← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Samson Mgt. 220 W. 93 St Condominium
220 WEST 93RD STREET · BIN 1033616
💬 Discuss this project
1926Year Built
15Stories
RMBuilding Class
C4-6AZoning
103,516 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized21 Active Violations 1 likely answered ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: The 220 West 93rd St Condominum · 10,071 sf lot · 10.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSamson Management LLCUnder Construction3p · 3 filings · 20 docs
PenthouseUnit PH33p · 4 filings · 20 docs
Floor 15Unit 15C9p · 2 filings · 20 docs
Floor 14Unit 14B, Unit 14DUnder Construction21p · 3 filings · 20 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Unit 7D18p · 1 filing · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Samson Management LLCUnder Construction6p · 4 filings · 20 docs
Site & exteriorExterior restoration4p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Samson Management 220 W 93 St Condo2103/21/2026
220 West 93rd St Condominium1703/21/2026
Mike1107/08/2026
220 West 93rd Street903/21/2026
2500 Broadway703/21/2026
Viles Co203/21/2026
2500 Broadway LLC- Heller Realty203/21/2026
Myhome103/22/2026
Heller Realty103/21/2026
Capital Holding Company103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G.palladino407/13/2026
Costa Arch & Engineering1106/11/2026
Arquitectura Varela304/17/2024
Lewandowska Architect104/26/2023
Adal Engineering104/26/2023
Bertolini Architectural Works111/28/2022
Kohler Ronan410/24/2022
Design Group in H&K210/14/2022
Charles Hilton Architects203/14/2022
Dominick R. Pilla Associates104/23/2021
Green Design103/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Group in H K403/21/2026
Costa1603/21/2026
Quick Filing of NY203/21/2026
J. Callahan Consulting703/21/2026
Atlantic Building Supply203/21/2026
Bertolini Architectural Works203/21/2026
Quick Filing203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Shalbro Construction GroupScaffold707/08/2026
H.I.IGeneral Contractor607/08/2026
Euro Group Design GroupGeneral Contractor507/08/2026
Pepaj ConstructionGeneral Contractor507/08/2026
Shalbro Construction GroupGeneral Contractor407/08/2026
Z.W. Plumbing & HeatingPlumbing207/08/2026
Ecny Electrical ContractorsElectrical203/22/2026
DK Construction OneGeneral Contractor207/08/2026
Hamilton Air CompanyGeneral Contractor203/21/2026
Impact PlumbingPlumbing207/08/2026
P&H Electric D/B/A Mage ElectricElectrical103/22/2026
Amergy Electric of NYElectrical103/21/2026
Lina ElectricElectrical103/22/2026
Gsa ElectricElectrical103/22/2026
BDS ElectricElectrical103/22/2026
Aujla ElectricElectrical103/22/2026
A&H Express Plumbing & HeatingPlumbing105/15/2026
Aruum InteriorGeneral Contractor107/08/2026
Bura ConstructionGeneral Contractor104/09/2026
CK Plumbing & MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Costa Architects & Engineering1321906/11/2026
Crosscheck Inspection Services544203/20/2026
Adal Engineering4205104/26/2023
Design Group in H&K1363210/14/2022
Dominick R. Pilla1300403/14/2022
Building Lifecycle
All (204)Filed (31)Permit Issued (29)Signed Off (14)Facade (FISP) (18)Violation (60)Inspection (20)Objection (2)Special Inspection (30)
08/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2026
Special inspection requirement — Final
GEORGE PALLADINO
07/14/2026
Special inspection requirement — Interior lighting power
GEORGE PALLADINO
07/14/2026
Special inspection requirement — Lighting controls
GEORGE PALLADINO
07/13/2026
Filed — Alteration
FILING FOR PLUMBING MODIFICATIONS FOR APARTMENT RENOVATION
M01083706-P2
07/13/2026
Special inspection requirement — Lighting controls
GEORGE PALLADINO
07/13/2026
Special inspection requirement — Final
GEORGE PALLADINO
07/13/2026
Special inspection requirement — Interior lighting power
GEORGE PALLADINO
06/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
06/15/2026
Special inspection requirement — Concrete - Cast-In-Place
