Group NY04/14/2020
BISOTISSUEDCentral Construction Management09/07/2022
BISOTISSUEDCentral Construction Management08/27/2021
BISOTISSUEDCentral Construction Management05/07/2021
BISOTISSUEDCentral Construction Management08/27/2020
BISOTISSUEDJohn Gallin & Son09/24/2019
BISMHISSUEDJohn Gallin & Son09/24/2019
BISMHISSUEDJohn Gallin & Son09/24/2019
BISMHISSUEDJohn Gallin & Son09/24/2019
BISOTISSUEDJohn Gallin & Son09/24/2019
BISMHISSUEDJohn Gallin & Son09/13/2019
BISMHISSUEDJohn Gallin & Son06/20/2019
BISMHISSUEDJohn Gallin & Son02/27/2019
BISOTISSUEDJohn Gallin & Son02/27/2019
BISFPISSUEDUnited Fire Protection01/18/2019
+ 36 more permits on file
12 projects · most recent 03/11/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
03/11/2026Permit IssuedHigh Quality Electric of NYC—
12/05/2024CompleteP.E. StoneGeneral Wiring
01/19/2023Permit IssuedFox TV Stations Inc-Fox 5—
04/29/2020CompleteIlluminous Electric—
12/15/2019Permit IssuedPower-Tech Installation ElectricGeneral Wiring
10/09/2019CompletePower-Tech Installation ElectricHVAC Wiring
10/09/2019CompletePower-Tech Installation ElectricGeneral Wiring
10/09/2019CompletePower-Tech Installation ElectricGeneral Wiring
07/10/2019CompletePower-Tech Installation Electric—
07/10/2019CompletePower-Tech Installation ElectricGeneral Wiring
10/04/2018CompletePower-Tech Installation ElectricGeneral Wiring
10/04/2018CompletePower-Tech Installation ElectricHVAC Wiring
1 project · most recent 03/16/2026
Steel
FiledStatusContractorScope
03/16/2026Permit IssuedKings Group NYSteel
1 project · most recent 03/16/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/16/2026Permit IssuedKings Group NYScaffold, Sidewalk Shed
2 projects · most recent 12/02/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/02/2025Permit IssuedJC Santana Contracting Co—
08/07/2025Permit IssuedJC Santana Contracting CoSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/02/2025Post-installed AnchorsKarol Zdancewiczspecial
12/02/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
10/10/2024Duct leakage testing, insulation and designEDWARD TOROSSIANenergy_progress
10/10/2024Lighting controlsEDWARD TOROSSIANenergy_progress
10/10/2024HVAC-R and service water heating equipmentEDWARD TOROSSIANenergy_progress
10/10/2024Maintenance informationEDWARD TOROSSIANenergy_progress
10/10/2024HVAC-R and service water heating system controlsEDWARD TOROSSIANenergy_progress
10/10/2024Interior lighting powerEDWARD TOROSSIANenergy_progress
10/10/2024Mechanical SystemsEDWARD TOROSSIANspecial
10/10/2024Energy Code Compliance InspectionsEDWARD TOROSSIANprogress
10/10/2024FinalEDWARD TOROSSIANprogress
01/06/2023Structural Stability – Alterations of existing buildingsObaid Mianspecial
11/23/2022Construction Operations Influencing Adjacent StructuresObaid Mianspecial
10/12/2022FinalObaid Mianprogress
10/12/2022Structural Steel - WeldingObaid Mianspecial
10/12/2022Structural Steel - High Strength BoltingObaid Mianspecial
10/12/2022Structural Steel - DetailsObaid Mianspecial
10/11/2022Mechanical SystemsObaid Mianspecial
10/11/2022FinalObaid Mianprogress
10/11/2022Maintenance informationObaid Mianenergy_progress
10/11/2022HVAC-R and service water heating system controlsObaid Mianenergy_progress
10/11/2022HVAC-R and service water heating equipmentObaid Mianenergy_progress
10/11/2022HVAC-R and service water piping design and insulationObaid Mianenergy_progress
04/05/2022Mechanical SystemsObaid Mianspecial
04/05/2022FinalObaid Mianprogress
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
WNYW-FOX TelevisionOfficeRoof
Project M08018828 Alteration · LOC Issued · 12/09/2022
Fox TV StudiosOfficeFloor 1
Project M00726113 Alteration · LOC Issued · 05/26/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 801 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch15
09/02/2026M00712791-I1Request digital key ↗
09/02/2026M00719378-I1Request digital key ↗
09/02/2026M00726113-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00340791-I1Request digital key ↗
08/15/2026M00340791-P2Request digital key ↗
08/15/2026M00340791-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/03/2026M00340795-I1Request digital key ↗
08/15/2026M00340795-P2Request digital key ↗
08/15/2026M00340795-P1Request digital key ↗
▸Applications & Permits154
