← Back
BuildNYC
Public elementary, junior or senior high
PS 105-BRONX
2080 CRUGER AVENUE · BIN 2130721
💬 Discuss this project
1930Year Built
4Stories
W1Building Class
R7-1Zoning
88,341 sfGross Floor Area
1Units
LL97 Covered33 Active Violations 0 unresolved · 33 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 90,000 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 105 Sen Abraham BernsteinUnder Construction82p · 3 filings · 17 docs
BulkheadP.S. 105 Sen Abraham BernsteinUnder Construction3p · 1 filing · 20 docs
PenthouseP.S. 105 Sen Abraham BernsteinUnder Construction1p · 1 filing · 20 docs
Floor 4P.S. 105 Sen Abraham BernsteinUnder Construction82p · 2 filings · 17 docs
Floor 3P.S. 105 Sen Abraham BernsteinUnder Construction79p · 2 filings · 17 docs
Floor 2P.S. 105 Sen Abraham BernsteinUnder Construction79p · 2 filings · 17 docs
Floor 1P.S. 105 Sen Abraham BernsteinUnder Construction81p · 2 filings · 17 docs
CellarP.S. 105 Sen Abraham BernsteinUnder Construction36p · 1 filing · 20 docs
BasementP.S. 105 Sen Abraham BernsteinUnder Construction27p · 2 filings · 20 docs
Sub-BasementP.S. 105 Sen Abraham BernsteinUnder Construction73p · 3 filings · 17 docs
Site & exteriorP.S. 105 Sen Abraham BernsteinUnder Construction69p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority7110/10/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants2303/21/2026
Tarek M. Zeid, P.E203/21/2026
Dseny Engineering Services603/21/2026
Tarek M Zeid P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MPCCGeneral Contractor1307/08/2026
Eagle 1 MechanicalPlumbing808/12/2026
North Shore Climate ContractingGeneral Contractor707/08/2026
MPCCScaffold507/08/2026
I.M.P. Plumbing & HeatingFire Protection410/10/2026
PJP InstallersScaffold207/08/2026
Multi-Phase Electrical ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP Engineers & Architects1438609/12/2025
Tectonic Engineering Cons1062709/12/2025
Synergic Design8561105/08/2025
Building Lifecycle
All (161)Filed (34)Permit Issued (36)Signed Off (3)Violation (3)Inspection (8)Objection (47)Special Inspection (30)
10/09/2026
Permit issued — Sprinklers
X00749580-I1-EW-SP
10/09/2026
Permit issued — Standpipe
X00749580-I1-EW-SD
08/11/2026
Permit issued — Plumbing
X00709562-S4-PL
04/14/2026
Permit issued — Mechanical Systems
X00709562-S3-MS
12/01/2025
Permit issued — Plumbing
X00709562-S6-PL
09/19/2025
Objection raised — Other
09/12/2025
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH LLW# 120622: CONSTRUCTION OF NEW BUILDING ADDITION TO EXISTING SCHOOL AS PER PLANS FILED HEREWITH.
X00709562-A8
09/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
09/09/2025
Special inspection requirement — Shutoff dampers
09/09/2025
Special inspection requirement — Air barrier - visual inspection
09/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/09/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
09/09/2025
Special inspection requirement — Mechanical Systems
JAMES WILSON
09/09/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
09/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/09/2025
Special inspection requirement — Insulation placement and R values
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
09/09/2025
Special inspection requirement — Maintenance information
JAMES WILSON
09/09/2025
Special inspection requirement — Fenestration areas
09/09/2025
Special inspection requirement — Fenestration air leakage
08/15/2025
Permit issued — Solar
X01223706-I1-SL
08/14/2025
Permit issued — Plumbing
X00709562-S4-PL
08/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/06/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/06/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
08/06/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/04/2025
Signed off — Alteration
X01005832-I1
07/31/2025
Permit issued — General Construction
X00709562-Z1-GC-CX
07/31/2025
Objection resolved — Addressed
07/30/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Lighting controls
JAMES WILSON
07/30/2025
Special inspection requirement — Vestibules
JAMES WILSON
07/30/2025
Special inspection requirement — Metering
JAMES WILSON
07/30/2025
Special inspection requirement — Fenestration air leakage
JAMES WILSON
07/30/2025
Special inspection requirement — Concrete - Precast
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Air barrier continuity plan testing
JAMES WILSON
07/30/2025
Special inspection requirement — Sprayed fire-resistant materials
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Interior lighting power
JAMES WILSON
07/30/2025
Special inspection requirement — Fenestration areas
JAMES WILSON
07/30/2025
Special inspection requirement — Exterior lighting power
JAMES WILSON
07/24/2025
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH LLW# 120622: CONSTRUCTION OF NEW BUILDING ADDITION TO EXISTING SCHOOL AS PER PLANS FILED HEREWITH.