George Paider
06/15/2026
Special inspection requirement — Final
George Paider
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Paider
06/11/2026
Filed — Alteration
REMOVING INTERIOR BUILT-IN BENCHES, KNEEWALL ENCLOSURES &INFILL EXISTING FLOOR OPENINGS. INFILL FLOOR OPENINGS TO MATCH EXISTING CONDITIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01372093-P2
06/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/10/2026
Special inspection requirement — Concrete - Cast-In-Place
George Paider
06/10/2026
Special inspection requirement — Final
George Paider
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Paider
05/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2026
Violation issued (HPD, open)
C
04/28/2026
Violation issued (HPD, open)
C
04/28/2026
Violation issued (HPD, open)
B
04/28/2026
Violation issued (HPD, open)
B
04/28/2026
Violation issued (HPD, open)
B
04/07/2026
Permit issued — Structural
M01372093-I1-GC
04/06/2026
Filed — Alteration
REMOVING INTERIOR BUILT-IN BENCHES, KNEEWALL ENCLOSURES &INFILL EXISTING FLOOR OPENINGS. INFILL FLOOR OPENINGS TO MATCH EXISTING CONDITIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01372093-P1
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
George Paider
04/06/2026
Special inspection requirement — Final
George Paider
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Paider
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/20/2026
Filed — Alteration
REMOVING INTERIOR BUILT-IN BENCHES, KNEEWALL ENCLOSURES &INFILL EXISTING FLOOR OPENINGS. INFILL FLOOR OPENINGS TO MATCH EXISTING CONDITIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01372093-I1
03/18/2026
Permit issued — General Construction
M01083706-I1-GC
02/25/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, open)
A
02/25/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, open)
B
02/18/2026
Violation issued (HPD, open)
B
02/18/2026
Violation issued (HPD, closed)
B
02/09/2026
Signed off — Alteration
M00845431-I1
12/23/2025
Signed off — Alteration
Herewith filing for removal, replacement and new plumbing fixtures in apt 7D.
M01182166-I1
12/23/2025
Signed off — Alteration
Herewith filing for removal, replacement and new plumbing fixtures in apt 7D.
M01182166-S2
11/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/21/2025
Filed — Alteration
Herewith filing for removal, replacement and new plumbing fixtures in apt 7D.
M01182166-P1
11/21/2025
Signed off — Alteration
Herewith filing for removal, replacement and new plumbing fixtures in apt 7D.
M01182166-S1
11/12/2025
Permit issued — Plumbing
M01083706-S1-PL
10/28/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, closed)
C
10/28/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, closed)
C
10/28/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, closed)
B
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedBura Construction04/07/2026
DOB NOWGeneral ConstructionPermit IssuedDK Construction One03/18/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating11/12/2025
DOB NOWMechanical SystemsSigned-offHamilton Air Company05/20/2025
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group05/20/2025
DOB NOWPlumbingSigned-offImpact Plumbing05/16/2025
DOB NOWGeneral ConstructionPermit IssuedDK Construction One11/06/2024
DOB NOWGeneral ConstructionSigned-offShalbro Construction Group05/09/2024
DOB NOWGeneral ConstructionSigned-offPepaj Construction03/29/2024
DOB NOWMechanical SystemsPermit IssuedPepaj Construction03/29/2024
DOB NOWSidewalk ShedSigned-offShalbro Construction Group08/25/2023
DOB NOWMechanical SystemsPermit IssuedPepaj Construction07/18/2023
DOB NOWGeneral ConstructionSigned-offPepaj Construction06/29/2023
DOB NOWGeneral ConstructionSigned-offShalbro Construction Group05/04/2023
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group11/29/2022
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical11/03/2022
DOB NOWGeneral ConstructionPermit IssuedAruum Interior10/26/2022
