← Back
Elevator apt, semi-fireproof with stores
Myrtle Avenue Dialysis Center
218 MYRTLE AVENUE · BIN 3398440
💬 Discuss this project
2008Year Built
9Stories
D7Building Class
R7-1Zoning
110,912 sfGross Floor Area
97Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: RED APPLE MYRTLE AVENUE DEVELOPMENT II, LLC · 16,772 sf lot · 6.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction23p · 3 filings · 15 docs
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARPOL CONST CORP209/15/2026
RED APPLE GROUP1007/08/2026
THE BROOKLYN HOSPITAL CENTER1307/08/2026
DISH WIRELESS307/08/2026
RED APPLE REAL ESTATE503/22/2026
RED APPLE MYRTLE AVE DEV, LLC3103/22/2026
R A REAL ESTATE203/22/2026
N.Y HOIST LLC103/22/2026
RINALDI GROUP203/22/2026
RED APPLE MYRTLE DEVELOPMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSMR DESIGNS203/21/2026
METROPOLIS GROUP INC203/21/2026
DOMINION EXPEDITING203/21/2026
MUNICIPAL EXPEDITING203/21/2026
CONSTRUCTION PERMIT SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DATTNER ARCHITECTSGeneral Contractor503/22/2026
A M A HOLDINGSScaffold307/08/2026
ALJER PLBG & HTG. CORPFire Protection207/08/2026
SQUAN CONSTRUCTION SERVICGeneral Contractor204/09/2026
MACK SIGNS AWNINGSScaffold207/08/2026
MARPOL CONST CORPGeneral Contractor109/16/2026
A. FONTANA & SONS LLCGeneral Contractor107/08/2026
ATLANTIC EAST COMM CORPGeneral Contractor107/08/2026
ANTHONY CIPRIANOElectrical103/21/2026
PHOENIX SUTTON STR INCGeneral Contractor108/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SAG ENGINEERING & CONSULT608108/06/2026
STRUCTURAL CONSULTING SER1919207/21/2025
OUTSOURCE SPECIAL INSPECT2827309/19/2023
KMB DESIGN GROUP, LLC513103/21/2023
Building Lifecycle
All (95)Filed (13)Permit Issued (14)Signed Off (5)Facade (FISP) (6)Violation (41)Objection (2)Special Inspection (14)
09/15/2026
Permit issued — General Construction
B01435719-I1-GC
08/31/2026
Filed — Alteration
Main Roof & Bulkhead roofs replacement. No change in occupancy, use or egress.
B01435719-S1
08/31/2026
Permit issued — Suspended Scaffold
B01435719-S1-SC
08/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01441969-I1
08/07/2026
Permit issued — Sidewalk Shed
B01441969-I1-SH
08/06/2026
Filed — Alteration
Main Roof & Bulkhead roofs replacement. No change in occupancy, use or egress.
B01435719-I1
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
07/23/2026
Special inspection requirement — Insulation placement and R values
07/23/2026
Special inspection requirement — Final
Domingo Diaz
07/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/06/2026
Violation issued (ECB, closed)
Elevators
04/17/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
B
02/04/2026
Permit issued — Antenna
B01174610-I1-AN
02/04/2026
Permit issued — General Construction
B01174610-S1-GC
12/08/2025
Objection resolved — Addressed
11/18/2025
Violation issued (HPD, closed)
I
07/25/2025
Objection raised — Fire_Protection
07/21/2025
Filed — Alteration
Modification to existing VERIZON site on the roof. Installation of (4) antennas, (4) RRH units and (3) cabinets. Replacement of (6) antennas and (6) RRH units. Removal of (4) antennas, (4) RRH units and (2) cabinets. Relocation of (3) GPS antennas.
B01174610-S1
07/21/2025
Filed — Alteration
Modification to existing VERIZON site on the roof. Installation of (4) antennas, (4) RRH units and (3) cabinets. Replacement of (6) antennas and (6) RRH units. Removal of (4) antennas, (4) RRH units and (2) cabinets. Relocation of (3) GPS antennas.