▸BISPLAN / WORK APPROVAL APPLICATION81
03/11/2024140930955Open ↗
11/20/2023121991434Open ↗
02/24/2021122233564Open ↗
Showing 3 of 81 on file for this type
▸BISWORK PERMIT APPLICATION65
08/27/2020140930955Open ↗
Showing 1 of 65 on file for this type
▸BISPLACE OF ASSEMBLY8
10/06/2023121991434Open ↗
Showing 1 of 8 on file for this type
▸Seals & Professional Certifications204
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION88
03/02/2020123850939Open ↗
03/02/2020123850939Open ↗
03/02/2020123850939Open ↗
Showing 3 of 88 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST31
03/04/2021122233564Open ↗
03/04/2021122233564Open ↗
02/18/2020123850939Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/03/2026M00340791-P2Open ↗
09/03/2026M00340791-P1Open ↗
09/03/2026M00340791-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M01125572-S1Open ↗
09/01/2026M01125572-S1Open ↗
09/01/2026M01125572-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M01125572-S1Open ↗
09/01/2026M08018828-I1Open ↗
08/29/2026M08019509-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/28/2020140930955Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/28/2020140930955Open ↗
▸Trade Schedules & Equipment58
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
09/10/2019123579626Open ↗
Showing 1 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS14
02/18/2020123850939Open ↗
02/18/2020123850939Open ↗
02/18/2020123850939Open ↗
Showing 3 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
05/25/2023123826155Open ↗
06/24/2020123583808Open ↗
06/24/2020123586841Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
01/29/2020123579635Open ↗
01/16/2020123579243Open ↗
12/31/2019123809511Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos46
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
07/28/2020140930955Open ↗
Showing 1 of 25 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/02/2026M00712791-I1Open ↗
09/01/2026M08018828-I1Open ↗
09/01/2026M08020292-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance48
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
03/02/2020123850939Open ↗
03/02/2020123850939Open ↗
02/28/2020123850939Open ↗
Showing 3 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
03/04/2021122233564Open ↗
02/28/2020123850939Open ↗
02/24/2020123850939Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/04/2021122233564Open ↗
07/28/2020140930955Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/25/2024140930955Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/25/2024140930955Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/28/2020140930955Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08018828-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00712791-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY9
06/25/2024140930955Open ↗
03/04/2021122233564Open ↗
03/04/2021122233564Open ↗
Showing 3 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMASONRY1
06/25/2024140930955Open ↗
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
06/25/2024140930955Open ↗
03/04/2021122233564Open ↗
12/04/2020121736666Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL1
06/25/2024140930955Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership89
▸BISCOST AFFIDAVIT87
03/04/2021122233564Open ↗
03/04/2021122233564Open ↗
12/04/2020121736666Open ↗
Showing 3 of 87 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/25/2024140930955Open ↗
06/25/2024140930955Open ↗
▸Filing & Intake Forms91
▸BISEFILING COVER SHEET42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISBOROUGH INTAKE FORM36
04/27/2020123155361Open ↗
04/24/2020123155361Open ↗
03/19/2020123423580Open ↗
Showing 3 of 36 on file for this type
▸BISADDITIONAL INFORMATION12
04/23/2024140930955Open ↗
11/20/2023121991434Open ↗
01/09/2020123579635Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/28/2020140930955Open ↗
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSTREET: UNMAPPED-NOTIFY EMERG. AGENCIES2
08/11/2020140930955Open ↗
06/25/2024140930955Open ↗
▸DOB NOWIRA Certification2
08/13/2026M00984356-I1Open ↗
08/13/2026M01327304-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01327420-I1Open ↗
08/13/2026M01227007-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01227007-I1Open ↗
08/13/2026M01327420-I1Open ↗