X00709562-A7
07/21/2025
Permit issued — Construction Fence
X00862497-I1-FN
07/21/2025
Permit issued — General Construction
X00709562-I1-GC
07/17/2025
Objection resolved — Addressed
07/16/2025
Signed off — Alteration
105X- Proposed Support of Excavation for Utilities related to 4 Story NB and all related applications. All As per plans filed herewith
X00962331-I1
07/16/2025
Signed off — Alteration
105X- Proposed Support of Excavation related to 4 Story NB and all related applications. All As per plans filed herewith
X00879641-I1
07/11/2025
Filed — Alteration
INSTALLATION OF SPRINKLER AND STANDPIPE IN CONJUNCTION WITH NB#X00709562 AS PER THE PLANS FILED HEREWITH.
X00749580-P2
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/08/2025
Objection raised — Other
07/08/2025
Objection raised — Other
07/07/2025
Objection raised — Other
07/07/2025
Objection resolved — Addressed
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedI.M.P. Plumbing & Heating10/09/2026
DOB NOWStandpipePermit IssuedI.M.P. Plumbing & Heating10/09/2026
DOB NOWPlumbingPermit IssuedEagle 1 Mechanical08/11/2026
DOB NOWMechanical SystemsPermit IssuedNorth Shore Climate Contracting04/14/2026
DOB NOWPlumbingPermit IssuedEagle 1 Mechanical12/01/2025
DOB NOWSolarPermit IssuedMPCC08/15/2025
DOB NOWPlumbingPermit IssuedEagle 1 Mechanical08/14/2025
DOB NOWGeneral ConstructionPermit IssuedMPCC07/31/2025
DOB NOWConstruction FencePermit IssuedMPCC07/21/2025
DOB NOWGeneral ConstructionPermit IssuedMPCC07/21/2025
DOB NOWMechanical SystemsPermit IssuedNorth Shore Climate Contracting05/12/2025
DOB NOWMechanical SystemsPermit IssuedNorth Shore Climate Contracting05/12/2025
DOB NOWGeneral ConstructionPermit IssuedMPCC03/27/2025
DOB NOWConstruction FencePermit IssuedMPCC03/24/2025
DOB NOWStructuralSigned-offMPCC03/24/2025
DOB NOWSidewalk ShedSigned-offPJP Installers03/06/2025
DOB NOWPlumbingPermit IssuedEagle 1 Mechanical12/02/2024
DOB NOWPlumbingPermit IssuedEagle 1 Mechanical08/16/2024
DOB NOWStandpipePermit IssuedI.M.P. Plumbing & Heating08/15/2024
DOB NOWSprinklersPermit IssuedI.M.P. Plumbing & Heating08/15/2024
DOB NOWMechanical SystemsPermit IssuedMPCC07/26/2024
DOB NOWConstruction FencePermit IssuedMPCC07/23/2024
DOB NOWMechanical SystemsPermit IssuedNorth Shore Climate Contracting07/22/2024
DOB NOWBoiler EquipmentSigned-offEagle 1 Mechanical07/12/2024
DOB NOWGeneral ConstructionPermit IssuedNorth Shore Climate Contracting05/03/2024
DOB NOWConstruction FencePermit IssuedMPCC04/22/2024
DOB NOWGeneral ConstructionPermit IssuedMPCC03/19/2024
DOB NOWStructuralSigned-offMPCC03/18/2024
DOB NOWGeneral ConstructionPermit IssuedMPCC03/18/2024
DOB NOWSidewalk ShedSigned-offPJP Installers03/07/2024
DOB NOWSupport of ExcavationSigned-offMPCC02/05/2024
DOB NOWPlumbingPermit IssuedEagle 1 Mechanical12/29/2023
DOB NOWFoundationSigned-offMPCC08/18/2023
DOB NOWPlumbingPermit IssuedEagle 1 Mechanical08/18/2023
DOB NOWSupport of ExcavationSigned-offMPCC07/26/2023
DOB NOWConstruction FencePermit IssuedMPCC05/15/2023
1 project · most recent 09/12/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/12/2025Permit IssuedNorth Shore Climate ContractingAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Others
Cooling
Annexair ERP-E-12-EW07-H-C-SW-SS 14,000 CFM · Fan Coil Indoor ×6
AHU-E-12-H-C-SS 13,200 CFM · Fan Coil Indoor ×3
Heat / Cool
Lg LSN363HLV3 36,000 BTU · Heat Pump Outdoor ×9
LSU363HLV3 36,000 BTU · Heat Pump Outdoor ×9
LSN243HLV3 24,000 BTU · Vrf Indoor ×3
