Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofStellar ManagementUnder Construction12p · 4 filings · 20 docs
MechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
RELATED PLUMBING AND SPRINKLER WORK TO ACCOMODATE NEW COMMERCIAL TENANT AT EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE TO USE , EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
On file for this project
61 documents
Relocation / replacement of 18th Floor air-source heat pump /condenser, for cooling only, from 18th Floor interior MER to 20th Floor / Roof.. Fan coils, ductwork, ventilation is existing to remain.
On file for this project
4 documents · 1 drawing sheet
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
24 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Penthousestellar20p · 1 filing · 12 docs
Fire Protection
Issued Permit Scope
Sprinklers
INSTALLATION OF NEW SPRINKLER HEADS ON 3RD, 4TH, 10TH, 11TH, 14TH, 19TH, 20TH FLOOR& PENTHOUSE AS SHOWN IN PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
Floor 21Stellar Management1p · 1 filing · 7 docs
Mechanical
Issued Permit Scope
Mechanical Systems
THE REPLACEMENT OF (2) EXISTING HEAT PUMPS ON THE ROOF (LOCATION TO BE THE SAME) & THE REPLACEMENT OF(2) EXISTING AIR HANDLING UNITS AT INTERIOR SPACES (LOCATION TO BE THE SAME) AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUANCY
On file for this project
7 documents
Floor 20stellar25p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
THE REPLACEMENT OF (2) EXISTING HEAT PUMPS ON THE ROOF (LOCATION TO BE THE SAME) & THE REPLACEMENT OF(2) EXISTING AIR HANDLING UNITS AT INTERIOR SPACES (LOCATION TO BE THE SAME) AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUANCY
On file for this project
7 documents
Relocation / replacement of 18th Floor air-source heat pump /condenser, for cooling only, from 18th Floor interior MER to 20th Floor / Roof.. Fan coils, ductwork, ventilation is existing to remain.
On file for this project
4 documents
INSTALLATION OF NEW SPRINKLER HEADS ON 3RD, 4TH, 10TH, 11TH, 14TH, 19TH, 20TH FLOOR& PENTHOUSE AS SHOWN IN PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
12 documents
Floor 19stellar24p · 2 filings · 16 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Relocation / replacement of 18th Floor air-source heat pump /condenser, for cooling only, from 18th Floor interior MER to 20th Floor / Roof.. Fan coils, ductwork, ventilation is existing to remain.
On file for this project
4 documents
INSTALLATION OF NEW SPRINKLER HEADS ON 3RD, 4TH, 10TH, 11TH, 14TH, 19TH, 20TH FLOOR& PENTHOUSE AS SHOWN IN PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
12 documents
Floor 18stellar21p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Relocation / replacement of 18th Floor air-source heat pump /condenser, for cooling only, from 18th Floor interior MER to 20th Floor / Roof.. Fan coils, ductwork, ventilation is existing to remain.
On file for this project
4 documents
MECHANICAL WORKS AS SHOWN IN PLANS AT 18TH FLOOR. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
On file for this project
7 documents · 2 drawing sheets
SPRINKLER WORKS AS SHOWN IN PLANS ON THE 18TH FLOOR. NO CHANGE IN EGRESS, USE OROCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 17AlleyCorp1 filing · 14 docs
No filed description on record for this project.
On file for this project
14 documents · 12 drawing sheets
Floor 16
Floor 15
Floor 14stellar18p · 1 filing · 12 docs
Fire Protection
Issued Permit Scope
Sprinklers
INSTALLATION OF NEW SPRINKLER HEADS ON 3RD, 4TH, 10TH, 11TH, 14TH, 19TH, 20TH FLOOR& PENTHOUSE AS SHOWN IN PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
12 documents
Floor 13
Floor 12Stellar Management2p · 1 filing · 8 docs
Fire Protection
Issued Permit Scope
Sprinklers
FILING SPRINKLER MODIFICATION TO 12 FLOOR OFFICE SPACE by adding 64 heads on existing water service AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
8 documents · 1 drawing sheet
Floor 11stellar20p · 1 filing · 12 docs
Fire Protection
Issued Permit Scope
Sprinklers
INSTALLATION OF NEW SPRINKLER HEADS ON 3RD, 4TH, 10TH, 11TH, 14TH, 19TH, 20TH FLOOR& PENTHOUSE AS SHOWN IN PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
Floor 10stellar52p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MECHANICAL WORKS AS SHOWN IN PLANS AT THE 10th FLOOR COMMERCIAL SPACE. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
On file for this project
6 documents · 1 drawing sheet
CONSTRUCTION OF CONFERENCE ROOM AND OFFICES AT 10TH FLOOR COMMERCIAL SPACE. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
On file for this project
4 documents · 4 drawing sheets
SPRINKLER WORKS AS SHOWN IN PLANS ON THE 10TH FLOOR COMMERCIAL SPACE. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 9
Floor 8
Floor 7Stellar Management4p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR PARTITIONS AND MILLWORK TO BE DEMOLISHED AS SHOWN ON 6TH & 7TH FLOOR TO CREATE A SPACE WHITE-BOX FOR FUTURE TENANT. NO CHNAGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Floor 6Ambition Gym28p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR PARTITIONS AND MILLWORK TO BE DEMOLISHED AS SHOWN ON 6TH & 7TH FLOOR TO CREATE A SPACE WHITE-BOX FOR FUTURE TENANT. NO CHNAGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
ALT-CO FILED FOR INTERIOR RENOVATIONS AND CHANGE OF USE AT CELLAR LEVEL FROM STORAGE TO BUSSINESS OCCUPANCY AS PER PLANS FILED.
