LL97 Covered0 Active Violations
Office with commercial, 1-6 stories · Owner of record: BVK 215 West 125th Street · 29,975 sf lot · 5.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEmblemHealth, Frita Batidos +227p · 6 filings · 20 docs
BulkheadPlumbing work4p · 1 filing · 18 docs
Floor 6Temant CWS & R, Department of Labor54p · 4 filings · 20 docs
Floor 5Workers' Compensation Board18p · 3 filings · 20 docs
Floor 4
Floor 3CRG MANAGEMENT,LLC An Affiliate of Cogswell Realty Group. LLUnder Construction3p · 1 filing · 12 docs
Floor 2
Floor 1Frita Batidos, Bank of America +117p · 6 filings · 20 docs
CellarFrita Batidos5p · 3 filings · 11 docs
Site & exteriorBank of America3p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cogswell Realty Group6503/21/2026
215 Fee6403/21/2026
215 Jane St Invests3903/21/2026
BVK 215 West 125th Street1903/22/2026
BVK 215 W 125903/21/2026
Commonwealth Presidential Associates303/21/2026
Tri Borough203/21/2026
Utleys203/21/2026
A Partner of Commonwealth Associates203/21/2026
Cerina Construction103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bern CompaniesGeneral Contractor407/08/2026
Westerman Construction CoGeneral Contractor307/08/2026
Skyline Builders GroupGeneral Contractor303/21/2026
Maximum ElectricElectrical303/21/2026
Platinum General ServicesGeneral Contractor303/21/2026
Primiano Corp DbaElectrical203/21/2026
Excalibur GroupGeneral Contractor203/21/2026
Lane Refrigeration Cospecialty_contractor203/21/2026
Advanced PlumbingPlumbing207/08/2026
General PlumbingFire Protection207/08/2026
S & J IndustrialPlumbing207/08/2026
Five Borough NYCFire Protection107/08/2026
Centennial Elevator IndustriesElectrical103/21/2026
Belmont ElectricalElectrical103/21/2026
The Metro GroupGeneral Contractor107/23/2026
Tyler ConstructionGeneral Contractor107/08/2026
Electrical SolutionsElectrical103/21/2026
Going Sign & Servicing CoSign hanger107/08/2026
Absolute Special InsptnFire Protection107/08/2026
William C. Gerakaris P&HPlumbing107/08/2026
Deangelis Plumbing & HeatingPlumbing107/08/2026
V. Vass ElectricElectrical103/21/2026
Wilson DennisElectrical103/21/2026
Air Stream Air Conditioningspecialty_contractor107/08/2026
Jordan Daniels Electrical ConElectrical103/21/2026
DPH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New Age Engineering7746107/14/2026
A Tech Engineering NYC, P6738105/05/2026
Obaid Mian849104/15/2026
Jack Green Associates4221901/13/2025
Vincent J. Liotta P. E1974111/25/2024
Paradigm Architecture5931108/28/2024
Engineering Consulting SE2050105/09/2023
PL Engineering2594109/11/2020
Waypoint Consulting Group6175110/28/2019
Building Lifecycle
All (171)Filed (33)Permit Issued (25)Signed Off (10)Violation (60)Inspection (13)Special Inspection (30)
10/05/2026
Signed off — Alteration
REMOVE (2) ROOFTOP PACKAGE UNITS AS PER PLANS. FILED IN CONJUNCTION WITH LAA# M01003466. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01414472-I1
07/22/2026
Permit issued — Mechanical Systems
M01414472-I1-MS
07/14/2026
Filed — Alteration
REMOVE (2) ROOFTOP PACKAGE UNITS AS PER PLANS. FILED IN CONJUNCTION WITH LAA# M01003466. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01414472-I1
06/09/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
06/09/2026
Special inspection requirement — Final
Stephen Shishko
05/26/2026
Signed off — Alteration
M01378975-I1
05/20/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/07/2026
Permit issued — Sprinklers
M01366527-S1-EW-SP
05/05/2026
Filed — Alteration
INTERIOR DEMOLITION OF NON-LOADING PARTITIONS ON THE 3RD FLOOR OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366527-S1
04/27/2026
Special inspection requirement — Sprinkler Systems
anthony santoro
04/16/2026
Permit issued — Mechanical Systems
M01378975-I1-MS
04/15/2026
Filed — Alteration
M01378975-I1
04/06/2026
Special inspection requirement — Final
Anthony Nicholas
03/31/2026
Filed — Alteration
INTERIOR DEMOLITION OF NON-LOADING PARTITIONS ON THE 3RD FLOOR OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366527-P1
03/30/2026
Special inspection requirement — Final
Anthony Nicholas
03/19/2026
Permit issued — General Construction
M01366527-I1-GC
03/13/2026
Filed — Alteration
INTERIOR DEMOLITION OF NON-LOADING PARTITIONS ON THE 3RD FLOOR OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366527-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2025
Signed off — Alteration
M01090991-I1
05/23/2025
Signed off — Alteration
M01125899-I1
04/08/2025
Signed off — Alteration
REPLACEMENT OF CHILLERS AND BOILERS ALONG WITH ASSOCIATED DUCTS AND PIPIING ON THE 7TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00561289-I1
04/04/2025
