💬 Discuss this project
1922Year Built
15Stories
D4Building Class
C4-6AZoning
196,293 sfGross Floor Area
155Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only 4 likely answered 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 215 Equities · 17,624 sf lot · 11.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsBlue Woods Management Group1 filing
Floor 14Unit 15I2 filings
Floor 13
Floor 12
Floor 11Unit 11F, Unit 11AJ4 filings
Floor 10
Floor 9
Floor 8Unit 8E1p · 1 filing
Floor 7
Floor 6
Floor 5Unit 5F1 filing · 9 docs
Floor 4
Floor 3Unit 3A1 filing · 3 docs
Floor 2
Floor 1Interior store renovation with partition work1p · 1 filing
Site & exteriorBlue Woods Management Group2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
215 Equities4103/22/2026
RSP Companies503/22/2026
Fillup Coffee407/08/2026
The Expansion Group203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Neville Engineering Group102/10/2025
New York & Company610/18/2024
Jock Deboer, AIA208/14/2024
Arquitectura Varela110/24/2023
Lawrence V. McDonald, Jr. Architect310/20/2023
Marco Giardina Architecture501/05/2022
Anurag Upadhyay P.E211/08/2021
J.A.M. Associates302/22/2021
A2 Architect103/24/2020
RJD Engineering101/15/2020
Ashraf109/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company1203/21/2026
Metropolis Group1003/21/2026
A+ Expediting403/21/2026
Agouti Construction Consulting803/21/2026
WM Arch403/21/2026
Scarano Architect203/21/2026
Jenny Flores Expediting103/21/2026
HH Building Consulting & Architectu203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steel SystemsScaffold407/08/2026
K & B HVACspecialty_contractor303/21/2026
Shalbro Construction GroupScaffold303/21/2026
Willow Building ServicesGeneral Contractor303/21/2026
New York FloormanGeneral Contractor303/21/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
AbileneGeneral Contractor207/08/2026
Cam Energy Heating & MechanicalPlumbing207/08/2026
NY City PlumberPlumbing207/08/2026
Maximum ElectricElectrical103/21/2026
Tristar DevelopingGeneral Contractor107/08/2026
Dynamic Electric ServiceElectrical103/21/2026
Johnson WarrenElectrical103/21/2026
Vertex ElectricElectrical103/21/2026
Accurate MechanicalPlumbing107/08/2026
Star Electrical ContractorsElectrical103/21/2026
Carreras Home ImprovementPlumbing107/08/2026
HFM BuildersGeneral Contractor107/08/2026
V. Vass ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851610/18/2024
Jock Deboer, AIA - Sia7008107/17/2024
Lawrence V McDonald Architects6039310/20/2023
DY Special Inspection7210211/08/2021
Jack Green Associates422101/15/2020
Building Lifecycle
All (194)Filed (26)Permit Issued (20)Signed Off (15)Facade (FISP) (13)Violation (60)Inspection (19)Objection (11)Special Inspection (30)
04/10/2026
Signed off — Alteration
Proposed minor plumbing alteration to Apt. 3A, as per plans. No change to use, occupancy or egress under this application.
M01176343-I1
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Violation issued (FDNY_NOV, closed)
10/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S1
09/29/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S3
09/29/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S2
09/29/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S4
09/29/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-I1
09/03/2025
Permit issued — Plumbing
M01176343-I1-PL
08/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2025
Violation issued (FDNY_NOV, closed)
04/29/2025
Signed off — Alteration
Application filed to renovate apt 5F to include modification to non bearing partitions with new finishes as per the plans filed herewith no change to use, egress or occupancy
M01072681-I1
04/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/16/2025
Permit issued — General Construction
M01072681-I1-GC
03/20/2025
Permit issued — Plumbing
M00978073-S2-PL
02/10/2025
Filed — Alteration
Proposed minor plumbing alteration to Apt. 3A, as per plans. No change to use, occupancy or egress under this application.
