← Back
Over six families without stores
Park Rock Rehab
218 ROCHESTER AVENUE · Crown Heights (North) · BIN 3036567
💬 Discuss this project
1917Year Built
4Stories
C1Building Class
R6Zoning
10,676 sfGross Floor Area
12Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 7,011 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Roof1p · 1 filing · 9 docs
Floor 445p · 3 filings · 20 docs
Floor 345p · 3 filings · 20 docs
Floor 245p · 3 filings · 20 docs
Floor 154p · 3 filings · 20 docs
Cellar47p · 2 filings · 15 docs
Site & exterior25p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY404/08/2026
NYCHA307/08/2026
NEW YORK CITY HOUSING AUTHORITY307/08/2026
NYC PACT PRESERVATION PARTNERS303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VOLUME SPACE CONSULTING INC.101/15/2025
DAGHER ENGINEERING PLLC208/01/2024
SLM ARCHITECTURE, P.C.107/16/2024
SOCOTEC, INC.204/25/2024
ASHRAF CORP203/05/2024
BITOPI CONSULTANTS LLC103/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC603/21/2026
KD DESIGNS203/21/2026
RYBAK DEVELOPMENT203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
AK CONSULTING SERVICES203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor507/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor303/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
LIBERTY NY RESTORATION INGeneral Contractor207/08/2026
ACE GROUP NY CORPGeneral Contractor104/08/2026
ROMA SCAFFOLDING INCGeneral Contractor107/08/2026
A & E PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803608/01/2024
Building Lifecycle
All (90)Filed (9)Permit Issued (12)Signed Off (6)Violation (39)Inspection (3)Special Inspection (21)
04/02/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00979904-I1
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00978909-I1
03/17/2026
Permit issued — General Construction
B00919075-I1-GC
02/13/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931287-I1
11/04/2025
Signed off — Alteration
B01013884-I1
07/31/2025
Permit issued — General Construction
B00919075-I1-GC
07/16/2025
Permit issued — General Construction
B00931287-I1-GC
03/03/2025
Permit issued — Sidewalk Shed
B01013884-I1-SH
02/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/15/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01167082-I1
01/15/2025
Permit issued — Supported Scaffold
B01167082-I1-SF
09/12/2024
Permit issued — Plumbing
B00978909-I1-PL
09/04/2024
Permit issued — General Construction
B00919075-I1-GC
08/24/2024
Violation issued (HPD, open)
B
08/24/2024
Violation issued (HPD, closed)
C
08/24/2024
Violation issued (HPD, open)
A
08/24/2024
Violation issued (HPD, open)
C
08/24/2024
Violation issued (HPD, open)
A
08/24/2024
Violation issued (HPD, open)
A
08/15/2024
Permit issued — General Construction
B00931287-I1-GC
08/12/2024
Permit issued — Mechanical Systems
B00979904-I1-MS
08/01/2024
Filed — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00979904-I1
07/16/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00978909-I1
07/16/2024
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00919075-I1
07/16/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
04/25/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931287-P1
04/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/19/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
04/19/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
04/11/2024
Violation issued (HPD, closed)
A
03/26/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 218 ROCHESTER AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00841917-I1
03/18/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931287-I1
03/15/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00961482-I1
03/06/2024
Permit issued — Sidewalk Shed
B01013884-I1-SH
03/05/2024
Filed — Alteration
B01013884-I1
01/18/2024
Violation issued (HPD, open)
C
01/18/2024
Violation issued (HPD, closed)
C
01/18/2024
Violation issued (HPD, open)
C
12/19/2023
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
12/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
12/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
11/16/2023
Permit issued — Sidewalk Shed
B00961482-I1-SH
11/15/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00961482-I1
03/28/2023
Permit issued — Sidewalk Shed
B00841917-I1-SH
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC07/31/2025
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN07/16/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/03/2025
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP01/15/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP09/12/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC09/04/2024
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN08/15/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL08/12/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/06/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/16/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC03/28/2023
4 projects · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
03/26/2024Permit IssuedHYLAN DATACOM & ELECL LLC—
03/26/2024Permit IssuedHYLAN DATACOM & ELECL LLC—
12/04/2023Permit IssuedNASH ELECTRIC SERVICES IN—
1 project · most recent 01/15/2025
Scaffold
FiledStatusContractorScope
01/15/2025Permit IssuedACE GROUP NY CORPScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/16/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/16/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
07/14/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/14/2024FinalSAMI HAJJAR P.Eprogress
07/14/2024Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
07/14/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
07/14/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
07/14/2024VestibulesSAMI HAJJAR P.Eenergy_progress
07/14/2024Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
07/14/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
07/14/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
07/14/2024Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
04/19/2024Tenant Protection Plan Compliance—special
04/19/2024FinalSAMI HAJJAR P.Eprogress
04/19/2024MasonrySAMI HAJJAR P.Especial
12/19/2023Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
12/19/2023FinalSAMI HAJJAR P.Eprogress
12/19/2023Mechanical SystemsSAMI HAJJAR P.Especial
12/19/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/18/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/18/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00841917-I1Request digital key ↗
08/26/2026B00961482-I1Request digital key ↗
08/25/2026B01013884-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00961482-I1Open ↗
08/25/2026B00931287-P1Open ↗
08/25/2026B00931287-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00931287-P1Open ↗
08/29/2026B00979904-I1Open ↗
08/25/2026B00919075-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00931287-P1Open ↗
08/29/2026B00979904-I1Open ↗
08/25/2026B00919075-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026B00931287-I1Open ↗
08/24/2026B00919075-I1Open ↗
08/24/2026B00978909-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00979904-I1Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/25/2026B00931287-P1Open ↗
08/25/2026B00931287-I1Open ↗
08/13/2026B00919075-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B01167082-I1Open ↗