B01174610-I1
07/21/2025
Special inspection requirement — Post-installed Anchors
James Fahey
01/31/2025
Special inspection requirement — Final
James Fahey
01/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Fahey
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade report signed — SAFE
02/07/2024
Cycle 9 facade inspection completed
01/03/2024
Signed off — Alteration
Convert 1st floor office into storage and lobby. Refer to 321197183 for change of use.
B00920442-I1
11/13/2023
Permit issued — General Construction
B00920442-I1-GC
09/19/2023
Filed — Alteration
Convert 1st floor office into storage and lobby. Refer to 321197183 for change of use.
B00920442-I1
08/10/2023
Signed off — Alteration
DISH Wireless- Installation of 3 new antenna sectors with 6 RRH units and 1 GPS unit on roof. Install 1 new equipment cabinet on new steel platform on roof. Related service connection in cellar, 1st - 9th floors to roof. All in conformance with TPPN 5/98.
B00800757-I1
07/03/2023
Violation issued (HPD, closed)
A
05/01/2023
Filed — Alteration
Minor plumbing work related to General Renovation of existing retail CVS space. No change to use, egress or occupancy.
B00855008-S1
04/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
04/26/2023
Filed — Alteration
Minor plumbing work related to General Renovation of existing retail CVS space. No change to use, egress or occupancy.
B00855008-I1
04/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
04/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/05/2023
Special inspection requirement — Final
04/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
03/23/2023
Permit issued — Antenna
B00800757-I1-AN
03/21/2023
Filed — Alteration
DISH Wireless- Installation of 3 new antenna sectors with 6 RRH units and 1 GPS unit on roof. Install 1 new equipment cabinet on new steel platform on roof. Related service connection in cellar, 1st - 9th floors to roof. All in conformance with TPPN 5/98.
B00800757-I1
03/09/2022
Violation issued (HPD, closed)
A
10/15/2021
Signed off — Alteration
B00368182-I1
10/05/2021
Signed off — Alteration
B00376421-I1
09/30/2021
Permit issued — Sign
B00368182-I1-SG
09/28/2021
Signed off — Alteration
Filed herewith removal of existing and installation of new sprinkler heads. No change in use, egress, or occupancy.
B00210747-I1
09/23/2021
Permit issued — Sign
B00376421-I1-SG
07/26/2021
Permit issued — Sign
B00376421-I1-SG
04/19/2021
Violation issued (HPD, closed)
A
12/18/2020
Filed — Alteration
Filed herewith removal of existing and installation of new sprinkler heads. No change in use, egress, or occupancy.
B00210747-P1
12/18/2020
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
12/14/2020
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
10/29/2020
Permit issued — Sprinklers
B00210747-I1-EW-SP
08/17/2020
Permit issued — Sign
B00376421-I1-SG
08/17/2020
Permit issued — Sign
B00368182-I1-SG
08/15/2020
Violation issued (FDNY_NOV, closed)
08/12/2020
Filed — Alteration
B00368182-I1
08/12/2020
Filed — Alteration
B00376421-I1
07/27/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/27/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/27/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMARPOL CONST CORP09/15/2026
DOB NOWSuspended ScaffoldPermit IssuedCONSTRUCTED CORP08/31/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC08/07/2026
DOB NOWAntennaPermit IssuedSQUAN CONSTRUCTION SERVIC02/04/2026
DOB NOWGeneral ConstructionPermit IssuedSQUAN CONSTRUCTION SERVIC02/04/2026
DOB NOWGeneral ConstructionSigned-offA. FONTANA & SONS LLC11/13/2023
DOB NOWAntennaSigned-offATLANTIC EAST COMM CORP03/23/2023
DOB NOWSignSigned-offA.M.A HOLDINGS INC09/30/2021
DOB NOWSignSigned-offA.M.A HOLDINGS INC09/23/2021
DOB NOWSignSigned-offA.M.A HOLDINGS INC07/26/2021
DOB NOWSprinklersSigned-offALJER PLBG & HTG. CORP10/29/2020
DOB NOWSignSigned-offMACK SIGNS & AWNINGS INC08/17/2020
DOB NOWSignSigned-offMACK SIGNS & AWNINGS INC08/17/2020
DOB NOWSprinklersSigned-offALJER PLBG & HTG. CORP01/10/2020