LSU243HLV3 24,000 BTU · Heat Pump Outdoor ×3
Heating
Airtherm RC-1200-08 31,000 BTU · Electric Heater ×45
not applicable 2,500 CFM ×1
Polaris A36-IG-92 1,577,405 BTU · Heat Exchanger ×3
Ventilation
Pennbarry DX10R 300 CFM ×12
DX11R 200 CFM · Exhaust Fan ×6
DX11B 710 CFM · Exhaust Fan ×3
DX11Q 500 CFM · Exhaust Fan ×3
DX12B 2,400 CFM ×3
DX13RGP 400 CFM ×3
DX16B 3,080 CFM ×3
FX24BHFT 2,800 CFM · Kitchen Exhaust ×3
SX085RC 300 CFM · Exhaust Fan ×3
Twin City Fan BCRFS-090 600 CFM · Exhaust Fan ×3
Other
Arctic Chill PACVMV0300D3-VS2 180 tons · Air Cooled Chiller ×3
New York Blower Compact Pressure Blower Model 140606 70 CFM · Exhaust Fan ×2
1 project · most recent 07/11/2025
FiledStatusContractorScope
07/11/2025Permit IssuedI.M.P. Plumbing & Heating1,022 heads, 2 outlets
2 projects · most recent 09/12/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/12/2025Permit IssuedEagle 1 MechanicalGas, Storm, Water/Sanitary
07/11/2025———
7 projects · most recent 10/16/2026
General Wiring
FiledStatusContractorScope
10/16/2026Permit IssuedMulti-Phase Electrical Services—
12/18/2025CompleteEastern Electrical Construction—
12/17/2025Permit IssuedMulti-Phase Electrical Services1 meters, 1 new_meters
09/17/2024Permit IssuedItz Electric—
02/29/2024CompleteRaiden Electric—
07/11/2023CompleteMulti-Phase Electrical ServicesGeneral Wiring
06/22/2023CompleteMulti-Phase Electrical Services1 meters, 1 new_meters
1 project · most recent 09/12/2025
Steel Concrete
FiledStatusContractorScope
09/12/2025Permit IssuedEagle 1 MechanicalSteel, Concrete
1 project · most recent 05/08/2025
FiledStatusContractorScope
05/08/2025——131 panels, 53.05 kw, 11,065.42 roof_area_sqft
1 project · most recent 12/15/2023
Fence
FiledStatusContractorScope
12/15/2023Permit IssuedMPCCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Pass-Final PL - UndergroundPassView ↗
08/06/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/06/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/06/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/25/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/25/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/17/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/09/2025Mechanical SystemsJAMES WILSONspecial
09/09/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/09/2025Air barrier - visual inspection—energy_progress
09/09/2025Post-installed AnchorsGEORGE GHEBRYALspecial
09/09/2025FinalGEORGE GHEBRYALprogress
09/09/2025Maintenance informationJAMES WILSONenergy_progress
09/09/2025Fenestration and door U-factor and product ratings—energy_progress
09/09/2025Fenestration areas—energy_progress
09/09/2025Fenestration air leakage—energy_progress
09/09/2025HVAC-R and service water heating system controls—energy_progress
09/09/2025HVAC-R and service water heating equipment—energy_progress
09/09/2025Insulation placement and R values—energy_progress
09/09/2025HVAC-R and service water piping design and insulation—energy_progress
09/09/2025Shutoff dampers—energy_progress
07/30/2025Fenestration areasJAMES WILSONenergy_progress
07/30/2025Exterior lighting powerJAMES WILSONenergy_progress
07/30/2025Fenestration and door U-factor and product ratingsJAMES WILSONenergy_progress
07/30/2025Insulation placement and R valuesJAMES WILSONenergy_progress
07/30/2025Maintenance informationJAMES WILSONenergy_progress
07/30/2025Air barrier - visual inspectionJAMES WILSONenergy_progress
07/30/2025Mastic and Intumescent Fire-resistant CoatingsGEORGE GHEBRYALspecial
