Elevator cooperative
225 LINCOLN PLACE
BROOKLYN · BIN 3024464
💬 Discuss this project
1924Year Built
6Stories
D4Building Class
R7BZoning
70,042 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized35 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 225 LINCOLN APTS CORP · 12,994 sf lot · 5.39 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 31p · 1 filing · 16 docs
Floor 21p · 1 filing · 14 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAXWELL-KATES1309/01/2026
KINGS GROUP NY807/08/2026
225 LINCOLN APTS2103/22/2026
MUNICIPAL INSPECTION CORP103/22/2026
225 LINCOLN PLACE APT703/21/2026
C O CADENA CONSTRUCTION303/21/2026
ADVANCED MANAGEMENT SERVICE303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING STUDIO ARCHITECTS203/25/2026
SA-DA ARCHITECTURE305/15/2023
ASHRAF CORP112/02/2021
LAURIE LIEBERMAN ARCHITECTS207/06/2021
SYED ENGINEERING, P.C.203/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC103/21/2026
GREGG ROTHSTEIN ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPREME RENOVATION A2Z INGeneral Contractor507/08/2026
KINGS GROUP NY CORPGeneral Contractor307/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor107/08/2026
EMPIRE ERECTORS & ELECTRIElectrical103/21/2026
MORALES, WILLIAMElectrical103/21/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018203/25/2026
SA-DA ARCHITECTURE2640305/15/2023
Building Lifecycle
All (152)Filed (10)Permit Issued (9)Signed Off (8)Facade (FISP) (12)Violation (60)Inspection (8)Objection (30)Special Inspection (15)
06/26/2026
Signed off — Alteration
REMOVE EXISTING SHAFT ENCLOSURE, SEAL OPENING IN FLOOR AND CEIILING. NEW PARTITIONS AND KITCHEN CABINETS IN APT 3G ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01321139-I1
06/16/2026
Violation issued (HPD, open)
C
06/16/2026
Violation issued (HPD, closed)
C
06/15/2026
Violation issued (HPD, open)
C
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
C
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
C
06/15/2026
Violation issued (HPD, open)
C
06/15/2026
Violation issued (HPD, open)
C
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
04/02/2026
Special inspection requirement — Final
William Ryan
03/25/2026
Filed — Alteration
REMOVE EXISTING SHAFT ENCLOSURE, SEAL OPENING IN FLOOR AND CEIILING. NEW PARTITIONS AND KITCHEN CABINETS IN APT 3G ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01321139-P1
03/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
03/24/2026
Special inspection requirement — Final
William Ryan
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
03/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
01/21/2026
Permit issued — Structural
B01321139-I1-GC-CX
12/29/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Inspections
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Scope
11/21/2025
Filed — Alteration
REMOVE EXISTING SHAFT ENCLOSURE, SEAL OPENING IN FLOOR AND CEIILING. NEW PARTITIONS AND KITCHEN CABINETS IN APT 3G ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01321139-I1
06/11/2025
Violation issued (HPD, closed)
C
06/11/2025
Violation issued (HPD, closed)
C
06/11/2025
Violation issued (HPD, closed)
C
03/14/2024
Violation issued (HPD, open)
B
03/14/2024
Violation issued (HPD, open)
C
06/13/2023
Signed off — Alteration
WORK TO COMBINE APTS. 2A & 2J ON THE 2ND FLOOR ON AN EXISTING 6 STORY MULTIPLE DWELLING UNDER TPPN #3/97. ALTERATIONS TO INCLUDE NEW AND RELOCATED PARTITIONS. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR ZONING UNDER THIS APPLICATION.
B00776081-I1
06/13/2023
Signed off — Alteration
PLUMBING WORK TO COMBINED APTS. 2A & 2J ON THE 2ND FLOOR ON AN EXISTING 6 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO PLUMBING. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR ZONING UNDER THIS APPLICATION.
B00783593-I1
05/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Stoltz
05/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Stoltz
05/26/2023
Special inspection requirement — Final
Alexander Stoltz
05/15/2023
Filed — Alteration
WORK TO COMBINE APTS. 2A & 2J ON THE 2ND FLOOR ON AN EXISTING 6 STORY MULTIPLE DWELLING UNDER TPPN #3/97. ALTERATIONS TO INCLUDE NEW AND RELOCATED PARTITIONS. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR ZONING UNDER THIS APPLICATION.