DOB NOWSidewalk ShedSigned-offShalbro Construction Group09/20/2022
DOB NOWPlumbingSigned-offZ.W. Plumbing & Heating09/15/2022
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group07/25/2022
DOB NOWPlumbingSigned-offImpact Plumbing07/20/2022
DOB NOWGeneral ConstructionSigned-offH.I.I05/24/2022
DOB NOWPlumbingSigned-offZ.W. Plumbing & Heating09/02/2021
DOB NOWStructuralSigned-offH.I.I09/01/2021
DOB NOWMechanical SystemsSigned-offH.I.I08/27/2021
DOB NOWGeneral ConstructionSigned-offH.I.I08/27/2021
DOB NOWSidewalk ShedSigned-offShalbro Construction Group04/05/2019
DOB NOWSidewalk ShedSigned-offShalbro Construction Group04/18/2018
DOB NOWSidewalk ShedSigned-offShalbro Construction Group03/23/2018
BISPLISSUEDPlumbing-It Mechanical02/25/2022
BISOTISSUEDCauldwell Wingate Co09/27/2021
BISOTISSUEDCauldwell Wingate Co01/14/2021
BISOTISSUEDDNA Contracting03/22/2019
BISOTISSUEDThe Vorea Construction Co12/24/2018
BISOTISSUEDDNA Contracting10/02/2018
BISPLISSUEDService Tech Mechanical & Plumbing10/12/2017
BISOTISSUEDUnited Chimney09/19/2017
BISOTISSUEDLumitech Contracting06/14/2017
BISOTISSUEDEuro Group Design Group11/23/2016
BISPLISSUEDAbr Plumbing & Heating Contracting11/02/2016
+ 39 more permits on file
23 projects · most recent 09/17/2026
General Wiring Lighting
FiledStatusContractorScope
09/17/2026CompleteDaven Electric—
06/30/2026Permit IssuedOgc Electrical ContractorLighting
01/09/2026CompleteCresco Electrical—
10/21/2025Permit IssuedAmergy Electric of NYGeneral Wiring
08/15/2025CompleteLina ElectricGeneral Wiring
05/19/2025CompleteVlashava Electric Contracting—
05/16/2025CompleteApollo Electric USA—
10/17/2024CompleteAujla Electric—
10/30/2023CompleteEcny Electrical Contractors—
10/06/2023Permit IssuedFalco Electrical ServicesGeneral Wiring
06/29/2023Permit IssuedGramercy ElectricGeneral Wiring
02/01/2023CancelledP&H Electric D/B/A Mage ElectricGeneral Wiring
01/19/2023CompleteBDS Electric—
11/04/2022CompleteApollo Electric USAGeneral Wiring
08/26/2022CompleteEinstein Electrical—
2 projects · most recent 07/13/2026
Concrete
FiledStatusContractorScope
07/13/2026Permit IssuedDK Construction One1 scope_items
06/11/2026Permit IssuedBura ConstructionConcrete
1 project · most recent 06/11/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
06/11/2026Permit IssuedBura ConstructionTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
08/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
07/14/2026FinalGEORGE PALLADINOprogress
07/14/2026Lighting controlsGEORGE PALLADINOenergy_progress
07/14/2026Interior lighting powerGEORGE PALLADINOenergy_progress
07/13/2026Lighting controlsGEORGE PALLADINOenergy_progress
07/13/2026Interior lighting powerGEORGE PALLADINOenergy_progress
07/13/2026FinalGEORGE PALLADINOprogress
06/15/2026Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
06/15/2026FinalGeorge Paiderprogress
06/15/2026Fire-Resistant Penetrations and JointsGeorge Paiderspecial
06/15/2026Concrete - Cast-In-PlaceGeorge Paiderspecial
06/10/2026Concrete - Cast-In-PlaceGeorge Paiderspecial
06/10/2026Fire-Resistant Penetrations and JointsGeorge Paiderspecial
06/10/2026Tenant Protection Plan Compliance—special
06/10/2026FinalGeorge Paiderprogress
04/06/2026Fire-Resistant Penetrations and JointsGeorge Paiderspecial
04/06/2026Concrete - Cast-In-PlaceGeorge Paiderspecial
04/06/2026Tenant Protection Plan Compliance—special
04/06/2026FinalGeorge Paiderprogress
04/07/2025Fire-Resistance Rated ConstructionANGELO COSTAprogress
04/07/2025Fire-Resistant Penetrations and JointsANGELO COSTAspecial
04/07/2025Maintenance informationANGELO COSTAenergy_progress
04/07/2025HVAC-R and service water heating equipmentANGELO COSTAenergy_progress
04/07/2025HVAC-R and service water piping design and insulationANGELO COSTAenergy_progress
04/07/2025HVAC-R and service water heating system controlsANGELO COSTAenergy_progress
04/07/2025Permanent certificateANGELO COSTAenergy_progress
Latest 25 of 78.