On file for this project
30 documents
Floor 5Artisan Partners, Ambition Gym37p · 4 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Sign
Minor interior demolition: removal/disposal of interior partitions; Installation of new interior partitions subdividing existing offices, suspended ceilings, flooring and finishes on the 5th Floor as per plans (Artisan Partners.)
On file for this project
4 documents · 5 drawing sheets
INTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY HANGING SIGN - IN PROPERTY LINES - AMBITION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
ALT-CO FILED FOR INTERIOR RENOVATIONS AND CHANGE OF USE AT CELLAR LEVEL FROM STORAGE TO BUSSINESS OCCUPANCY AS PER PLANS FILED.
On file for this project
30 documents
Latest 3 of 4 filings on this floor.
Floor 4Ambition Gym, stellarUnder Construction78p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sign · Sprinklers
Modifications to existing sprinkler system & piping. No change in use, egress or occupancy.
On file for this project
19 documents · 3 drawing sheets
INTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY HANGING SIGN - IN PROPERTY LINES - AMBITION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
PLUMBING AND SPRINKLER WORKS AS SHOWN IN PLANS ON THE 4TH FLOOR OFFICE SPACE. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3Sotheby's, stellar +190p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers
Plumbing work filed for interior renovation of commercial office space
On file for this project
25 documents · 2 drawing sheets
PLUMBING AND SPRINKLER WORKS AS SHOWN IN PLANS ON THE 3RD FLOOR OFFICE SPACE. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
On file for this project
5 documents · 3 drawing sheets
Interior restroom partition layout changes. Modified plumbing removal and relocation of one ADA bathroom. No change to use, egress, or occupancy.
On file for this project
5 documents
Latest 3 of 9 filings on this floor.
Floor 2Ambition GymUnder Construction29p · 3 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sign
RELATED PLUMBING AND SPRINKLER WORK TO ACCOMODATE NEW COMMERCIAL TENANT AT EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE TO USE , EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
On file for this project
61 documents
INTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY HANGING SIGN - IN PROPERTY LINES - AMBITION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
ALT-CO FILED FOR INTERIOR RENOVATIONS AND CHANGE OF USE AT CELLAR LEVEL FROM STORAGE TO BUSSINESS OCCUPANCY AS PER PLANS FILED.
On file for this project
30 documents
Floor 1Sa Hospitality Group, Ambition Gym +1Under Construction175p · 12 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sidewalk Shed · Sign · Sprinklers · Supported Scaffold
RELATED PLUMBING AND SPRINKLER WORK TO ACCOMODATE NEW COMMERCIAL TENANT AT EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE TO USE , EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
On file for this project
61 documents · 2 drawing sheets
INTERIOR RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENT AS PER PLANS FILED HEREWITH. PARTITION, FINISH AND FIXTURE WORK. NEW AWNING AND SIGNAGE. NO CHANGE IN USE AND EGRESS. MEP TO BE FILED UNDER SEPARATE APPLICATIONS
On file for this project
7 documents · 5 drawing sheets
SPRINKLER WORK FILED IN CONJUNCTION WITH ALT-CO APPLICATION.
On file for this project
8 documents
Latest 3 of 12 filings on this floor.
MezzanineSa Hospitality Group, Ambition Gym +1Under Construction87p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
RELATED PLUMBING AND SPRINKLER WORK TO ACCOMODATE NEW COMMERCIAL TENANT AT EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE TO USE , EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
On file for this project
61 documents · 2 drawing sheets
INTERIOR RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENT AS PER PLANS FILED HEREWITH. PARTITION, FINISH AND FIXTURE WORK. NEW AWNING AND SIGNAGE. NO CHANGE IN USE AND EGRESS. MEP TO BE FILED UNDER SEPARATE APPLICATIONS
On file for this project
7 documents · 6 drawing sheets
ALT-CO FILED FOR INTERIOR RENOVATIONS AND CHANGE OF USE AT CELLAR LEVEL FROM STORAGE TO BUSSINESS OCCUPANCY AS PER PLANS FILED.
On file for this project
30 documents
Latest 3 of 6 filings on this floor.
CellarSa Hospitality Group, Ambition Gym +1Under Construction129p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
RELATED PLUMBING AND SPRINKLER WORK TO ACCOMODATE NEW COMMERCIAL TENANT AT EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE TO USE , EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
On file for this project
61 documents · 1 drawing sheet
INTERIOR RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENT AS PER PLANS FILED HEREWITH. PARTITION, FINISH AND FIXTURE WORK. NEW AWNING AND SIGNAGE. NO CHANGE IN USE AND EGRESS. MEP TO BE FILED UNDER SEPARATE APPLICATIONS
On file for this project
7 documents · 5 drawing sheets
TENANT FIT-OUT OF EXISTING HEALTH AND FITNESS ESTABLISHMENT IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
6 documents
Latest 3 of 10 filings on this floor.
Sub-CellarAmbition Gym47p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Application filed for new plumbing piping and fixtures at Sub-Cellar and Cellar. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
PLUMBING WORK FILED IN CONJUNCTION WITH ALT-CO APPLICATION.
On file for this project
11 documents
ALT-CO FILED FOR INTERIOR RENOVATIONS AND CHANGE OF USE AT CELLAR LEVEL FROM STORAGE TO BUSSINESS OCCUPANCY AS PER PLANS FILED.
On file for this project
30 documents
Site & exteriorStellar Management5p · 2 filings · 8 docs
ArchitectureElectricalEquipmentGeneralLandscapeMechanicalStructural
Issued Permit Scope
Sidewalk Shed
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
On file for this project
2 documents · 1 drawing sheet
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
On file for this project
6 documents · 5 drawing sheets