B00776081-P1
05/10/2023
Special inspection requirement — Final
Alexander Stoltz
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Stoltz
05/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Stoltz
05/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/20/2022
Permit issued — General Construction
B00776081-I1-GC
12/16/2022
Permit issued — Plumbing
B00783593-I1-PL
10/12/2022
Objection raised — Mechanical
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Scope
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Other
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSUPREME RENOVATION A2Z IN01/21/2026
DOB NOWGeneral ConstructionSigned-offSUPREME RENOVATION A2Z IN12/20/2022
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP12/16/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION12/03/2021
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING10/18/2021
DOB NOWGeneral ConstructionSigned-offSUPREME RENOVATION A2Z IN10/13/2021
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP09/23/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP04/02/2021
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP09/22/2020
BISOTISSUEDSKY RISE RESTORATION INC10/18/2021
BISOTISSUEDSKY RISE RESTORATION INC11/25/2020
BISEQISSUEDCADENA CONSTRUCTION INC09/25/2018
BISOTISSUEDCADENA CONSTRUCTION INC09/25/2018
BISEQISSUEDROCKLEDGE SCAFFOLD CORP09/27/2016
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/22/2016
BISEQISSUEDCADENA CONSTRUCTION INC04/18/2016
BISOTISSUEDCADENA CONSTRUCTION INC02/22/2016
BISOTISSUEDCADENA CONSTRUCTION INC10/14/2015
BISEQISSUEDROCKLEDGE SCAFFOLD CORP10/05/2015
BISPLISSUEDTOP DOG PLBG & HTG CORP03/11/2011
BISOTISSUEDGREENTECH CONSTRUCTION CO02/14/2011
BISPLISSUEDPARKSET PLMBG CO.,INC04/13/2010
BISOTISSUEDSKYLINE RESTORATION INC03/31/2010
BISEQISSUEDEVEREST SCAFFOLDING INC03/23/2010
BISPLISSUEDAMOK INC01/26/2010
BISOTISSUEDDLM CONTRACTORS INC12/08/2009
BISOTISSUEDDLM CONTRACTORS INC11/25/2009
BISOTISSUEDHORIZON FINE INTERIOR,INC11/23/2009
BISOTISSUEDSKYLINE RESTORATION INC09/04/2009
BISPLISSUEDAJIT ONE MECH&GEN'L CONTR10/12/2006
BISOTISSUEDFORTUNY INTERIOR SPECIALISTS09/21/2006
BISOTISSUEDEVERLAST CUSTOM CONSTRUCTION02/08/2006
BISEQISSUEDPERIMETER BRIDGE & SACFFOLD04/26/2002
BISEQISSUEDPERIMETER BRIDGE & SACFFOLD12/14/2001
BISFSISSUEDPARKSET PLUMBING CO INC06/25/1991
BISPLISSUEDPARKSET PLUMBING CO INC06/25/1991
8 projects · most recent 02/02/2023
General Wiring
FiledStatusContractorScope
02/02/2023CompleteLUME ELECTRIC INCGeneral Wiring
12/27/2022CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
04/20/2022CompleteLUME ELECTRIC INCGeneral Wiring
04/04/2022CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
12/05/2021CompleteSTEVEN FARKAS—
03/03/2021CompleteLINA ELECTRIC, CORP.General Wiring
10/14/2020CompleteLENS ELECTRIC, INC—
12/27/2019CompleteANTONIO CERIELLO ELEC INCGeneral Wiring
1 project · most recent 03/25/2026
FiledStatusContractorScope
03/25/2026Signed-offSUPREME RENOVATION A2Z IN3 scope_items
1 project · most recent 03/25/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/25/2026Signed-offSUPREME RENOVATION A2Z INTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/02/2026Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
04/02/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
04/02/2026Fire-Resistance Rated ConstructionWilliam Ryanprogress
04/02/2026FinalWilliam Ryanprogress
03/24/2026Fire-Resistance Rated ConstructionWilliam Ryanprogress
03/24/2026FinalWilliam Ryanprogress
03/24/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
03/24/2026Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
05/26/2023Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
05/26/2023Fire-Resistance Rated ConstructionAlexander Stoltzprogress
05/26/2023FinalAlexander Stoltzprogress
05/10/2023FinalAlexander Stoltzprogress
05/10/2023Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
05/10/2023Fire-Resistance Rated ConstructionAlexander Stoltzprogress
07/28/2022Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
▾Documents — 201 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/01/2026B00493868-I1Request digital key ↗
09/01/2026B00503710-I1Request digital key ↗
08/31/2026B00640855-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00400137-I1Request digital key ↗
▸Applications & Permits44
▸BISWORK PERMIT APPLICATION19
10/20/2021340757531Open ↗