BISMHISSUEDCENTRAL CONSULTING & CONT06/28/2021
BISOTISSUEDCENTRAL CONSULTING & CONT06/28/2021
BISOTISSUEDCENTRAL CONSULTING & CONT06/28/2021
BISOTISSUEDCENTRAL CONSULTING & CONT06/24/2020
BISOTISSUEDCENTRAL CONSULTING & CONT06/24/2020
BISMHISSUEDCENTRAL CONSULTING & CONT06/24/2020
BISMHISSUEDPRODUCTION CONTRACT. LLC04/27/2020
BISOTISSUEDPRODUCTION CONTRACT. LLC04/27/2020
BISSPISSUEDPLUMBING NYC, INC02/13/2020
BISOTISSUEDCENTRAL CONSULTING & CONT08/02/2019
BISMHISSUEDCENTRAL CONSULTING & CONT08/02/2019
BISOTISSUEDPRODUCTION CONTRACT. LLC05/16/2019
BISMHISSUEDPRODUCTION CONTRACT. LLC05/16/2019
BISOTISSUEDDEMARI SERVICES INC02/09/2018
BISOTISSUEDDEMARI SERVICES INC02/09/2018
BIS—ISSUEDDATTNER ARCHITECTS09/06/2017
BISOTISSUEDDEMARI SERVICES INC08/25/2017
BISOTISSUEDDEMARI SERVICES INC07/25/2017
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM07/17/2017
BISOTISSUEDTELCOM ENGINEERING GP INC09/21/2015
BISOTISSUEDMC GOWAN BUILDERS INC08/04/2015
BISEQISSUEDMC GOWAN BUILDERS INC05/28/2015
BISOTISSUEDMC GOWAN BUILDERS INC08/12/2014
BISEQISSUEDMC GOWAN BUILDERS INC06/05/2014
BISOTISSUEDMC GOWAN BUILDERS INC06/05/2014
BISPLISSUEDAURA PLUMBING INC09/19/2013
+ 14 more permits on file
1 project · most recent 05/01/2023
Water/Sanitary
FiledStatusContractorScope
05/01/2023——Water/Sanitary
4 projects · most recent 08/07/2026
General Wiring
FiledStatusContractorScope
08/07/2026Permit IssuedRICHARD NEU—
02/09/2023CompleteJ.A. LEE ELEC SVCS LLC96 meters, 1 new_meters
01/24/2023CompleteTOP NOTCH ELECTRIC INCGeneral Wiring
08/08/2019CompleteINTERPHASE ELECTRIC CORP.General Wiring
1 project · most recent 08/07/2026
Sidewalk Shed
FiledStatusContractorScope
08/07/2026Permit IssuedPHOENIX SUTTON STR INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/23/2026Energy Code Compliance Inspections—progress
07/23/2026Insulation placement and R values—energy_progress
07/23/2026FinalDomingo Diazprogress
07/23/2026Tenant Protection Plan Compliance—special
07/21/2025Post-installed AnchorsJames Faheyspecial
01/31/2025FinalJames Faheyprogress
01/31/2025Tenant Protection Plan ComplianceJames Faheyspecial
04/28/2023Tenant Protection Plan Compliance—special
04/05/2023Fire-Resistance Rated Construction—progress
04/05/2023Fire-Resistant Penetrations and Joints—special
04/05/2023Final—progress
04/05/2023Tenant Protection Plan Compliance—special
12/18/2020Sprinkler SystemsJONAR MADRIAGAspecial
12/14/2020Sprinkler SystemsJONAR MADRIAGAspecial
▾Documents — 559 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch7
08/27/2026B00800757-I1Request digital key ↗
08/27/2026B00855008-I1Request digital key ↗
08/27/2026B00855008-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/02/2026B00368182-I1Request digital key ↗
09/02/2026B00376421-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00210747-I1Request digital key ↗
08/15/2026B00210747-P1Request digital key ↗
▸Applications & Permits121
▸BISPLAN / WORK APPROVAL APPLICATION81
05/14/2025321197183Open ↗
05/08/2025321197183Open ↗
03/11/2025321197183Open ↗
Showing 3 of 81 on file for this type
▸BISWORK PERMIT APPLICATION35
02/20/2020321074350Open ↗
08/13/2019321960847Open ↗
08/05/2019321960847Open ↗
Showing 3 of 35 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
05/28/2020321074350Open ↗
05/18/2020321074350Open ↗
05/12/2020321074350Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/20/2017321197183Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records10
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION3
06/05/2025321197183Open ↗
Showing 1 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
06/05/2025321197183Open ↗
12/02/2022321197183Open ↗
▸BISRESTRICTION: EASEMENT AGREEMENT2
06/05/2025321197183Open ↗
06/05/2025321197183Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED OFF SITE PARKING RESTRICTIVE DECLARATION TO BE INCLUDED TO GIVEN SITE81 FLEET PLACE NB 3203751161
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications85