▾Documents — 957 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch25
09/06/2026M00029408-I1Request digital key ↗
09/03/2026M00478762-I1Request digital key ↗
09/02/2026M00724210-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026M00473407-P1Request digital key ↗
09/01/2026M00473407-I1Request digital key ↗
08/15/2026M00473407-P3Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/02/2026M00470979-P1Request digital key ↗
09/02/2026M00470979-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/03/2026M00473414-I1Request digital key ↗
▸Applications & Permits167
▸BISPLAN / WORK APPROVAL APPLICATION86
09/03/2025122367624Open ↗
08/28/2025122367624Open ↗
08/26/2025122367624Open ↗
Showing 3 of 86 on file for this type
▸BISWORK PERMIT APPLICATION80
02/28/2022110225505Open ↗
01/14/2021140983933Open ↗
12/22/2018140823982Open ↗
Showing 3 of 80 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications253
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
01/28/2019140823982Open ↗
01/23/2019140823982Open ↗
04/02/2018140695326Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWProgress Inspector Seal & Signature52
09/01/2026M01083706-I1Open ↗
09/01/2026M01083706-I1Open ↗
09/01/2026M01083706-I1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/06/2026M00029408-I1Open ↗
09/03/2026M00473414-I1Open ↗
09/02/2026M00724210-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST29
09/03/2025122367624Open ↗
06/21/2017121277028Open ↗
Showing 2 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
08/28/2026M00724180-P2Open ↗
08/28/2026M01372093-P2Open ↗
08/28/2026M01372093-P2Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
12/22/2018140823982Open ↗
04/30/2018140756849Open ↗
09/15/2017140695326Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
12/22/2018140823982Open ↗
04/30/2018140756849Open ↗
09/15/2017140695326Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
12/22/2018140823982Open ↗
04/30/2018140756849Open ↗
09/15/2017140695326Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/10/2020140983933Open ↗
Showing 1 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment87
▸BISSELF-CERT PLUMBING NOTICE42
12/28/2015122358117Open ↗
07/23/2015122358117Open ↗
07/17/2015122367624Open ↗
Showing 3 of 42 on file for this type
▸BISSCHEDULE B - PLUMBING28
03/17/2022110225505Open ↗
10/14/2016140562246Open ↗
Showing 2 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
09/09/2025122367624Open ↗
09/21/2022140983933Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES6
02/17/2022110225505Open ↗
12/22/2018140823982Open ↗
04/30/2018140756849Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos73
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/03/2026M00473414-I1Open ↗
09/02/2026M00724210-I1Open ↗
09/02/2026M00724180-P2Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
12/22/2018140823982Open ↗
04/30/2018140756849Open ↗
09/15/2017140695326Open ↗
Showing 3 of 20 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/22/2018140823982Open ↗
▸Energy Compliance70
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
04/02/2018140695326Open ↗
06/12/2017121277028Open ↗
05/15/2017140562246Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
07/23/2020140756849Open ↗
04/02/2018140695326Open ↗
05/15/2017140562246Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
08/28/2025122367624Open ↗
01/14/2021140983933Open ↗
01/05/2021140983933Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
12/10/2020140983933Open ↗
12/22/2018140823982Open ↗
04/30/2018140756849Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
09/09/2025122367624Open ↗
04/02/2024122407207Open ↗
09/21/2022140983933Open ↗
▸BISNYCECC ANALYSIS3
12/22/2018140823982Open ↗
04/30/2018140756849Open ↗
Showing 2 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00473414-I1Open ↗
08/13/2026M00470979-I1Open ↗
09/02/2026M00724180-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERIOR LIGHTING POWER1
09/21/2022140983933Open ↗
▸BISLIGHTING CONTROLS1
09/21/2022140983933Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/09/2025122367624Open ↗
▸BISINTERIOR LIGHTING POWER1
09/21/2022140983933Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY20
08/28/2025122367624Open ↗
08/28/2025122367624Open ↗
05/17/2022110225505Open ↗
Showing 3 of 20 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
09/09/2025122367624Open ↗
09/21/2022140983933Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING2
01/28/2019140823982Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/21/2022140983933Open ↗
▸BIS2008 CODE TR1 REQUIRED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs65
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
06/27/2023140983933Open ↗
05/18/2022110225505Open ↗
07/23/2020140756849Open ↗
Showing 3 of 35 on file for this type
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/28/2022110225505Open ↗
04/02/2018140695326Open ↗
04/02/2018140695326Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026M08006445-I1Open ↗
08/13/2026M08006445-P1Open ↗
08/13/2026M08006445-P2Open ↗
▸Cost, Insurance & Ownership90
▸BISCOST AFFIDAVIT83
05/17/2022110225505Open ↗
05/14/2022110225505Open ↗
10/12/2021140756849Open ↗
Showing 3 of 83 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/09/2025122367624Open ↗
04/02/2024122407207Open ↗
06/27/2023140983933Open ↗
▸Filing & Intake Forms68
▸BISEFILING COVER SHEET32
06/12/2017121277028Open ↗
Showing 1 of 32 on file for this type
▸BISADDITIONAL INFORMATION22
02/08/2023140983933Open ↗
04/16/2022110225505Open ↗
10/12/2021140756849Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
12/10/2020140983933Open ↗
12/22/2018140823982Open ↗
04/30/2018140756849Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
02/28/2022110225505Open ↗
03/20/2019140756849Open ↗
01/28/2019140823982Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
02/15/2022110225505Open ↗
Showing 1 of 4 on file for this type
▸BISDHCR DOCUMENT1
12/22/2018140823982Open ↗