11/25/2020340757531Open ↗
09/26/2018321066216Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
01/10/2022340757531Open ↗
01/06/2022340757531Open ↗
08/20/2020340757531Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWLPC Approval/Permit7
08/15/2026B00509517-I1Open ↗
08/13/2026B01321139-I1Open ↗
08/13/2026B00503710-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/11/2018321066216Open ↗
▸Seals & Professional Certifications51
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
11/17/2016340310620Open ↗
11/17/2016340374080Open ↗
12/26/2014321066216Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00493868-I1Open ↗
09/01/2026B00509517-I1Open ↗
09/01/2026B00503710-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B00776081-I1Open ↗
08/28/2026B00776081-I1Open ↗
08/24/2026B01321139-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026B00776081-I1Open ↗
08/25/2026B00783593-I1Open ↗
08/24/2026B01321139-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/20/2020340757531Open ↗
04/20/2016340374080Open ↗
04/15/2016340372661Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/20/2020340757531Open ↗
04/20/2016340374080Open ↗
04/15/2016340372661Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/20/2020340757531Open ↗
04/20/2016340374080Open ↗
04/15/2016340372661Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/01/2009320066744Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/01/2009320066744Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE4
06/16/2010320082860Open ↗
06/15/2010320082860Open ↗
05/07/2010320067823Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
09/02/2010320207165Open ↗
10/19/2009320082860Open ↗
08/25/2009320067823Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
01/10/2022340757531Open ↗
04/15/2016340372661Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00400137-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00503710-I1Open ↗
08/28/2026B00776081-P1Open ↗
08/17/2026B01321139-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
09/02/2010320207165Open ↗
10/19/2009320082860Open ↗
08/25/2009320067823Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/20/2016340374080Open ↗
04/15/2016340372661Open ↗
12/26/2014321066216Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/25/2020340757531Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/01/2009320066744Open ↗
▸Energy Compliance10
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/21/2022340757531Open ↗
02/24/2021321066216Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/20/2022340757531Open ↗
08/20/2020340757531Open ↗
▸BISNYCECC ANALYSIS1
08/20/2020340757531Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/02/2015340310620Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/26/2021321066216Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/20/2020340757531Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/26/2014321066216Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00503710-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/20/2022340757531Open ↗
11/25/2020340757531Open ↗
08/20/2020340757531Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
10/21/2022340757531Open ↗
11/17/2016340310620Open ↗
11/17/2016340374080Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL7
08/20/2020340757531Open ↗
04/20/2016340374080Open ↗
04/15/2016340372661Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
09/02/2010320207165Open ↗
10/19/2009320082860Open ↗
09/01/2009320066744Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS SIGNOFF2
10/21/2022340757531Open ↗
02/24/2021321066216Open ↗
▸BISFINAL1
02/24/2021321066216Open ↗
▸BISSUPERSEDING LETTER1
10/20/2021340757531Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
08/20/2020340757531Open ↗
09/24/2018321066216Open ↗
12/26/2014321066216Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/20/2022340757531Open ↗
02/26/2021321066216Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET5
12/26/2014321066216Open ↗
09/02/2010320207165Open ↗
09/01/2009320066744Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/20/2020340757531Open ↗
04/20/2016340374080Open ↗
04/15/2016340372661Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
08/31/2020321066216Open ↗
09/24/2018321066216Open ↗
07/08/2010320066744Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
10/20/2021340757531Open ↗
09/10/2018321066216Open ↗