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
06/24/2021321960847Open ↗
03/27/2020321074350Open ↗
10/23/2019321572678Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B00800757-I1Open ↗
08/27/2026B00855008-I1Open ↗
08/27/2026B00855008-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/07/2019321960847Open ↗
06/07/2019321960847Open ↗
06/07/2019321960847Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/07/2019321960847Open ↗
11/19/2018321074350Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B00210747-I1Open ↗
08/29/2026B00210747-P1Open ↗
08/27/2026B01174610-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/14/2017340523981Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01174610-S1Open ↗
▸Trade Schedules & Equipment45
▸BISSCHEDULE B - PLUMBING15
06/03/2021321960847Open ↗
04/08/2021321960847Open ↗
01/20/2021321960847Open ↗
Showing 3 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
01/21/2022321960847Open ↗
11/18/2021321960847Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS5
01/21/2022321960847Open ↗
01/21/2022321960847Open ↗
11/18/2021321960847Open ↗
Showing 3 of 5 on file for this type
▸BISWATER METER PERMIT : DEP-METER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/07/2019321960847Open ↗
11/19/2018321074350Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
07/15/2021321951900Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes5
06/07/2019321960847Open ↗
11/19/2018321074350Open ↗
07/14/2017340523981Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026B00368182-I1Open ↗
08/13/2026B00376421-I1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos26
▸DOB NOWOER: Notice to Proceed9
08/13/2026B00920442-I1Open ↗
08/13/2026B00210747-P1Open ↗
08/13/2026B00210747-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
02/11/2023340523981Open ↗
04/08/2021321960847Open ↗
10/23/2019321572678Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
08/02/2019321960847Open ↗
01/25/2019321074350Open ↗
07/14/2017340523981Open ↗
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026B00920442-I1Open ↗
08/13/2026B01174610-S1Open ↗
08/13/2026B00800757-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026B00800757-I1Open ↗
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
06/24/2021321960847Open ↗
06/24/2021321960847Open ↗
10/23/2019321498152Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
05/18/2020321074350Open ↗
05/12/2020321074350Open ↗
10/23/2019321498152Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/13/2021321197183Open ↗
07/13/2021321197183Open ↗
05/18/2020321074350Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/08/2021321960847Open ↗
▸Inspections & Test Reports18
▸BISCONCRETE TEST CYLINDERS(TR-2) 7-607A(1)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/19/2021321197183Open ↗
04/08/2021321960847Open ↗
05/28/2020321074350Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs86
▸BISSCHEDULE A - OCCUPANCY / USE36
05/14/2025321197183Open ↗
05/08/2025321197183Open ↗
02/03/2025321197183Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
02/16/2023340523981Open ↗
01/11/2022321960847Open ↗
07/15/2021321951900Open ↗
Showing 3 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
05/30/2019321951900Open ↗
01/30/2019321074350Open ↗
Showing 2 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
11/18/2021321960847Open ↗
07/15/2021321951900Open ↗
05/18/2020321074350Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms41
▸BISADDITIONAL INFORMATION20
09/17/2021321960847Open ↗
07/13/2021321197183Open ↗
07/13/2021321197183Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET14
06/07/2019321960847Open ↗
06/07/2019321960847Open ↗
06/07/2019321960847Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM5
07/15/2021321951900Open ↗
05/01/2020321074350Open ↗
10/23/2019321498152Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
07/13/2021321197183Open ↗
07/13/2021321197183Open ↗
06/03/2021321960847Open ↗
Showing 3 of 11 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type