Belvedere Cii Condominium
211 JACKSON STREET · BIN 3428992
💬 Discuss this project
2021Year Built
4Stories
C1Building Class
—Zoning
7,030 sfGross Floor Area
7Units
0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 211 JACKSON LLC · 2,500 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 3 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Penthouse3p · 1 filing · 7 docs
Floor 43p · 2 filings · 20 docs
Floor 32p · 3 filings · 20 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 7 docs
Cellar4p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIDGE ZALE CONSTRUCTION CORP.3707/08/2026
211 JACKSON ST.203/22/2026
211 JACKSON1903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2019$1.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING2003/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRIDGE ZALE CONSTRUCT CORGeneral Contractor1407/08/2026
PHOENIX SUTTON STR INCGeneral Contractor507/08/2026
JOSEPH WEINSTEIN ELECTRIC 000796General Contractor303/22/2026
JOSEPH WEINSTEIN ELECTRICElectrical203/22/2026
PHOENIX PLMBG & MECH CORPFire Protection107/08/2026
GW MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADAL ENGINEERING PLLC4205605/06/2024
ENTHINK ENGINEERS LLC6247312/07/2022
STRUCT. ENGINEERING INTEG4174106/05/2020
Building Lifecycle
All (126)Filed (17)Permit Issued (15)Signed Off (10)Violation (16)Inspection (8)Objection (30)Special Inspection (30)
09/04/2024
Signed off — Alteration
B00342166-I1
07/10/2024
Signed off — Alteration
MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00408548-I1
05/13/2024
Objection raised — Admin
05/13/2024
Objection resolved — Addressed
05/06/2024
Filed — Alteration
MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00408548-P1
05/02/2024
Special inspection requirement — Final
Dariusz Makara
05/02/2024
Special inspection requirement — Mechanical Systems
Dariusz Makara
05/02/2024
Special inspection requirement — Electrical energy consumption
Dariusz Makara
05/02/2024
Special inspection requirement — HVAC and service water heating system controls
Dariusz Makara
05/02/2024
Special inspection requirement — Shutoff dampers
Dariusz Makara
05/02/2024
Special inspection requirement — Maintenance information
Dariusz Makara
05/02/2024
Special inspection requirement — HVAC insulation and sealing
Dariusz Makara
05/02/2024
Special inspection requirement — HVAC and service water heating equipment
Dariusz Makara
04/17/2024
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH . NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00341182-I1
03/20/2024
Permit issued — Mechanical Systems
B00408548-I1-MS
03/04/2024
Signed off — Alteration
SPRINKLER WORK AS PER PLANS FILED HEREWITH . NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00341173-I1
02/16/2024
Signed off — Alteration
B00341310-I1
02/08/2024
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00427780-I1
01/23/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/27/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00672171-I1
12/27/2023
Signed off — Alteration
INSTALLATION OF NEEDLE BEAM AT 2ND FLOOR AND 4TH FLOOR FOR NEW BUILDING CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
B00675214-I1
12/27/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
B00612647-I1
12/13/2023
Permit issued — Sprinklers
B00341173-I1-EW-SP
10/19/2023
Filed — Alteration
B00341310-I1
10/08/2023
Signed off — Alteration
B00234179-I1
10/06/2023
Special inspection requirement — Sprinkler Systems
Dariusz Makara
10/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
09/28/2023
Filed — Alteration
SPRINKLER WORK AS PER PLANS FILED HEREWITH . NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00341173-P1
09/21/2023
Special inspection requirement — Sprinkler Systems
Dariusz Makara
09/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
05/05/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/19/2023
Special inspection requirement — Maintenance information
Dariusz Makara
04/19/2023
Special inspection requirement — Electrical energy consumption
Dariusz Makara
04/19/2023
Special inspection requirement — HVAC insulation and sealing
Dariusz Makara
04/19/2023
Special inspection requirement — HVAC and service water heating equipment
Dariusz Makara
04/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Dariusz Makara
04/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
Dariusz Makara
04/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
04/19/2023
Special inspection requirement — HVAC and service water heating system controls
Dariusz Makara
04/17/2023
Objection resolved — Addressed
04/04/2023
Objection raised — Inspections
03/28/2023
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH . NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00341182-P1
03/28/2023
Special inspection requirement — HVAC and service water heating system controls
Dariusz Makara
03/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
03/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Dariusz Makara
03/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Dariusz Makara
03/28/2023
Special inspection requirement — HVAC and service water heating equipment
Dariusz Makara
03/28/2023
Special inspection requirement — Maintenance information
Dariusz Makara
03/28/2023
Special inspection requirement — HVAC insulation and sealing
Dariusz Makara
03/28/2023
Special inspection requirement — Electrical energy consumption
Dariusz Makara
02/06/2023
Permit issued — Protection and Mechanical Methods
B00675214-I1-PM
12/13/2022
Objection resolved — Addressed
12/12/2022
Objection raised — Other
12/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBRIDGE ZALE CONSTRUCT COR03/20/2024
DOB NOWSprinklersSigned-offGW MECHANICAL CORP12/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offPHOENIX SUTTON STR INC02/06/2023
DOB NOWPlumbingSigned-offGW MECHANICAL CORP11/15/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC10/26/2022
DOB NOWStructuralSigned-offBRIDGE ZALE CONSTRUCT COR09/28/2022
DOB NOWConstruction FenceSigned-offBRIDGE ZALE CONSTRUCT COR09/28/2022
DOB NOWSupported ScaffoldSigned-offBRIDGE ZALE CONSTRUCT COR09/28/2022
DOB NOWStructuralSigned-offBRIDGE ZALE CONSTRUCT COR08/23/2022
DOB NOWConstruction FenceSigned-offBRIDGE ZALE CONSTRUCT COR08/23/2022
DOB NOWProtection and Mechanical MethodsSigned-offPHOENIX SUTTON STR INC02/10/2022
DOB NOWSupported ScaffoldSigned-offBRIDGE ZALE CONSTRUCT COR02/02/2022