Signed off — Alteration
REPLACEMENT OF BOILERS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00561367-I1
01/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/27/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/13/2025
Filed — Alteration
PLUMBING WORK FOR THE INSTALLATION OF GAS WATER HEATERS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00561341-P3
01/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
01/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
01/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
12/30/2024
Permit issued — Plumbing
M00561341-I1-PL
12/26/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/19/2024
Filed — Alteration
REPLACEMENT OF BOILERS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00561367-P8
12/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
12/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
12/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
12/19/2024
Special inspection requirement — Heating Systems
JACK GREEN
12/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
12/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
12/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
12/13/2024
Permit issued — Mechanical Systems
M01125899-I1-MS
12/12/2024
Signed off — Alteration
M00970932-I1
12/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
12/09/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
12/09/2024
Special inspection requirement — Ventilation and air distribution system
JACK GREEN
12/09/2024
Special inspection requirement — Final
JACK GREEN
12/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
12/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
12/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
12/09/2024
Special inspection requirement — Maintenance information
JACK GREEN
12/09/2024
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
12/09/2024
Special inspection requirement — Shutoff dampers
JACK GREEN
12/06/2024
Filed — Alteration
MECHANICAL SCOPE FILED FOR ASSOCIATED DUCTS AND PIPING FOR INTERIOR RENOVATIONS OF THE 5TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01029930-P1
12/06/2024
Filed — Alteration
REPLACEMENT OF BOILERS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00561367-P6
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
12/05/2024
Special inspection requirement — Heating Systems
JACK GREEN
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offThe Metro Group07/22/2026
DOB NOWSprinklersPermit IssuedFive Borough NYC05/07/2026
DOB NOWMechanical SystemsSigned-offAir Stream Air Conditioning04/16/2026
DOB NOWGeneral ConstructionPermit IssuedBern Companies03/19/2026
DOB NOWPlumbingSigned-offAdvanced Plumbing12/30/2024
DOB NOWMechanical SystemsSigned-offLane Refrigeration Co12/13/2024
DOB NOWBoiler EquipmentSigned-offS & J Industrial11/18/2024
DOB NOWMechanical SystemsPermit IssuedBern Companies10/16/2024
DOB NOWMechanical SystemsSigned-offWesterman Construction Co09/17/2024
DOB NOWStructuralSigned-offSkyline Builders Group09/13/2024
DOB NOWSprinklersSigned-offAbsolute Special Insptn05/09/2024
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H05/08/2024
DOB NOWGeneral ConstructionSigned-offBern Companies04/08/2024
DOB NOWBoiler EquipmentSigned-offS & J Industrial01/16/2024
DOB NOWPlumbingSigned-offAdvanced Plumbing12/21/2023
DOB NOWMechanical SystemsPermit IssuedBern Companies11/28/2023
DOB NOWMechanical SystemsSigned-offWesterman Construction Co11/16/2023
DOB NOWGeneral ConstructionSigned-offPlatinum General Services05/24/2023
DOB NOWGeneral ConstructionSigned-offTyler Construction05/11/2023
DOB NOWStandpipePermit IssuedGeneral Plumbing12/03/2020
DOB NOWSignSigned-offPolsinelli, Henry02/05/2020
DOB NOWPlumbingPermit IssuedDPH Plumbing & Heating11/07/2019
DOB NOWMechanical SystemsPermit IssuedExcalibur Group11/06/2019
DOB NOWSprinklersPermit IssuedGeneral Plumbing09/04/2019
DOB NOWPlumbingSigned-offDeangelis Plumbing & Heating08/19/2019
BISOTISSUEDExcalibur Group05/07/2020
BISOTISSUEDClearview Building Services10/09/2019
BISOTISSUEDElysium Construction06/28/2019
BISOTISSUEDCerina General Contracting06/28/2019
BISEQISSUEDCeprine Construction02/14/2019
BISEQISSUEDCerina General Contracting10/15/2018
BISOTISSUEDCerina General Contracting09/24/2018
BISEQISSUEDCeprine Construction03/12/2018
BISEQISSUEDCeprine Construction02/14/2018
BISOTISSUEDCerina General Contracting09/14/2017
BISOTISSUEDCerina General Contracting06/13/2017
BISEQISSUEDCeprine Construction06/01/2017
BISEQISSUEDCeprine Construction03/01/2017
BISEQISSUEDCeprine Construction02/24/2017
BIS—ISSUEDCad Signs NYC02/23/2017
+ 35 more permits on file
2 projects · most recent 12/06/2024
Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
12/06/2024Permit IssuedBern CompaniesAir Conditioning Systems
Cooling
Task TGC023-HE 25,300 BTU ×2
TGC043-HE 48,900 BTU · Condensing Unit ×2
11/06/2019Permit IssuedExcalibur GroupAir Conditioning Systems, Others
Cooling
Daikin REYQ240TATJU 20 tons · Vrf Outdoor ×2
Other
Kkt Chillers B0XX100 22 tons · Chiller ×1
3 projects · most recent 04/30/2024
FiledStatusContractorScope
04/30/2024Signed-offAbsolute Special Insptn411 heads
09/11/2020Permit IssuedGeneral Plumbing1 outlets
08/30/2019Permit IssuedGeneral Plumbing—
3 projects · most recent 01/13/2025
Water/Sanitary Gas
FiledStatusContractorScope
01/13/2025Signed-offAdvanced PlumbingGas
04/30/2024Signed-offWilliam C. Gerakaris P&HWater/Sanitary
11/06/2019Permit IssuedDPH Plumbing & HeatingWater/Sanitary
10 projects · most recent 01/06/2026
General Wiring
FiledStatusContractorScope
01/06/2026Permit IssuedCentennial Elevator IndustriesGeneral Wiring
05/29/2024CompleteHeso ElectricalGeneral Wiring
05/06/2024CompleteMatros Automated ElectricalGeneral Wiring
08/02/2023CompleteMatros Automated Electrical—
07/24/2023CompleteMatros Automated Electrical—
05/30/2023CompleteT. Dirusso Electrical ContGeneral Wiring
12/16/2022CompleteMatros Automated Electrical—
06/28/2021Permit IssuedHexagon Construction & Electrical GroupGeneral Wiring
02/11/2020CompleteRNW ElectricGeneral Wiring
02/04/2020Permit IssuedRainbow Electric Co—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/20/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
06/09/2026Mechanical SystemsStephen Shishkospecial
06/09/2026FinalStephen Shishkoprogress
04/27/2026Sprinkler Systemsanthony santorospecial
04/06/2026FinalAnthony Nicholasprogress
03/30/2026FinalAnthony Nicholasprogress
01/10/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
01/10/2025HVAC-R and service water heating system controlsJACK GREENenergy_progress
01/10/2025HVAC-R and service water piping design and insulationJACK GREENenergy_progress
01/10/2025HVAC-R and service water heating equipmentJACK GREENenergy_progress
01/10/2025Energy Code Compliance InspectionsJACK GREENprogress
12/19/2024Heating SystemsJACK GREENspecial
12/19/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
12/19/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
12/19/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
12/19/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
12/19/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
12/19/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
12/09/2024Energy Code Compliance InspectionsJACK GREENprogress
12/09/2024FinalJACK GREENprogress
12/09/2024Mechanical SystemsJACK GREENspecial
12/09/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
12/09/2024Ventilation and air distribution systemJACK GREENenergy_progress
12/09/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
12/09/2024Maintenance informationJACK GREENenergy_progress
12/09/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
Latest 25 of 102.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
EmblemHealthMedical / HealthcareRoof
Project M01378975 Alteration · LOC Issued · 04/15/2026
Frita BatidosRestaurant / Food ServiceRoof
Project M01125899 Alteration · LOC Issued · 11/25/2024
Workers' Compensation BoardGovernment / CivicFloor 5
Project M01029930 Alteration · Permit Entire · 09/27/2024
Project M01029951 Alteration · Permit Entire · 04/30/2024
Department of LaborGovernment / CivicFloor 6
Project M00965885 Alteration · Permit Entire · 11/28/2023
Project M00877094 Alteration · Filing Withdrawn
Temant CWS & ROfficeFloors 6, 7
Project M00561289 Alteration · LOC Issued · 10/23/2023
Project M00561367 Alteration · LOC Issued · 10/23/2023
Bank of AmericaBank / Financial branchFloor 1
Project M00874576 Alteration · LOC Issued · 05/23/2023
Harlem ImagingMedical / HealthcareFloor 1, Roof
Project M00234144 Alteration · Permit Entire · 10/28/2019
Project M00212454 Alteration · Permit Entire · 08/30/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 954 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch29
09/06/2026M00834121-I1Request digital key ↗
09/06/2026M00877094-I1Request digital key ↗
08/31/2026M00838278-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00202758-I1Request digital key ↗
09/05/2026M00234144-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00212454-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/04/2026M00371536-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00234144-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00290069-I1Request digital key ↗
▸Applications & Permits173