M01176343-I1
10/22/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/21/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/18/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-P1
10/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/07/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00950799-I1
08/26/2024
Objection raised — Scope
08/14/2024
Filed — Alteration
Application filed to renovate apt 5F to include modification to non bearing partitions with new finishes as per the plans filed herewith no change to use, egress or occupancy
M01072681-S1
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/25/2024
Objection raised — Scope
07/25/2024
Objection raised — Scope
07/17/2024
Filed — Alteration
Application filed to renovate apt 5F to include modification to non bearing partitions with new finishes as per the plans filed herewith no change to use, egress or occupancy
M01072681-I1
07/15/2024
Special inspection requirement — Insulation placement and R values
Jock deBoer
07/15/2024
Special inspection requirement — Lighting controls
Jock deBoer
07/15/2024
Special inspection requirement — Lighting in dwelling units
Jock deBoer
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jock deBoer
06/26/2024
Special inspection requirement — Final
Jock deBoer
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Jock deBoer
06/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jock deBoer
01/19/2024
Permit issued — Boiler Equipment
M00978073-S1-BE
01/19/2024
Permit issued — Plumbing
M00978073-S2-PL
01/19/2024
Permit issued — General Construction
M00978073-S4-GC
01/19/2024
Permit issued — General Construction
M00978073-S3-GC
01/19/2024
Permit issued — Boiler Equipment
M00978073-I1-BE
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S1
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S3
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S2
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S4
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-I1
12/15/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
12/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/15/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
12/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/15/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
12/15/2023
Special inspection requirement — Final
LOUIS ARENA
12/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating09/03/2025
DOB NOWGeneral ConstructionSigned-offNew York Floorman04/16/2025
DOB NOWPlumbingSigned-offNY City Plumber03/20/2025
DOB NOWBoiler EquipmentSigned-offAbilene01/19/2024
DOB NOWPlumbingSigned-offNY City Plumber01/19/2024
DOB NOWGeneral ConstructionSigned-offAbilene01/19/2024
DOB NOWGeneral ConstructionSigned-offAbilene01/19/2024
DOB NOWBoiler EquipmentSigned-offAbilene01/19/2024
DOB NOWSidewalk ShedSigned-offShalbro Construction Group10/25/2023
DOB NOWGeneral ConstructionSigned-offWillow Building Services04/24/2023
DOB NOWPlumbingSigned-offAnthony Disabato04/18/2023
DOB NOWMechanical SystemsPermit IssuedK & B HVAC02/21/2022
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical01/24/2022
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical01/11/2022
DOB NOWGeneral ConstructionSigned-offHFM Builders01/05/2022
DOB NOWGeneral ConstructionSigned-offTristar Developing07/07/2021
DOB NOWPlumbingSigned-offCarreras Home Improvements06/03/2020
DOB NOWSidewalk ShedSigned-offSteel Systems04/02/2020
DOB NOWPlumbingPermit IssuedOrbit Plumbing & Heating02/05/2020
DOB NOWSidewalk ShedSigned-offSteel Systems09/26/2019
BISOTISSUEDRCD Restorations03/10/2022
BISOTISSUEDRCD Restorations10/25/2021
BISOTISSUEDReal Deal Decoration09/24/2020
BISOTISSUEDRCD Restorations04/14/2020
BISOTISSUEDReal Deal Decoration03/24/2020
BISOTISSUEDAdvanced Remodeling Solu02/04/2020
BISOTISSUEDRCD Restorations10/09/2019
BISPLISSUEDMacreddin Plumbing & Heating10/10/2017
BISOTISSUEDComplete Renovation & Con10/02/2017
BISOTISSUEDL & Z Restoration09/11/2013
BISEQISSUEDL & Z Restoration08/27/2013
BISPLISSUEDAriana Contracting07/19/2013
BISOTISSUEDNeza Team06/18/2013
BISEQISSUEDL & Z Restoration04/24/2013
BISPLISSUEDAttack Plumbing04/06/2012
BISOTISSUEDDavid Evan03/23/2012
BISPLISSUEDFive Star P and H Co12/19/2011
BISOTISSUEDSJB Interiors12/12/2011
BISOTISSUEDSJB Interiors11/30/2011
BISEQISSUEDCeprine Construction09/27/2011
+ 30 more permits on file
1 project · most recent 01/15/2020
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/15/2020Permit IssuedK & B HVACVentilation Systems
Ventilation
Above Air VCU-C-030-1-X 28,200 BTU · Condensing Unit ×2
2 projects · most recent 08/14/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/14/2024——Gas, Water/Sanitary
02/22/2021Permit IssuedOrbit Plumbing & HeatingGas, Water/Sanitary
9 projects · most recent 03/26/2026
General Wiring Boiler Controls
FiledStatusContractorScope
03/26/2026Permit IssuedV. Vass ElectricGeneral Wiring
05/07/2025CompleteAbilene ElectricBoiler Controls
08/23/2024CompleteVertex ElectricGeneral Wiring
04/23/2024CompleteAbilene Electric—
04/30/2023CompleteV. Vass ElectricGeneral Wiring
02/18/2022CompleteKJK ElectricGeneral Wiring
01/15/2021CompletePrestige Electrical ContgGeneral Wiring
06/04/2020Permit IssuedTop Tier ElectricGeneral Wiring
08/22/2019CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/22/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/21/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2021Pass-Final General Construction Non-Directive 14PassView ↗
11/05/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
10/18/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/18/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
10/14/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
10/14/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/07/2024Fire-Resistant Penetrations and Joints—special
07/15/2024Insulation placement and R valuesJock deBoerenergy_progress
07/15/2024Lighting controlsJock deBoerenergy_progress
07/15/2024Lighting in dwelling unitsJock deBoerenergy_progress
06/26/2024Fire-Resistant Penetrations and JointsJock deBoerspecial
06/26/2024FinalJock deBoerprogress
06/26/2024Energy Code Compliance InspectionsJock deBoerprogress
06/26/2024Fire-Resistance Rated ConstructionJock deBoerprogress
12/15/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
12/15/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/15/2023Maintenance informationLOUIS ARENAenergy_progress
12/15/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/15/2023Heating SystemsLOUIS ARENAspecial
12/15/2023FinalLOUIS ARENAprogress
12/15/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/15/2023Chimneys and ventsLOUIS ARENAspecial
12/15/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/15/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/23/2023Fire-Resistant Penetrations and JointsLawrence McDonaldspecial
10/23/2023Energy Code Compliance InspectionsLawrence McDonaldprogress
10/19/2023Energy Code Compliance InspectionsLawrence McDonaldprogress
Latest 25 of 53.
