← Back
Over six families without stores
Reid Park Rock
2069 UNION STREET · BIN 3080820
💬 Discuss this project
1930Year Built
4Stories
C1Building Class
R6Zoning
33,276 sfGross Floor Area
27Units
LL97 CoveredRent Stabilized2 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 10,000 sf lot · 3.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 15 docs
Floor 4Under Construction64p · 2 filings · 20 docs
Floor 3Under Construction64p · 2 filings · 20 docs
Floor 2Under Construction64p · 2 filings · 20 docs
Floor 1Under Construction74p · 4 filings · 20 docs
CellarUnder Construction71p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA807/08/2026
NEW YORK CITY HOUSING AUTHORITY607/08/2026
PARSONS CONSTRUCTION407/08/2026
NYC PACT PRESERVATION PARTNERS303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC2203/21/2026
AK CONSULTING SERVICES203/21/2026
KD DESIGNS203/21/2026
RYBAK DEVELOPMENT203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor1207/08/2026
FSC D&C LLCGeneral Contractor704/09/2026
LS GENERAL CORPGeneral Contractor603/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor303/21/2026
DUAL FUEL PLUBING & HTINGPlumbing307/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor107/08/2026
A & E PLUMBING CORPPlumbing107/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031312/17/2025
Building Lifecycle
All (150)Filed (19)Permit Issued (24)Signed Off (11)Violation (60)Inspection (4)Objection (2)Special Inspection (30)
05/27/2026
Signed off — Alteration
B00972644-I1
05/21/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM EXISTING CHIMNEY -CELLAR LEVEL.
B00952079-I1
04/17/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B01019558-I1
04/17/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00952069-I1
03/31/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930806-I1
03/18/2026
Permit issued — General Construction
B00918320-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping. 27 bath tubs, 49 lavs, 48 water closets, 25 kitchen sinks.
B00972643-I1
03/10/2026
Signed off — Alteration
structural work for repair of corroded steel columns and brick pocket in cellar as needed.
B00911214-I1
01/07/2026
Signed off — Alteration
B00507581-I1
12/26/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/17/2025
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B01019558-P1
12/17/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
12/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
12/15/2025
Permit issued — Boiler Equipment
B01019558-I1-BE
12/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
12/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
12/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
12/10/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/10/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
11/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2025
Signed off — Alteration
B01013893-I1
09/25/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00952069-P1
08/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
08/20/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
08/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
08/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
08/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
08/01/2025
Permit issued — Structural
B00911214-I1-ST
06/12/2025
Violation issued (HPD, closed)
A
05/01/2025
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918320-P1
05/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
05/01/2025
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
04/14/2025
Permit issued — Sidewalk Shed
B01013893-I1-SH
03/17/2025
Permit issued — General Construction
B00918320-I1-GC
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
B
02/01/2025
Violation issued (HPD, closed)
B
02/01/2025
Violation issued (HPD, closed)
B
12/07/2024
Violation issued (HPD, closed)
A
12/07/2024
Violation issued (HPD, closed)
A
12/07/2024
Violation issued (HPD, closed)
A
12/07/2024
Violation issued (HPD, closed)
C
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC03/18/2026
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING12/15/2025
DOB NOWStructuralSigned-offFSC D&C LLC08/01/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/14/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC03/17/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING12/03/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC12/03/2024
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING12/03/2024
DOB NOWSupported ScaffoldPermit IssuedLS GENERAL CORP10/31/2024
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA09/18/2024
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP08/20/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL06/04/2024
DOB NOWStructuralSigned-offFSC D&C LLC05/30/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP05/28/2024
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC03/28/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/06/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/22/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/10/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/11/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/18/2021
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC04/28/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/14/2020
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC04/16/2019
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC04/24/2018
BIS—ISSUEDELZEE CONSTR INC10/18/1993
BISEQISSUEDELZEE CONSTRUCTION INC08/12/1993
BISPLISSUEDGRISEL PLUMBING & HEATING CORP.04/26/1993
BISEQISSUEDCOLGATE SCAFFOLDING12/15/1992
BIS—ISSUEDELZEE CONSTR INC10/01/1992
1 project · most recent 11/13/2024
Heating Systems Others
FiledStatusContractorScopeMake / Model / Capacity
11/13/2024Signed-offDUAL FUEL COMPANY LLCHeating Systems, Others
Heating
A.O. Smith A.O. SMITH BTH-199 199,000 BTU · Water Heater ×2
Lochinvar KBX-1000 1,000,000 BTU · Boiler ×2
Other
N/A n/a 1 CFM ×8
8 projects · most recent 03/13/2026
General Wiring
FiledStatusContractorScope
03/13/2026CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
02/25/2026CompleteZIN ELECTRICAL, INC—
12/23/2024Permit IssuedITKIN ELECTRIC CORP.—
12/04/2023CompleteNASH ELECTRIC SERVICES IN—
05/12/2021CompleteBDS ELECTRIC CORP.—
04/29/2021CompleteHYLAN DATACOM & ELECL LLC—
09/21/2020Permit IssuedAMIN ELECTRICAL CORP—
04/17/2018Permit IssuedUSA ELECT'L SERVICES CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/26/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
12/17/2025Heating SystemsSAMI HAJJAR P.Especial
12/17/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/17/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/17/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
12/17/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
12/17/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/10/2025Tenant Protection Plan Compliance—special
12/10/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/10/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
12/10/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
12/10/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/10/2025Heating SystemsSAMI HAJJAR P.Especial
08/20/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
08/20/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
08/20/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
08/20/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
08/20/2025Tenant Protection Plan Compliance—special
08/20/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
05/01/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/01/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/01/2025Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
05/01/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/01/2025FinalSAMI HAJJAR P.Eprogress
05/01/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
05/01/2025Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
Latest 25 of 60.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/03/2026B00037703-I1Request digital key ↗
09/01/2026B00507581-I1Request digital key ↗
08/26/2026B00965050-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026B00037703-I1Open ↗
08/25/2026B00930806-I1Open ↗
08/25/2026B00930806-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B00930806-I1Open ↗
09/01/2026B00930806-I1Open ↗
08/31/2026B00911214-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00930806-I1Open ↗
08/31/2026B00911214-I1Open ↗
08/29/2026B00952069-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026B00972643-I1Open ↗
08/23/2026B01019558-P1Open ↗
08/23/2026B01019558-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026B00930806-I1Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification4
08/25/2026B00972644-I1Open ↗
08/23/2026B01019558-I1Open ↗
08/23/2026B00952079-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
09/03/2026B00037703-I1Open ↗
08/23/2026B01019558-P1Open ↗
08/23/2026B01019558-I1Open ↗
Showing 3 of 16 on file for this type
▸Other Documents3
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B00911214-P1Open ↗
▸DOB NOWCalculations1
08/13/2026B01109037-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01109037-I1Open ↗