▸BISPLAN / WORK APPROVAL APPLICATION88
10/08/2019140872385Open ↗
09/17/2019123814694Open ↗
07/31/2019123710458Open ↗
Showing 3 of 88 on file for this type
▸BISWORK PERMIT APPLICATION84
10/08/2019140872385Open ↗
09/17/2019123814694Open ↗
08/14/2019123710458Open ↗
Showing 3 of 84 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications282
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION102
11/22/2019123808353Open ↗
11/22/2019123808353Open ↗
11/19/2019140872385Open ↗
Showing 3 of 102 on file for this type
▸DOB NOWProgress Inspector Seal & Signature54
09/23/2026M00561367-P4Open ↗
09/23/2026M00561367-I1Open ↗
09/23/2026M00561367-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/05/2026M00202758-I1Open ↗
09/05/2026M00234144-S1Open ↗
09/05/2026M00234144-I1Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT25
10/08/2019140872385Open ↗
09/17/2019123814694Open ↗
07/31/2019123710458Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
09/17/2019123814694Open ↗
07/31/2019123710458Open ↗
06/26/2019123808353Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026M00561367-I1Open ↗
09/23/2026M00561367-P4Open ↗
09/23/2026M00561289-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
10/08/2019140872385Open ↗
11/21/2018140819318Open ↗
10/09/2018140810344Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
10/08/2019140872385Open ↗
11/21/2018140819318Open ↗
10/09/2018140810344Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment81
▸BISSELF-CERT PLUMBING NOTICE28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISEQUIPMENT USE PERMITS8
05/01/2017122829500Open ↗
04/25/2017122968379Open ↗
02/22/2017122829500Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
04/25/2017122968379Open ↗
02/22/2017122829500Open ↗
Showing 2 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
07/27/2020123298984Open ↗
Showing 1 of 3 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISTENANT PROTECTION PLAN AND NOTES6
11/21/2018140819318Open ↗
10/09/2018140810344Open ↗
05/31/2017140650249Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos73
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
09/05/2026M00202758-I1Open ↗
09/05/2026M00234144-S1Open ↗
09/05/2026M00234144-I1Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
10/08/2019140872385Open ↗
09/17/2019123814694Open ↗
07/31/2019123710458Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
11/19/2019140872385Open ↗
09/17/2019123814694Open ↗
08/16/2019140819318Open ↗
Showing 3 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
11/22/2019123808353Open ↗
11/19/2019140872385Open ↗
08/16/2019140819318Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/08/2019140872385Open ↗
06/13/2019140819318Open ↗
11/21/2018140819318Open ↗
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026M00561289-I1Open ↗
08/13/2026M00561367-I1Open ↗
08/13/2026M00561367-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
02/23/2017140609802Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/08/2019140872385Open ↗
11/21/2018140819318Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/21/2020123814694Open ↗
▸BISNYCECC ANALYSIS1
10/08/2019140872385Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY12
08/21/2020123814694Open ↗
08/21/2020123814694Open ↗
08/21/2020123814694Open ↗
Showing 3 of 12 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs58
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
08/21/2020123814694Open ↗
11/22/2019123808353Open ↗
11/19/2019140872385Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/30/2019123033751Open ↗
Showing 1 of 3 on file for this type
▸BISSHED LETTER2
02/14/2019140609802Open ↗
Showing 1 of 2 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMaster Plumber Seal Temporary Approval Letter1
02/13/2017122968379Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
01/30/2019123033751Open ↗
▸Cost, Insurance & Ownership81
▸BISCOST AFFIDAVIT80
11/22/2019123808353Open ↗
11/19/2019140872385Open ↗
10/08/2019140872385Open ↗
Showing 3 of 80 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/21/2020123814694Open ↗
▸Filing & Intake Forms87
▸BISEFILING COVER SHEET50
09/17/2019123814694Open ↗
07/31/2019123710458Open ↗
06/26/2019123808353Open ↗
Showing 3 of 50 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
10/08/2019140872385Open ↗
11/21/2018140819318Open ↗
10/09/2018140810344Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION12
07/12/2019123808353Open ↗
06/29/2017140434260Open ↗
04/27/2017140609802Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM10
11/22/2019123808353Open ↗
11/19/2019140872385Open ↗
08/16/2019140819318Open ↗
Showing 3 of 10 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type