07/30/2025Wall Panels, Curtain Walls, and VeneersGEORGE GHEBRYALspecial
07/30/2025MasonryGEORGE GHEBRYALspecial
07/30/2025Sprayed fire-resistant materialsGEORGE GHEBRYALspecial
07/30/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 105 Sen Abraham BernsteinEducationEntire building
Project X01223706 Alteration · Permit Entire · 06/30/2025
Project X01215533 Alteration · Filing Withdrawn · 05/08/2025
Project X01005832 Alteration · LOC Issued · 02/15/2024
Project X00962331 Alteration · LOC Issued · 11/21/2023
Project X00879641 Alteration · LOC Issued · 06/02/2023
Project X00862497 Alteration · Permit Entire · 04/24/2023
Project X00749580 Alteration · Permit Entire · 06/06/2022
Project X00709562 New Building · Permit Entire · 05/12/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 320 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch32
08/23/2026X00879641-I1Request digital key ↗
08/22/2026X00962331-I1Request digital key ↗
08/22/2026X00862497-P1Request digital key ↗
Showing 3 of 32 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/24/2026X00765437-P2Request digital key ↗
08/15/2026X00765437-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWDEP Stormwater Construction Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00709562-I1Open ↗
08/13/2026X00709562-A7Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00709562-P5Open ↗
08/13/2026X00709562-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications132
▸DOB NOWProgress Inspector Seal & Signature63
09/23/2026X00709562-S5Open ↗
09/23/2026X00709562-S5Open ↗
09/21/2026X00709562-Z1Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/23/2026X00709562-S5Open ↗
09/23/2026X00749580-P1Open ↗
09/21/2026X00709562-Z1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/24/2026X00765437-P2Open ↗
08/24/2026X00765437-I1Open ↗
08/23/2026X00879641-I1Open ↗
Showing 3 of 34 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026X00862497-I1Open ↗
08/13/2026X00862497-P1Open ↗
08/13/2026X00862497-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan3
08/13/2026X00709562-Z1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWStreet Tree Checklist3
08/13/2026X00709562-P5Open ↗
08/13/2026X00709562-A7Open ↗
08/13/2026X00709562-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026X00709562-P2Open ↗
08/13/2026X00709562-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00709562-S2Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026X00709562-S2Open ↗
▸Approvals, Objections & Sign-offs70
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter34
08/21/2026X01005832-I1Open ↗
Showing 1 of 34 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)31
08/13/2026X00709562-A2Open ↗
08/13/2026X00709562-P8Open ↗
08/13/2026X00709562-A6Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026X01005832-I1Open ↗
Showing 1 of 5 on file for this type
▸Other Documents56
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸DOB NOWSite Survey: Initial7
08/13/2026X00709562-Z1Open ↗
08/13/2026X00709562-I1Open ↗
08/13/2026X00709562-P8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProperty Ownership Certification3
08/19/2026X00709562-A7Open ↗
08/15/2026X00709562-I1Open ↗
08/15/2026X00709562-P5Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026X00962331-I1Open ↗
08/13/2026X00709562-Z1Open ↗
08/13/2026X00879641-I1Open ↗
▸DOB NOWNYCSCA Exhibit 23
08/13/2026X00879641-I1Open ↗
08/13/2026X01005832-I1Open ↗
08/13/2026X00962331-I1Open ↗