DOB NOWConstruction FenceSigned-offBRIDGE ZALE CONSTRUCT COR12/22/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/01/2021
DOB NOWStructuralSigned-offBRIDGE ZALE CONSTRUCT COR09/03/2021
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR11/03/2023
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR08/21/2023
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR11/02/2022
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR11/02/2022
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR08/22/2022
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR08/22/2022
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR01/04/2022
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR04/14/2021
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR04/14/2021
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR03/10/2021
BIS—ISSUEDBRIDGE ZALE CONSTRUCT COR03/10/2021
4 projects · most recent 02/16/2024
General Wiring
FiledStatusContractorScope
02/16/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/30/2023CompleteKENNETH FISK ELECTRIC CORGeneral Wiring
10/15/2021CompleteELPO ELECTRICAL CONTG INC—
09/20/2021CompleteJOSEPH WEINSTEIN ELECTRIC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/23/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/05/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/02/2024FinalDariusz Makaraprogress
05/02/2024Mechanical SystemsDariusz Makaraspecial
05/02/2024Electrical energy consumptionDariusz Makaraenergy_progress
05/02/2024HVAC and service water heating system controls Dariusz Makaraenergy_progress
05/02/2024Shutoff dampersDariusz Makaraenergy_progress
05/02/2024Maintenance informationDariusz Makaraenergy_progress
05/02/2024HVAC insulation and sealing Dariusz Makaraenergy_progress
05/02/2024HVAC and service water heating equipment Dariusz Makaraenergy_progress
10/06/2023Sprinkler SystemsDariusz Makaraspecial
10/06/2023Fire-Resistant Penetrations and JointsDariusz Makaraspecial
09/21/2023Sprinkler SystemsDariusz Makaraspecial
09/21/2023Fire-Resistant Penetrations and JointsDariusz Makaraspecial
04/19/2023Maintenance informationDariusz Makaraenergy_progress
04/19/2023Electrical energy consumptionDariusz Makaraenergy_progress
04/19/2023HVAC insulation and sealing Dariusz Makaraenergy_progress
04/19/2023HVAC and service water heating equipment Dariusz Makaraenergy_progress
04/19/2023Energy Code Compliance InspectionsDariusz Makaraprogress
04/19/2023Fire-Resistance Rated ConstructionDariusz Makaraprogress
04/19/2023Fire-Resistant Penetrations and JointsDariusz Makaraspecial
04/19/2023HVAC and service water heating system controls Dariusz Makaraenergy_progress
03/28/2023HVAC and service water heating system controls Dariusz Makaraenergy_progress
03/28/2023Fire-Resistant Penetrations and JointsDariusz Makaraspecial
03/28/2023Energy Code Compliance InspectionsDariusz Makaraprogress
03/28/2023Fire-Resistance Rated ConstructionDariusz Makaraprogress
03/28/2023HVAC and service water heating equipment Dariusz Makaraenergy_progress
Latest 25 of 34.
▾Documents — 125 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch6
08/31/2026B00672171-I1Request digital key ↗
08/31/2026B00675214-P1Request digital key ↗
08/31/2026B00675214-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00341192-I1Request digital key ↗
08/25/2026B00408548-I1Request digital key ↗
08/14/2026B00408548-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00341182-I1Request digital key ↗
08/14/2026B00341182-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00341173-I1Request digital key ↗
08/15/2026B00341173-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00234179-I1Request digital key ↗
09/02/2026B00427780-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/26/2026B00341310-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00342166-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
03/18/2025322118613Open ↗
06/27/2024322117151Open ↗
04/24/2024322117151Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
03/05/2024340909547Open ↗
09/01/2023340732096Open ↗
09/01/2023340732096Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/14/2025322118613Open ↗
06/28/2024322117151Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
03/14/2025322118613Open ↗
06/28/2024322117151Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
03/14/2025322118613Open ↗
06/28/2024322117151Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/14/2025322118613Open ↗
▸Seals & Professional Certifications61
▸DOB NOWProgress Inspector Seal & Signature28
08/26/2026B00408548-P1Open ↗
08/26/2026B00408548-P1Open ↗
08/26/2026B00408548-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/02/2026B00427780-I1Open ↗
09/01/2026B00612647-I1Open ↗
09/01/2026B00612647-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/29/2026B00341173-I1Open ↗
08/29/2026B00341173-I1Open ↗
08/26/2026B00675214-I1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/05/2024340909547Open ↗
06/10/2020340732096Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/05/2024340909547Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
03/05/2024340909547Open ↗
09/01/2023340732096Open ↗
09/01/2023340732096Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN2
03/05/2024340909547Open ↗
09/01/2023340732096Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00408548-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00408548-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/15/2024340909547Open ↗
06/10/2020340732096Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B00342166-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/14/2025322118613Open ↗
03/14/2025322118613Open ↗
06/28/2024322117151Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/05/2023340732096Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
03/05/2024340909547Open ↗
06/10/2020340732096Open ↗
▸BISEFILING COVER SHEET2
03/18/2025322118613Open ↗
04/24/2024322117151Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION3
09/05/2023340732096Open ↗
09/01/2023340732096Open ↗
09/01/2023340732096Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
03/14/2025322118613Open ↗
06/28/2024322117151Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/19/2024340909547Open ↗
▸BISPLOT DIAGRAM1
06/28/2024322117151Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
06/28/2024322117151Open ↗