▾Documents — 411 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch20
09/03/2026M00544792-P1Request digital key ↗
09/03/2026M00544792-I1Request digital key ↗
09/03/2026M00627047-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00311436-I1Request digital key ↗
09/04/2026M00270663-I1Request digital key ↗
08/15/2026M00270663-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00231479-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00270569-I1Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION35
11/24/2021123710779Open ↗
11/01/2021123710779Open ↗
10/22/2021123710779Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION30
10/25/2021123710779Open ↗
10/22/2021123710779Open ↗
08/23/2021123710779Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications129
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
03/26/2020123875208Open ↗
03/23/2020123875208Open ↗
01/21/2020123710779Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/05/2026M00270569-I1Open ↗
09/05/2026M00311436-I1Open ↗
09/03/2026M00627047-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/28/2026M00978073-S3Open ↗
09/15/2026M00978073-I1Open ↗
09/15/2026M00978073-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/28/2026M00978073-S3Open ↗
09/28/2026M00978073-S3Open ↗
09/15/2026M00978073-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
03/23/2020123875208Open ↗
08/08/2019123710779Open ↗
06/04/2013121637737Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
06/04/2013121637737Open ↗
04/29/2013121598075Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/23/2020123875208Open ↗
08/08/2019123710779Open ↗
08/19/2013140107024Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/19/2013140107024Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2013140107024Open ↗
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING13
08/13/2013121637737Open ↗
08/13/2013121637737Open ↗
06/04/2013121637737Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
10/25/2013121637737Open ↗
10/25/2013121637737Open ↗
04/23/2013121006589Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/24/2018123104773Open ↗
02/15/2018123104773Open ↗
08/15/2017123104773Open ↗
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan6
09/05/2026M00311436-I1Open ↗
08/13/2026M00270663-I1Open ↗
08/13/2026M00270663-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes4
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
08/08/2019123710779Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
06/04/2013121637737Open ↗
▸Environmental & Asbestos42
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/05/2026M00311436-I1Open ↗
09/03/2026M00627047-I1Open ↗
09/03/2026M00627031-I1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
06/04/2013121637737Open ↗
Showing 1 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
08/08/2019123710779Open ↗
Showing 3 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
03/28/2013121575651Open ↗
03/28/2013121575651Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
12/07/2011120867366Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
08/08/2019123710779Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/02/2021123792011Open ↗
12/01/2020123875208Open ↗
12/01/2020123875208Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
12/01/2020123875208Open ↗
07/17/2018123104773Open ↗
06/19/2014121575651Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/16/2022123710779Open ↗
04/02/2021123792011Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/02/2021123792011Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/16/2022123710779Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/25/2011120867366Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00978073-S1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00544792-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/02/2021123792011Open ↗
04/02/2021123792011Open ↗
04/02/2021123792011Open ↗
Showing 3 of 6 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/16/2022123710779Open ↗
▸BISMASONRY1
11/16/2022123710779Open ↗
▸BISPOST-INSTALLED ANCHORS1
11/16/2022123710779Open ↗
▸Approvals, Objections & Sign-offs24
▸BISADMINISTRATIVE OBJECTIONS11
06/04/2013121637737Open ↗
04/29/2013121598075Open ↗
03/28/2013121575651Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/17/2022123710779Open ↗
04/02/2021123792011Open ↗
12/01/2020123875208Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/23/2021123710779Open ↗
08/23/2021123710779Open ↗
08/27/2013140107024Open ↗
▸BISFINAL1
11/16/2022123710779Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT19
12/01/2020123875208Open ↗
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/16/2022123710779Open ↗
03/31/2021123792011Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET16
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
08/08/2019123710779Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION10
11/24/2021123710779Open ↗
08/13/2020123792011Open ↗
05/02/2018123104773Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
10/25/2021123710779Open ↗
10/25/2021123710779Open ↗
08/23/2021123710779Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/19/2013140107024Open ↗
▸Other Documents5
▸DOB NOWDHCR Document5
09/03/2026M00644283-I1Open ↗
08/15/2026M00644321-I1Open ↗
08/13/2026M00627047-I1Open ↗
Showing 3 of 5 on file for this type